Minimization of Inspection Cost in an Inspection System Considering the Effect of Lot Formation on AOQ

  • Yang, Moon-Hee (Department of Industrial Engineering, Dankook University)
  • 투고 : 2010.03.15
  • 심사 : 2010.05.04
  • 발행 : 2010.05.31

초록

In this paper, we readdress the optimization problem for minimizing the inspection cost in a back-light unit inspection system, which forms a network including a K-stage inspection system, a source inspection shop, and a re-inspection shop. In order to formulate our objective function when the system is in a steady state, assuming that the number of nonconforming items in a lot follows a binomial distribution when a lot is formed for inspection, we make a steady-state network flow analysis between shops, and derive the steady-state amount of flows between nodes and the steady-state fraction defectives by solving a nonlinear balance equation. Finally we provide some fundamental properties and an enumeration method for determining an optimal value of K which minimizes our objective function. In addition, we compare our results numerically with previous ones.

키워드

참고문헌

  1. Dodge, H. F. and H. G. Romig, "A method of sampling inspection," Bell System Technical Journal 8 (1929), 613-631. https://doi.org/10.1002/j.1538-7305.1929.tb01240.x
  2. Wetherill, G. M. and W. K. Chiu, "A Review of Acceptance Sampling Schemes with Emphasis on the Economic Aspect," International Statistical Review 43, 2 (1975),191-210. https://doi.org/10.2307/1402898
  3. Yang, M., "A Design and Case Study of a K-Stage BLU Inspection System for Achieving a Target Defective Rate," International Journal of Management Science 13, 2 (2007), 141-157.
  4. Yang, M. and S. M. Kim, "Minimization of Inspection Cost in a BLU Inspection System Using a Steady-State Flow Analysis," International Journal of Management Science 15, 2 (2009), 53-68.