• 제목/요약/키워드: Activity Schedule

검색결과 195건 처리시간 0.023초

시나리오 기반 조선 실행계획 평가 향상을 위한 시뮬레이션 시스템 개발 -패널라인 개발 사례를 중심으로- (Design and Development of Scenario-Based Simulation System to Improve Shipbuilding Execution Scheduling Assessment -A Case Study on Panel Line-)

  • 백명기;김영민;황인혁;이광국;류철호;신종계
    • 한국CDE학회논문집
    • /
    • 제18권3호
    • /
    • pp.211-223
    • /
    • 2013
  • Today's ever-increasingly competitive shipbuilding market makes it essential for a shipbuilding company to have more efficient production processes and higher productivity as well as better design ability to obtain its competitiveness. A well-established production execution schedule plays an indispensable role to achieve this goal. Most shipbuilding companies carry out an evaluation on their mid-term plan once it is established. However, no evaluation activity exists for a production execution schedule, because practically all the companies depend on the field workers for the production execution scheduling. In this study, a prototype of a ship production execution schedule evaluation system is developed based on the component based design (CBD) methodology. This system enables one to make a production execution schedule that reflects up-to-date shipyard situation and to validate whether the schedule is feasible or not by running a production simulation according to the schedule. Users can also make use of the system as a decision supporting tool that compares several different execution schedules and evaluates which one is the best execution schedule.

효율적 일상 관리를 위한 일정관리 어플리케이션의 설계와 구현 (Design and Implementation of Scheduler Applications for Efficient Daily Management)

  • 박은주;한승준;윤지민;임한규
    • 인터넷정보학회논문지
    • /
    • 제22권2호
    • /
    • pp.41-50
    • /
    • 2021
  • IT기술과 정보처리 기술의 발전에 따라 인터넷 사용량이 급증하고 다양한 스마트 기기들이 출현하고 있다. 이에 따라 현대인들은 장소와 시간에 구애받지 않고 원하는 정보 획득, 여가활동과 같은 일상생활에 스마트 폰을 사용한다. 본 논문에서는 일정을 기록하고 약속을 공유하는 등 일상생활의 효과적 관리에 도움이 되는 일정관리 어플리케이션을 설계하고 이를 구현하였다. 본 논문의 일정관리 어플리케이션은 일정등록과 함께 일기작성 기능, 등록한 일정을 카카오톡을 이용하여 다른 사용자들과 공유할 수 있는 기능, 삭제 시 특정 폴더로 삭제한 일정이나 일기를 저장하는 기능, 하루 일정에 대한 연속적인 알림 기능 등을 제공한다. 다른 일정관리 앱들과 차별점을 가지며 사용성을 높인 본 논문의 어플리케이션은 바쁜 일상생활의 효율적 관리에 도움이 될 것이라 기대한다.

A NESTING APPROACH IN DISCRETE EVENT SIMULATION FOR INTEGRATING CONSTRUCTION OPERATION AND SCHEDULE MODELS

  • Chang-Yong Yi;Chan-Sik Park;Doo-Jin Lee;Dong-Eun Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.400-408
    • /
    • 2009
  • Simulation applications for analyzing the productivity of construction operations at operation level and project schedules at project level are crucial methods in project management. The application at two different levels should be very tightly linked to each other in practice. However, appropriate integration at the levels is not achieved in that existing systems do not support to integrate operation models into a schedule model. This paper presents a new approach named to Discrete Event Simulation-Nesting modeling approach, which supports not only productivity analysis at operation level but also schedule management at a project level. The system developed by the authors allows creating operation models at the operation level, maintaining them in operation model library, executing sensitivity analysis to find the behaviors of the operation models when different combination of resources are used as existing DES systems do. On top of the conventional functions, the new system facilitates to find the optimum solution of resource combinations which satisfy the user's interest by computing the hourly productivity and the hourly cost of the operation. By drag-and-dropping an operation model kept in the operation model library, the operation models are integrated into an activity of the schedule model. When a complete schedule model is established by nesting operation models into the schedule model, stochastic simulation based scheduling is executed. A case study is presented to demonstrate the new simulation system and verify the validity of the system.

  • PDF

Screening of Korean medicinal plants for antitumor activity

  • Chang, Il-Moo;Woo, Won-Sick
    • Archives of Pharmacal Research
    • /
    • 제3권2호
    • /
    • pp.75-78
    • /
    • 1980
  • Potential antinumor activity of sixteen Korean medicinal plants was tested against leukemia SN 36, murine tomor model. Survival studies by measuring life span indicated that Morus alba (Moraceae), Verbascum phlomoides (Scrophulariaceae), Curcuma longa (Zingbieraceae), Torilis japonica (Umbelliferae), Bupleurum falcatum (Umbelliferae) and Codonopsis pilosula (Campanulaceae) exhibited significant antitumor activity with the dose-schedule employed in the experiment. Methanol (70%) extracts of Platycodon gradiflorum (Campanulaceae), Bupleurum longeradiatum (Umbelliferae) and Asiasarum sieboldii (Aristolochiaceae) showed rather potent toxicity.

  • PDF

산출내역서.공정 통합관리 모형 구축에 관한 연구 (Work Management Model to Integrate Schedule and Bill of Quantit)

  • 박홍태;박찬정
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2002년도 학술.기술논문발표회
    • /
    • pp.123-131
    • /
    • 2002
  • Recently our government operates earned value management system (EVMS) for improving work management system of the construction projects over specific scale. The EVMS is based on the integrated management between construction cost and schedule, the existing systems, however, are focused on the cost management by using wort quantity. This study suggests a work management mode1 to integrate construction cost with activity information. The model introduces a work task concept as a tool that can connect construction cost to activity information. The suggested model in this study is verified by using actual data for the applicability to practical construction projects.

  • PDF

철도시설의 효율적 4D구현을 위한 개선된 Morphing 시각화 방법론 구축 (Improved Morphing Visualization Methodology for Effective 4D Expression of Railway Facility)

  • 문현석;권중희;김창학;지상복;강인석
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2006년도 추계학술대회 논문집
    • /
    • pp.350-353
    • /
    • 2006
  • Generally, 4D CAD can be used for visualizing construction schedule information in railway construction project. It is important that 3D CAD object should be represented by real construction situation according to construction site condition. However, it is difficult to visualize real construction situation in 4D CAD viewer because 3D objects should be separated by limited duration of each activity. This study suggests a morphing technology for visualizing 4D object by each activity schedule according to real construction progress.

  • PDF

산출내역서.공정 통합관리 모형 구축에 관한 연구 (Work Management Model to Integrate Schedule and Bill of Quantity)

  • 박홍태;박찬정
    • 한국건축시공학회지
    • /
    • 제2권4호
    • /
    • pp.153-161
    • /
    • 2002
  • Recently our government operates earned value management system (EVMS) for improving work management system of the construction projects over specific scale. The EVMS is based on the integrated management between construction cost and schedule. the existing systems, however, are focused on the cost management by using work quantity. This study suggests a work management model to integrate construction cost with activity information. The model introduces a work task concept as a tool that can connect construction rest to activity information. The suggested model in this study is verified by using actual data for the applicability to practical construction projects.

STOCHASTIC CASHFLOW MODELING INTEGRATED WITH SIMULATION BASED SCHEDULING

  • Dong-Eun Lee;David Arditi;Chang-Baek Son
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.395-398
    • /
    • 2011
  • This paper introduces stochastic cash-flow modeling integrated with simulation based scheduling. The system makes use of CPM schedule data exported from commercial scheduling software, computes the best fit probability distribution functions (PDFs) of historical activity durations, assigns the PDFs identified to respective activities, simulates the schedule network, computes the deterministic and stochastic project cash-flows, plots the corresponding cash flow diagrams, and estimates the best fit PDFs of overdraft and net profit of a project. It analyzes the effect of different distributions of activity durations on the distribution of overdrafts and net profits, and improves reliability compared to deterministic cash flow analysis.

  • PDF

The Efficacy of Visual Activity Schedule Intervention in Reducing Problem Behaviors in Children With Attention-Deficit/Hyperactivity Disorder Between the Age of 5 and 12 Years: A Systematic Review

  • Thomas, Naveena;Karuppali, Sudhin
    • Journal of the Korean Academy of Child and Adolescent Psychiatry
    • /
    • 제33권1호
    • /
    • pp.2-15
    • /
    • 2022
  • Objectives: Children with attention-deficit/hyperactivity disorder (ADHD) tend to be noisy and violate rules with their disruptive behaviors, resulting in greater difficulties with off-task behaviors and being at risk for social refusal. The visual activity schedule (VAS) intervention program is a frequently used method to teach multiple skills involving on-task, use of schedules, transition behaviors, social initiation, independent play skills, classroom skills, and academic skills. The current systematic review aimed to examine the efficacy of using VAS intervention in reducing problem behaviors in children with ADHD between 5 and 12 years of age. Methods: Systematic searches were conducted using two electronic databases (PubMed and Scopus) to identify relevant studies published in English between 2010 and 2020. Four studies met the inclusion criteria: two studies examined the effect of schedule-based tasks and the use of an iPad on classroom skills, while the other two examined randomized clinical trials (RCTs) of psychosocial treatment for ADHD inattentive type and a cross-sectional study examined the impact of the group size on task behavior and work productivity in children with ADHD. Results: The findings indicate that the interventions used in all four studies could lead to increased satisfaction among participants and parents, as well as a reduction in problem behavior. In terms of the research indicators, the RCT had low quality, while the others were of high quality. Conclusion: A larger number of studies and the ADHD clinical population would help to increase the generalizability of future reviews of treatments in this context.

PERT/CPM을 이용한 Activity에 대한 연결 공정관리가 가능한 프로젝트 관리 시스템의 설계 및 구현 (Design and implementation of a project management system capable of process management by Activity using PERT/CPM)

  • 박선이;박희숙
    • 한국정보통신학회논문지
    • /
    • 제26권5호
    • /
    • pp.802-807
    • /
    • 2022
  • 다중 프로젝트 관리가 요구되고 생산 활동(Activity)에 대한 공정이 반복, 연계 형태로 진행되는 프로젝트에서는 Activity에 대한 공정을 반복 입력하거나, 공정을 단계별로 관리하는 방법에서 공정별로 부하를 분석해야 하는 일은 매우 어려운 작업이다. 본 논문에서는 프로젝트에 수반된 Activity 정의와 프로젝트 공정에 대한 정의를 기준으로 Activity에 대해서 연결 공정을 자동 생성하고 공정별로 일정 및 자원관리를 유기적으로 유지하고 또한 세부 공정별로 일정 및 자원 계획 수립이 가능하며, 해당 공정에 대한 부하 분석을 실시간으로 제공할 수 있다. 그리고 계획 대비 실적 분석 등 프로젝트 진행 관리에 드는 시간과 비용을 향상하고, 프로젝트 진행할 때 발생할 수 있는 제반 문제점을 예측하여, 필요한 양의 자원 배분을 효과적으로 수행할 수 있는 프로젝트 관리시스템을 제시한다.