Browse > Article
http://dx.doi.org/10.7315/CADCAM.2013.211

Design and Development of Scenario-Based Simulation System to Improve Shipbuilding Execution Scheduling Assessment -A Case Study on Panel Line-  

Back, Myunggi (Department of Naval Architecture and Ocean Engineering, Seoul National University)
Kim, Youngmin (Department of Naval Architecture and Ocean Engineering, Seoul National University)
Hwang, Inhyuck (Department of Naval Architecture and Ocean Engineering, Seoul National University)
Lee, Kwang-Kook (Department of Naval Architecture, Ocean and IT Engineering of Kyungnam University)
Ryu, Cheolho (Department of Naval Architecture and Ocean Engineering, Inha Technical College)
Shin, Jong Gye (Department of Naval Architecture and Ocean Engineering, Seoul National University)
Abstract
Today's ever-increasingly competitive shipbuilding market makes it essential for a shipbuilding company to have more efficient production processes and higher productivity as well as better design ability to obtain its competitiveness. A well-established production execution schedule plays an indispensable role to achieve this goal. Most shipbuilding companies carry out an evaluation on their mid-term plan once it is established. However, no evaluation activity exists for a production execution schedule, because practically all the companies depend on the field workers for the production execution scheduling. In this study, a prototype of a ship production execution schedule evaluation system is developed based on the component based design (CBD) methodology. This system enables one to make a production execution schedule that reflects up-to-date shipyard situation and to validate whether the schedule is feasible or not by running a production simulation according to the schedule. Users can also make use of the system as a decision supporting tool that compares several different execution schedules and evaluates which one is the best execution schedule.
Keywords
Component based design; Digital manufacturing; Manufacturing execution system; Shipbuilding execution scheduling; Shipbuilding simulation;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 Panetto, H., Baina, S. and Morel, G., 2007. Mapping the IEC 62264 Models onto the Zachman Framework for Analysing Products Information Traceability: a Case Study, Journal of Intelligent Manufacturing, 18(6), pp.679-698.   DOI
2 Bae, Y.I., Lee, C.H. and Park, C.S., 2009, Competitiveness of the Shipbuilding Industry Diagnosis of Korea, CEO Information, 690.
3 Lee, J.M., Cho, S.W., Choi, Y.R. and Shin, J.G., 2006, A Development of Planning Evaluation Framework for Large Scale Shipyard, Proceedings of the Korean Institute of Industrial Engineers, Fall, (http://www.kiie.org).
4 Cho, K.K., Oh, S.C. and Yang, T.Y., 1985, Operations Scheduling for Multi-item, Small-sized Production, Journal of the Korean Institute of Industrial Engineers, 11(2), Dec., pp.57-73.   과학기술학회마을
5 Lee, S.W. and Kim, H.J., 1995, Erection Process Planning & Scheduling using Genetic Algorithm, Transactions of the Society of Naval Architecture of Korea, 32(1), pp.9-16.   과학기술학회마을
6 Koh, S.G., 1996, A Production Schedule with Genetic Algorithm in Block Assembly Shop, Journal of the Korean Operations Research and Management Science Society, 13(1), pp.1-12.   과학기술학회마을
7 Yoon, D.Y. and Kim, K.C., 1993, Concept Establishment for Developing Process Planning/Scheduling Support System, Transactions of the Society of Naval Architecture of Korea, 30(4), pp.37-40.
8 Kim, H.S., Lee, D.H., Bang, K.W., Cheon, H.K. and Kwak, I.S., 2010, Establishing Execution Schedule System in Shipbuilding Industry, Proceedings of the Korean Institute of Industrial Engineers, Fall, (http://www.kiie.org).
9 Karnouskos, S., Baecker, O., De Souza, L.M.S. and Spiess, P., 2007. Integration of SOA-Ready Networked Embedded Devices in Enterprise Systems via a Cross-Layered Web Service Infrastructure, 12th IEEE Conference on Emerging Technologies and Factory Automation, Cagliari, Italy, pp.293-300.
10 Koronios, A., Nastasie, D., Chanana, V. and and Haider, A., 2007. Integration Through Standards - An Overview of International Standards for Engineering Asset Management. 2nd World Congress on Engineering Asset Management and the Fourth International Conference on Condition Monitoring, Harrogate, United KingDom, pp.11-14.
11 Kong, M.D., 2011. A Study on the Efficient MES Using Automation in Automotive Module Assembly Line, Journal of the Korea Academia-Industrial Cooperation Society, 12(10), pp.4618-4625.   과학기술학회마을   DOI   ScienceOn
12 Cheon, B.S., 2004, NET Enterprise System Object-Oriented CBD Development Methodology, Young-Jin.com, Seoul, Korea, ISBN:9788931428780.
13 Lee, K., Shin, J.G. and Ryu, C., 2009, Development of Simulation Based Production Execution System in a Shipyard: A Case Study for a Panel Block Assembly Shop, Production Planning & Control, 20(8), pp.750-768.   DOI   ScienceOn
14 Woo, J.H., Lee, K.K., Jung, H.R., Kwon, Y.D. and Shin, J.G.., 2005, A Framework of Plant Simulation for a Construction of a Digital Shipyard, Journal of the Society of Naval Architects of Korea, 42(2), pp.165-174.   과학기술학회마을   DOI   ScienceOn