Kim, Jung-Su;Lee, Jae-Nam;Lee, Gi-Seung;An, Hyun-Jun
Proceedings of the KSR Conference
/
2006.11b
/
pp.675-682
/
2006
The command of Subway is intended to adjust and control the train operation, and to play a key role of the total passenger transport and all kinds of affairs related to the safe train operation. Also, this can be considered as affairs to be controlled and operated by Total Traffic Control. For the purpose of developing the ATO system in using the new control technology by substituting the conventional ATS equipment, this technical document includes the technical points resulted from doing the replacement construction in the entire section of Subway Line 2 by Seoul Metro. The replacement work with the new ATO System should neither stop nor affect the system under operation while operating the current ATS System. The different systems should not interfere with each other while performing their individual affairs, and be composed to share the important data for the parallel operation. This technology is needed to proceed in assurance of a high degree of reliability.
Automatic Transmission System(ATS) was designed to replace the human's manual operation of the gear box. So far, this system operates with the fixed shift pattern information. In this paper, new algorithm considering driver's operation tendency is proposed. Also, to get rid of the uselessly frequent shift of the ATS, the conditions and the status of the vehicle would be included for the evaluation in making a decision of shifting. A field test is done in a car equipped with the computer set connected to Transmission Control Units(TCU) to check the status of the test car, and it shows the excellency of the proposed algorithm.
경부고속철도의 개통과 함께 서울-부산 간 운행시간이 새마을호 기준 4시간 30분에서 2시간으로 단축되는 등 획기적인 시간 절감을 이루었으나 이는 고속철도가 운행되는 지역에 국한된 것이다. 이에 고속철도 비 수혜지역의 운행시간 단축을 위해 기존선 속도향상이 요구되며, 이러한 목적으로 한국철도기술연구원에서는 틸팅열차를 개발하여 시운전 10만Km를 목표로 시험운행중이다. 또한 한국철도공사에서는 이와 유사한 목적으로 기존선 신호시스템인 ATS 시스템을 차상신호시스템(ATP)으로 개량하는 사업이 추진되고 있다. 현재 틸팅열차에는 기존의 ATS(자동열차정지장치) 차상장치만을 장착하여 차량의 성능 확인을 위한 시험 및 시운전을 우선적으로 추진하고 있는 상태이며 이러한 ATS 차상장치는 160km/h 이하의 속도에서만 본연의 기능이 유지되고, 그 이상의 속도에서는 현실적으로 사용이 어렵기 때문에 틸팅열차의 목표속도인 200km/h에서 적합하게 시험하기 위해서는 적합하지 않다. 따라서 한국철도공사에서 추진하고 있는 ATP 구축사업의 지상설비와 연계될 수 있는 ATP 차상장치를 설치하여 시험을 하여야 한다. 본 논문에서는 이를 위하여 ATP 차상장치의 틸팅열차 적용에 대한 연구를 추진한 결과를 발표하고자 한다.
Son Young-Jin;Min Kyung-Yun;Lee Kang-Won;Bang Yeun-Gun
Proceedings of the KSR Conference
/
2004.10a
/
pp.162-167
/
2004
The ascent and descent market screen door (PSD-Platform Screen Door) between the electromotive car which is in the process of operating from the subway ascent and descent market and the passenger it is an immediacy and crisis as the system which it intercepts currently the inside and outside of the country of course signal system automatic operation signal system (ATO) establishment is operated from the segment. Manual operation signal system (the ATS and the ATC) almost it is a condition which is wholly lacking from the segment. This year from second half of the year 2 line manual operation signal system (ATS). It established the shutting tightly elder brother and the railing elder brother in PSD system in segment 12 reverses and the death accident due to the passenger hurt accident which occurs from the subway. It prevented an energy curtailment in the same time when it raises air cooling efficiency, It gathered it restricted the underground space which is comfortable in the use citizen and and and service it did interface the electromotive car and PSD entrance and exit literature course from the manual operation segment to sleep technically optimizationt. It researched a minute dust diffusion.
Platform Screen Door(PSD) has been installed and operated at seoul subway line $1\sim4$ in the manual train operation mode(ATS/ATC) by SeoulMetro since 2005. SeoulMetro uses the wireless (RF) communication system and the train door detection system for the link between the train and PSD doors opening/closing motion in the manual train operation mode. For the convenience and safety of passengers, the train doors and the PSD doors opening/closing shall be synchronized as much as possible. In ATO(Automatic Train Operation) mode which provides the interface between train control system and PSD system, ATO signaling system makes the train doors and PSD doors open/close command signals systematically, so PSD doors can be opened/closed almost simultaneously with the train doors. But, in the manual train control(ATS/ATC) mode, PSD system needs to detect the train doors open/close operation and make PSD open/close command signals to actuate PSD doors. These PSD open/close commanding process cause time delay of PSD doors opening/closing motion in response to the train doors opening/closing motion. Sometimes the response delay time can be over 1 second, which is not proper to operate PSD, and need to be reduced This paper presents the reduction method of the PSD response delay time to improve the convenience and safety of passengers.
This paper presents the result of VDL Mode 2 system design and implementation with AOA (ACARS Over AVLC) protocol based on international VDL Mode 2 specifications for the bit-oriented ATS applications. The designed VDL Mode 2 system is composed of airborne and ground subsystem. Airborne subsystem consists of VDR, CMU and Ground system consists of Ground Station and DSP. For the test of whole system, simplified CPDLC, ADS and AFN applications are implemented in test equipments.
본고에서는 special purpose를 위한 computer aided test system에 대한 고찰을 위해그 동안 본 연구실에서 연구개발, 제작완료하여 현재 양산 line에 사용되고 있는 "M/R ATS(Automatic Test System)" 를 일례로 그에 관한 개념적 사항에 대하여 중점 설명하고자 한다.
Proceedings of the Korean Society of Precision Engineering Conference
/
2005.06a
/
pp.714-717
/
2005
The concept of jigs and fixtures makes it possible to build fixtures that can be dismantled at project completion. Since this concept is modular, it is not limited to any particular unit shapes or sizes. Various standards assure that each component assemble rapidly, to get precision and accuracy. Best suited for prototype and low volume production, as well as, start-up or zero-runs, it can also substitute for damaged dedicated fixtures to minimize down-time. It need to do DB for each part by Pro/Engineer and to assemble before manufacturing. In the future will assemble each of clamping and position parts by automation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.