• Title/Summary/Keyword: AOQ

Search Result 17, Processing Time 0.021 seconds

Determination of a Required Index for the Testing Power Precision in Sensory Inspection (관능검사(官能檢査) 검출정도(檢出精度)의 요구지표(要求指標) 설정(說定))

  • Lee, Sang-Do;Song, Seo-Il;Gang, Ho-Uk
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.5 no.1
    • /
    • pp.19-25
    • /
    • 1979
  • This paper presents an analysis of the contents of job for the sensory inspection on the basis of the probability theory, and the new determination for an index(d') of the testing power precision in carrying out sensory inspections. Also presented are the evaluation method of determining the ability of inspector by presuming the confidence interval for the average record of inspector, and the computation method for the index (de') of the testing power precision required as the goal-value in accordance with quality character, process inferior ratio, and required AOQ.

  • PDF

Minimization of Inspection Cost in an Inspection System Considering the Effect of Lot Formation on AOQ

  • Yang, Moon-Hee
    • Management Science and Financial Engineering
    • /
    • v.16 no.1
    • /
    • pp.119-135
    • /
    • 2010
  • In this paper, we readdress the optimization problem for minimizing the inspection cost in a back-light unit inspection system, which forms a network including a K-stage inspection system, a source inspection shop, and a re-inspection shop. In order to formulate our objective function when the system is in a steady state, assuming that the number of nonconforming items in a lot follows a binomial distribution when a lot is formed for inspection, we make a steady-state network flow analysis between shops, and derive the steady-state amount of flows between nodes and the steady-state fraction defectives by solving a nonlinear balance equation. Finally we provide some fundamental properties and an enumeration method for determining an optimal value of K which minimizes our objective function. In addition, we compare our results numerically with previous ones.

Modified Two-Level Skip-Lot Sampling Plans (수정된 2단계 스킾-로트 샘플링 검사계획)

  • 최병철;천영민
    • Journal of Korean Society for Quality Management
    • /
    • v.29 no.1
    • /
    • pp.113-127
    • /
    • 2001
  • Skip-lot sampling plans for lot-by-lot inspection are more desirable than the continuous sampling plans for units in modern mass production system under the condition of the submitted product is good. Perry(1973a, 1973b) extended the Dodge(1955)′s skip-lot sampling plans to single and two-level skip-lot sampling plans and Parker & Kessler (1981) modified Perry(1973a)′s plans so that a sample of size one is taken from every lot skipped during the skipping mode. In this paper, Perry(1973b)′s two-level skip-lot sampling plans are modified by applying Parker & Kessler′s plan, designated as MTSkSP1, MTSkSP2, MTSkSP3. Operating characteristic(OC) functions, average sample numbers(ASN) and average outgoing qualities(AOQ) for the proposed plans are derived using Markov chain properties and compared each other and Perry′s plans. The proposed plans not only reduce the ASN but also avoid the danger skipping lots entirely when the lots are produced during sudden "out-of-control".

  • PDF

Optimal Inspection Model for Dependent Product Quality (종속품질의 최적검사 수리모형)

  • 유정상
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.21 no.47
    • /
    • pp.101-112
    • /
    • 1998
  • Recently, researchers show growing interest on product quality characteristic dependence and designing acceptance sampling plans under the quality dependence. This research intends to resolve a few theoretical and practical questions for better application of acceptance sampling when the quality characteristic of product items exhibits a statistical dependence and samples are inspected according to the production order. In this research, a mathematical programming model is developed for the economic modeling of sampling plans based on two evaluation criteria : the average outgoing quality(AOQ) and the average total inspection cost. An efficient solution procedure is then proposed using the functional structure of the two evaluation criteria and the procedure is numerically illustrated.

  • PDF

Design of a Continuous Screening Procedure in the Bivariate Normal Model (이변량 정규모형 하에서 연속생산형 스크리닝 절차의 설계)

  • Hong, Sung Hoon
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.31 no.2
    • /
    • pp.99-105
    • /
    • 2005
  • A quality inspection procedure interchangeably using the performance and surrogate variables is proposed. At the start of the inspection, the continuous performance variable is measured for all items. As soon as iconsecutive items are found to be conforming, the continuous surrogate variable is measured instead of the performance variable. If an item is rejected, the inspection based on the performance variable is resumed. It is assumed that the performance variable and the surrogate variable are jointly normally distributed with known means and standard deviations. The average outgoing quality (AOQ) expression is derived, and the methods of finding the inspection procedure with a specified average outgoing quality limit (AOQL) are presented.

Analysis of (K, r) Incomplete Inspection Policy for Minimizing Inspection Cost subject to a Target AOQ (출하 품질목표 조건하에 검사비용을 최소화하는(K, r) 부분검사정책의 분석)

  • Yang, Moon-Hee
    • IE interfaces
    • /
    • v.24 no.1
    • /
    • pp.87-96
    • /
    • 2011
  • In this paper, we address an optimization problem for minimizing the inspection and rework cost in an inspection-rework system, which forms a network of nodes including a K-stage inspection system, storage areas for items, a source inspection shop, and a re-inspection shop. We assume that (n, 0) acceptance sampling is performed in the source inspection shop and that only 100(1-r)% of items of rejected lots are re-inspected in the re-inspection shop. Since all the nodes are interrelated, in order to formulate our steady-state objective function, we make a steady-state network flow analysis between nodes, and derive both the steady-state amount of flows between nodes and the steady-state fraction defectives by solving a nonlinear balance equation. Finally we provide some fundamental properties and an enumeration procedure for determining the optimal values of (K, r) which both minimizes our objective function and attains a given target average outgoing quality.

Design of Rectifying Screening Inspections under a Bivariate Normal Distribution (이변량 정규분포 하에서 선별형 스크리닝 검사의 설계)

  • Hong, Sung-Hoon;Choi, Ik-Jun;Lee, Yoon-Dong;Lee, Min-Koo;Kwon, Hyuck-Moo
    • Journal of Korean Society for Quality Management
    • /
    • v.35 no.4
    • /
    • pp.147-158
    • /
    • 2007
  • Owing to the rapid growth in automated manufacturing systems, screening inspection becomes an attractive practice for removing nonconforming items, and it has been suggested that inspection will essentially become an inherent part of modem manufacturing processes. In this paper, we propose rectifying screening inspections which allow quality practitioners to use performance and surrogate variables interchangeably in real-time applications. Two screening inspections are considered; a statistically-based screening inspection to reduce the current proportion of nonconforming items to a specified AOQ(average outgoing quality) after screening, and an economically-based screening inspection where the tolerance limit is determined so that the expected total cost is minimized. It is assumed that the performance variable and the surrogate variable are jointly normally distributed. For two screening inspections, methods of finding the optimal solutions are presented and numerical examples are also given.