• Title/Summary/Keyword: Actual discharge

Search Result 269, Processing Time 0.024 seconds

New methodologies to derive discharge limits considering operational flexibility of radioactive effluents from Korean nuclear power plants based on historical discharge data

  • Kang, Ji Su;Cheong, Jae Hak
    • Nuclear Engineering and Technology
    • /
    • v.54 no.3
    • /
    • pp.1003-1015
    • /
    • 2022
  • The new methodologies to derive discharge limits considering operational flexibility according to international safety standards were developed to help reduce the environmental releases of radioactive effluents from nuclear power plants (NPPs). To overcome the limitations of the two existing methods to set up discharge limits assuming a specific statistical distribution of the effluent discharge, two modified equations were newly proposed to directly derive a particular discharge limits corresponding to the target 'compliance probability' based on the actual annual discharge data for a specific NPP and radionuclide groups. By applying these to the actual yearly discharge data of 14 Korean NPPs for 7 radionuclide groups for the past 20 years, the applicability of two new methodologies to actual cases was demonstrated. The 'characteristic value' with approximately a 90% compliance probability for each Korean NPP and radionuclide group was proposed based on the results. The new approaches for setting up the discharge limits and the characteristic values developed in this study are expected to be effectively utilized to foster operator's efforts to progressively reduce the environmental releases of radioactive effluents of NPPs relative to the previous discharge data considering operational flexibilities.

Prediction of the Heat-Affected Zone in the Micro Electric Discharge Machining (미세 방전가공에서의 열영향층 예측)

  • Kim T.G.;Min B.K.;Lee S.J.
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2005.06a
    • /
    • pp.422-425
    • /
    • 2005
  • This study predicts the heat-affected zone (HAZ) after electrical discharge machining. To predict HAZ, the temperature distribution is calculated using FEM. Heat flux is calculated from electrical energy, and it can be assumed Gaussian distribution. Plasma channel expands as time goes. Copper and NAK80 are used as the workpiece material. The depth of HAZ in simulation is determined by temperature distribution. The simulation results were compared with a developed actual single discharge crater. Through investigating the cross section of simulated & actual craters, the depth of HAZ in simulation and experiment are compared. Simulation model can predict the crater shape.

  • PDF

Derivation of the Synthetic Unit Hydrograph at Ungaged Small Watershed (미계측 소하천수계의 합성단위도 유도)

  • 안상진;이억한
    • Water for future
    • /
    • v.19 no.2
    • /
    • pp.157-166
    • /
    • 1986
  • The objective of this study was to determine the best representative synthetic unit hydrograph that is applicable to ungaged small watershed. A typical unit hydrograph was established with the actual data from a small watershed. Four currently well-known methods for analyzing ungaged small watershed, including Snyder's, Clark's S.C.S. and Nash methods, were evaluated with the data from the same small watershed. The following observations were noted from the analysis of four methods. The Snyder's method yielded the similar peak discharge value as the typical unit hydrograph. With co-ordinates of three discharge values, i.e. 25%, 50% and 75% of peak discharge, were not adequate for deriving a typical unit hydrograph in ungaged small watershed. With Clark's method there shall be some way of obtaining the exact base length of time area diagram and isochrone of each reach of the stream. With Nash method peak discharge and base flow time are affected by the storage constant and gamma function argument; therefore, for deriving a more reliable and workable unit hydrograph one needs to select for the better estimation of storage constant and gamma function argument. In S.C.S. method peak discharge is directly related to the watershed area and inversely related to the time of peak diacharge. Therefore area with faster peak discharge yielded the higer peak discharge value. Although the peak discharge value obtained frome the S.C.S. method higher than the value obtained from the unit hydrograph developed from the actual data, this method contains a number of advantageous factors. The peak discharge value and the time of peak discharge can be claculated easity from the morphological characteristics of the watershed, and in S.C.S method co-ordinates of the unit hydrograph can be calculated easily from that of the dimensionless unit hydrograph. When the four currently used methods were evaluated with a typical unit hydrograph obtained from the actual data, the S.C.S method was show to be the best method in deriving a synthetic unit hydrograph for ungaged small watershed.

  • PDF

The Outcomes of Early Discharge Program for Extremely Low Birth Weight Infants (초극소미숙아를 위한 조기 퇴원 프로그램의 운영 성과)

  • Lee, Eun-Jung;Yi, Young-Hee
    • Journal of Korean Critical Care Nursing
    • /
    • v.4 no.1
    • /
    • pp.25-35
    • /
    • 2011
  • Purpose: The purpose of this study was to evaluate the actual outcomes of early discharge program for extremely low birth weight (ELBW) infants. Methods: Medical records of 122 ELBW infants admitted in the neonatal intensive care unit from January 2000 to June 2006 and those of their 112 mothers were analyzed retrospectively. Results: After being applied early discharge program to ELBW infants' mothers, their infants' lengths of stay, gestational age and body weight at discharge, duration of completion of oral feeding, number of emergency room visits after discharge were decreased and number of breast milk feeding was increased. Conclusion: Early discharge program for ELBW infants can be an effective intervention for parents and their ELBW infants contributing to neonatal nursing practices.

  • PDF

Evaluation of flood frequency analysis technique using measured actual discharge data (실측유량 자료를 활용한 홍수량 빈도해석 기법 평가)

  • Kim, Tae-Jeong;Kim, Jang-Gyeong;Song, Jae-Hyun;Kim, Jin-Guk;Kwon, Hyun-Han
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.5
    • /
    • pp.333-343
    • /
    • 2022
  • For water resource management, the design flood is calculated using the flood frequency analysis technique and the rainfall runoff model. The method by design flood frequency analysis calculates the stochastic design flood by directly analyzing the actual discharge data and is theoretically evaluated as the most accurate method. Actual discharge data frequency analysis of the measured flow was limited due to data limitations in the existing flood flow analysis. In this study, design flood frequency analysis was performed using the measured flow data stably secured through the water level-discharge relationship curve formula. For the frequency analysis of design flood, the parameters were calculated by applying the bayesian inference, and the uncertainty of flood volume by frequency was quantified. It was confirmed that the result of calculating the design flood was close to that calculated by the rainfall-runoff model by applying long-term rainfall data. It is judged that hydrological analysis can be done from various perspectives by using long-term actual flow data through hydrological survey.

Sediment Properties and Long-term Bed Change of Munsancheon (문산천의 유사특성 및 장기하상변동 예측)

  • Lee, Jae-Geun;Ahn, Jae-Hyun
    • Journal of Wetlands Research
    • /
    • v.13 no.2
    • /
    • pp.329-341
    • /
    • 2011
  • This study was conducted with the national river, Munsancheon, which is located in Paju-si, Gyeonggi-do. The sediment discharge of Munsancheon was directly measured to analyze the sediment characteristics, and the results were used in the numerical model to predict the long-term river bed variation. The flow-total sediment discharge relation was derived using the measured total sediment discharge, and the results were compared with the total sediment discharge that was calculated using the existing prediction formula to derive a proper sediment discharge prediction method. In the actual measurements, the total annual sediment discharge was 5,478 ton/year, and the specific sediment discharge was 29.23 ton/$km^2$/year. The Ackers & White formula resulted in the values very close to the actual measurements. With the actual sediment discharge, geographical and hydrologic data as the input variables, HEC-6 and GSTARS models were comparatively analyzed. The test results showed that the HEC-6 model is suitable for the reliable prediction of the long-term river bed variation. Accordingly, the model was used for the long-term river bed variation prediction in this study. In the case of Munsancheon, deposition was continued in the downstream area and erosion occurred in the upstream area on the whole. It was expected that the stream would be stabilized in the river bed condition of 20 years later. The river bed variation was within 1 m, which was at the significance level. In the downstream area that is influenced by tide, however, the accumulation was continuously increasing within the section 2,000-7,000 m from the outlet. It seems that this should be considered in establishing the river management plans.

Fabrication of Atmospheric Coplanar Dielectric Barrier Discharge and Analysis of its Driving Characteristics (평면형 대기압 유전장벽방전장치의 제작 및 동작특성분석)

  • Lee, Ki-Yung;Kim, Dong-Hyun;Lee, Ho-Jun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.1
    • /
    • pp.80-84
    • /
    • 2014
  • The discharge characteristics of Surface Dielectric Barrier Discharge (SDBD) reactor are investigated to find optimal driving condition with adjusting various parameter. When the high voltage with sine wave form is applied to SDBD source, successive pulsed current waveforms are observed owing to multiple ignitions through the long discharge channel and wall charge accumulation on the dielectric surface. The discharge voltage, total charge between dielectrics, mean energy and power are calculated from measured current and voltage according to electrode gap and dielectric thickness. Discharge mode transition from filamentary to diffusive glow is observed for narrow gap and high applied voltage case. However, when the diffusive discharge is occurred with high applied voltage, the actual firing voltage is always lower than that with low driving voltage. The $Si_3N_4$, $MgF_2$, $Al_2O_3$ and $TiO_2$ are considered for dielectric protection and high secondary electron emission coefficient. SDBD with $MgF_2$ shows the lowest breakdown voltage. $MgF_2$ thin film is proposed as a protection layer for low voltage atmospheric dielectric barrier discharge devices.

Estimation of discharge coefficients of the broad-crested side weir with various levee's side slope of main channel (본류수로의 제방사면경사에 따른 광정횡월류위어의 유량계수 산정)

  • Kang, Ho-Seon;Cho, Hong-Je
    • Journal of Korea Water Resources Association
    • /
    • v.49 no.11
    • /
    • pp.941-949
    • /
    • 2016
  • The flow characteristics of the broad-crested side weir considering the levee's side slope of main channel ($ES_{ch}$) was investigated through hydraulic experiment in order to estimate the discharge coefficient equation. For applicability to actual river, levee's side slope of main channel 1:0.5, 1:1 and 1:2 were selected. Experimental results show that the new estimated equation for the discharge coefficient including $ES_{ch}$ is reasonable and effective in actual applications by comparing estimated and measured discharge over side weirs. Through a multiple linear regression analysis the importance of variabes were ordered as $ES_{ch}$ > $h/y_u$ > $L/y_u$ > $Fr_u$. Especially the discharge coefficient equation without $Fr_u$ was suggested, and the high applicability was reviewed by comparing the measured and calculated overflow of broad-chested side weir.

A Method of Rating Curve Adjustment (수위유량곡선보정방법에 대하여)

  • 박정근
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.18 no.2
    • /
    • pp.4116-4120
    • /
    • 1976
  • With the use of many rivers increased nearly to the capacity, the need for information concerning daily quantities of water and the total annual or seasonal runoff has became increased. A systematic record of the flow of a river is commonly made in terms of the mean daily discharge Since. a single observation of stage is converted into discharge by means of rating curve, it is essential that the stage discharge relations shall be accurately established. All rating curves have the looping effect due chiefly to channel storage and variation in surface slope. Loop rating curves are most characteristic on streams with somewhat flatter gradients and more constricted channels. The great majority of gauge readings are taken by unskilled observers once a day without any indication of whether the stage is rising or falling. Therefore, normal rating curves shall show one discharge for one gauge height, regardless of falling or rising stage. The above reasons call for the correction of the discharge measurements taken on either side of flood waves to the theoretical steady-state condition. The correction of the discharge measurement is to consider channel storage and variation in surface slope. (1) Channel storage As the surface elevation of a river rises, water is temporarily stored in the river channel. There fore, the actual discharge at the control section can be attained by substracting the rate of change of storage from the measured discharge. (2) Variation in surface slope From the Manning equation, the steady state discharge Q in a channel of given roughness and cross-section, is given as {{{{Q PROPTO SQRT { 1} }}}} When the slope is not equal, the actual discharge will be {{{{ { Q}_{r CDOT f } PROPTO SQRT { 1 +- TRIANGLE I} CDOT TRIANGLE I }}}} may be expressed in the form of {{{{ TRIANGLE I= { dh/dt} over {c } }}}} and the celerity is approximately equal to 1.3 times the mean watrr velocity. Therefore, The steady-state discharge can be estimated from the following equation. {{{{Q= { { Q}_{r CDOT f } } over { SQRT { (1 +- { A CDOT dh/dt} over {1.3 { Q}_{r CDOT f }I } )} } }}}} If a sufficient number of observations are available, an alternative procedure can be applied. A rating curve may be drawn as a median line through the uncorrected values. The values of {{{{ { 1} over {cI } }}}} can be yielded from the measured quantities of Qr$.$f and dh/dt by use of Eq. (7) and (8). From the 1/cI v. stage relationship, new vlues of 1/cI are obtained and inserted in Eq. (7) and (8) to yield the steady-state discharge Q. The new values of Q are then plotted against stage as the corrected steadystate curve.

  • PDF

Analysis of Industrial Battery lifetime Using Instantaneous Discharge Test (순간방전 시험에 의한 산업용 축전지 잔존수명 분석)

  • Kim, Chong-Min;Bang, Sun-Bae;Shong, Kil-Mok;Kim, Sun-Gu
    • Proceedings of the KIEE Conference
    • /
    • 2008.04b
    • /
    • pp.123-124
    • /
    • 2008
  • Battery is one of the emergency power. Battery reliability is a very important to keep up the minimum of building capabilities in case of interruption of electric power. Instantaneous discharge test is carried out for measuring transient voltage change(${\Delta}V$) and internal instantaneous impedance(Z), and then it is compared with discharge test results for the estimating the battery capacity. As a result, it was confirmed that the voltage change(${\Delta}V$) and the instantaneous impedance of the batteries failed in actual discharge test were higher that those of the sound batteries. Such an instantaneous discharge test can be a diagnosis of battery sound.

  • PDF