• Title/Summary/Keyword: ATS system

Search Result 137, Processing Time 0.033 seconds

A Study on the Parallel Control(Change) at the Total Traffic Control (종합열차운행제어의 병행 운전(교체) 방안에 관한 고찰)

  • Kim, Jung-Su;Lee, Jae-Nam;Lee, Gi-Seung;An, Hyun-Jun
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.675-682
    • /
    • 2006
  • The command of Subway is intended to adjust and control the train operation, and to play a key role of the total passenger transport and all kinds of affairs related to the safe train operation. Also, this can be considered as affairs to be controlled and operated by Total Traffic Control. For the purpose of developing the ATO system in using the new control technology by substituting the conventional ATS equipment, this technical document includes the technical points resulted from doing the replacement construction in the entire section of Subway Line 2 by Seoul Metro. The replacement work with the new ATO System should neither stop nor affect the system under operation while operating the current ATS System. The different systems should not interfere with each other while performing their individual affairs, and be composed to share the important data for the parallel operation. This technology is needed to proceed in assurance of a high degree of reliability.

  • PDF

The Decision Algorithm for Driving Intension Using Moduled Neural Network

  • Kang, Joon-Young;Kim, Seong-Joo;Seo, Jae-Yong;Jeon, Hong-Tae
    • Proceedings of the IEEK Conference
    • /
    • 2002.07c
    • /
    • pp.1768-1771
    • /
    • 2002
  • Automatic Transmission System(ATS) was designed to replace the human's manual operation of the gear box. So far, this system operates with the fixed shift pattern information. In this paper, new algorithm considering driver's operation tendency is proposed. Also, to get rid of the uselessly frequent shift of the ATS, the conditions and the status of the vehicle would be included for the evaluation in making a decision of shifting. A field test is done in a car equipped with the computer set connected to Transmission Control Units(TCU) to check the status of the test car, and it shows the excellency of the proposed algorithm.

  • PDF

The Study for Tilting Train Adaptation of ATP Onboard System (ATP 차상장치의 틸팅열차 적용에 대한 연구)

  • Baek, Jong-Hyen;Kim, Yong-Kyu;Shin, Duck-Ho;Lee, Kang-Mi
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.1012-1013
    • /
    • 2008
  • 경부고속철도의 개통과 함께 서울-부산 간 운행시간이 새마을호 기준 4시간 30분에서 2시간으로 단축되는 등 획기적인 시간 절감을 이루었으나 이는 고속철도가 운행되는 지역에 국한된 것이다. 이에 고속철도 비 수혜지역의 운행시간 단축을 위해 기존선 속도향상이 요구되며, 이러한 목적으로 한국철도기술연구원에서는 틸팅열차를 개발하여 시운전 10만Km를 목표로 시험운행중이다. 또한 한국철도공사에서는 이와 유사한 목적으로 기존선 신호시스템인 ATS 시스템을 차상신호시스템(ATP)으로 개량하는 사업이 추진되고 있다. 현재 틸팅열차에는 기존의 ATS(자동열차정지장치) 차상장치만을 장착하여 차량의 성능 확인을 위한 시험 및 시운전을 우선적으로 추진하고 있는 상태이며 이러한 ATS 차상장치는 160km/h 이하의 속도에서만 본연의 기능이 유지되고, 그 이상의 속도에서는 현실적으로 사용이 어렵기 때문에 틸팅열차의 목표속도인 200km/h에서 적합하게 시험하기 위해서는 적합하지 않다. 따라서 한국철도공사에서 추진하고 있는 ATP 구축사업의 지상설비와 연계될 수 있는 ATP 차상장치를 설치하여 시험을 하여야 한다. 본 논문에서는 이를 위하여 ATP 차상장치의 틸팅열차 적용에 대한 연구를 추진한 결과를 발표하고자 한다.

  • PDF

A Study on PSD System optimization from manual mode (수동 Mode에서 PSD System 최적화 연구)

  • Son Young-Jin;Min Kyung-Yun;Lee Kang-Won;Bang Yeun-Gun
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.162-167
    • /
    • 2004
  • The ascent and descent market screen door (PSD-Platform Screen Door) between the electromotive car which is in the process of operating from the subway ascent and descent market and the passenger it is an immediacy and crisis as the system which it intercepts currently the inside and outside of the country of course signal system automatic operation signal system (ATO) establishment is operated from the segment. Manual operation signal system (the ATS and the ATC) almost it is a condition which is wholly lacking from the segment. This year from second half of the year 2 line manual operation signal system (ATS). It established the shutting tightly elder brother and the railing elder brother in PSD system in segment 12 reverses and the death accident due to the passenger hurt accident which occurs from the subway. It prevented an energy curtailment in the same time when it raises air cooling efficiency, It gathered it restricted the underground space which is comfortable in the use citizen and and and service it did interface the electromotive car and PSD entrance and exit literature course from the manual operation segment to sleep technically optimizationt. It researched a minute dust diffusion.

  • PDF

PSD Door Response Time Improving Method in Train Manual Operation Mode (수동운전방식에서의 PSD 출입문 신호반응 시간 개선 방안 연구)

  • Lee, Moo-Ho;Kim, Chan-Cum;Lee, Suk-Jong;Lee, Soo-Young
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.559-571
    • /
    • 2008
  • Platform Screen Door(PSD) has been installed and operated at seoul subway line $1\sim4$ in the manual train operation mode(ATS/ATC) by SeoulMetro since 2005. SeoulMetro uses the wireless (RF) communication system and the train door detection system for the link between the train and PSD doors opening/closing motion in the manual train operation mode. For the convenience and safety of passengers, the train doors and the PSD doors opening/closing shall be synchronized as much as possible. In ATO(Automatic Train Operation) mode which provides the interface between train control system and PSD system, ATO signaling system makes the train doors and PSD doors open/close command signals systematically, so PSD doors can be opened/closed almost simultaneously with the train doors. But, in the manual train control(ATS/ATC) mode, PSD system needs to detect the train doors open/close operation and make PSD open/close command signals to actuate PSD doors. These PSD open/close commanding process cause time delay of PSD doors opening/closing motion in response to the train doors opening/closing motion. Sometimes the response delay time can be over 1 second, which is not proper to operate PSD, and need to be reduced This paper presents the reduction method of the PSD response delay time to improve the convenience and safety of passengers.

  • PDF

Design and development of VDL Mode 2 System (VDL 모드 2 데이터링크 시스템 설계 및 구현)

  • Bae, Joong-Won;Kim, Hyoung-Kyoung;Kim, In-Kyu;Kim, Tae-Sik
    • Aerospace Engineering and Technology
    • /
    • v.7 no.1
    • /
    • pp.30-39
    • /
    • 2008
  • This paper presents the result of VDL Mode 2 system design and implementation with AOA (ACARS Over AVLC) protocol based on international VDL Mode 2 specifications for the bit-oriented ATS applications. The designed VDL Mode 2 system is composed of airborne and ground subsystem. Airborne subsystem consists of VDR, CMU and Ground system consists of Ground Station and DSP. For the test of whole system, simplified CPDLC, ADS and AFN applications are implemented in test equipments.

  • PDF

회로설계 및 시험의 전산화(IV)

  • Jeong, Gi-Seo;O, Geun-Su
    • ETRI Journal
    • /
    • v.3 no.1.2
    • /
    • pp.12-17
    • /
    • 1981
  • 본고에서는 special purpose를 위한 computer aided test system에 대한 고찰을 위해그 동안 본 연구실에서 연구개발, 제작완료하여 현재 양산 line에 사용되고 있는 "M/R ATS(Automatic Test System)" 를 일례로 그에 관한 개념적 사항에 대하여 중점 설명하고자 한다.

  • PDF

Design System Development of the Modular Jig & Fixture (모듈러 지그와 픽스쳐의 설계 시스템 개발)

  • Jung H.S.;Lee W.R.;Park J.M.
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2005.06a
    • /
    • pp.714-717
    • /
    • 2005
  • The concept of jigs and fixtures makes it possible to build fixtures that can be dismantled at project completion. Since this concept is modular, it is not limited to any particular unit shapes or sizes. Various standards assure that each component assemble rapidly, to get precision and accuracy. Best suited for prototype and low volume production, as well as, start-up or zero-runs, it can also substitute for damaged dedicated fixtures to minimize down-time. It need to do DB for each part by Pro/Engineer and to assemble before manufacturing. In the future will assemble each of clamping and position parts by automation.

  • PDF