Introducing and Surveying 4D Models in AEC Industry (4D 공정관리시스템의 개발현황 조사연구)

  • Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.137-142
    • /
    • 2001
  • The traditional schedule management system provides project manager with analysis reports, such as progress control, earned value management and resource management, including schedule chart. However, the reports and functions in the traditional system are still limited in 2D concept. Recently, the scheduling method is using 4D concept that time of construction schedule is linked to space of drawings. This study presents the limitation of those systems and an improved method for developing 4D system through the comparative analysis of representative 4D systems that are developed up to date.

  • PDF

Earned Value Management Systems Using 4D-CAD (4D CAD 활용을 통한 공정-원가 통합 시스템)

  • Park Ji-Ho;Jung Young-Soo;Kim Sung-Mo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.504-508
    • /
    • 2003
  • Cost and schedule are the major concerns for the successful construction project management. The four dimensional CAD (4D CAD) integrating graphical data and scheduling data has also been an area of research interests for improving construction controls. In order to achieve the benefits from these areas in an integrated way, this study proposes a 4D-EVMS system for the owners. Managerial requirements for cost and schedule control for the owners are identified first. A 4D-EVMS model is then proposed which provides functional flexibility in order to enhance the efficiency of the system. Lessons learned and practical implications are briefly summarize.

  • PDF

A Subthreshold PMOS Analog Cortex Decoder for the (8, 4, 4) Hamming Code

  • Perez-Chamorro, Jorge;Lahuec, Cyril;Seguin, Fabrice;Le Mestre, Gerald;Jezequel, Michel
    • ETRI Journal
    • /
    • v.31 no.5
    • /
    • pp.585-592
    • /
    • 2009
  • This paper presents a method for decoding high minimal distance ($d_{min}$) short codes, termed Cortex codes. These codes are systematic block codes of rate 1/2 and can have higher$d_{min}$ than turbo codes. Despite this characteristic, these codes have been impossible to decode with good performance because, to reach high $d_{min}$, several encoding stages are connected through interleavers. This generates a large number of hidden variables and increases the complexity of the scheduling and initialization. However, the structure of the encoder is well suited for analog decoding. A proof-of-concept Cortex decoder for the (8, 4, 4) Hamming code is implemented in subthreshold 0.25-${\mu}m$ CMOS. It outperforms an equivalent LDPC-like decoder by 1 dB at BER=$10^{-5}$ and is 44 percent smaller and consumes 28 percent less energy per decoded bit.

Efficient VLSI Architecture for Lifting-Based 2D Discrete Wavelet Transform Filter (리프팅 기반 2차원 이산 웨이블렛 변환 필터의 효율적인 VLSI 구조)

  • Park, Taegu;Park, Taegeun
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.37A no.11
    • /
    • pp.993-1000
    • /
    • 2012
  • In this research, we proposed an efficient VLSI architecture of the lifting-based 2D DWT (Discrete Wavelet Transform) filter with 100% hardware utilization. The (9,7) filter structure has been applied and extendable to the filter length. We proposed a new block-based scheduling that computes the DWT for the lower levels on an "as-early-as-possible" basis, which means that the calculation for the lower level will start as soon as the data is ready. Since the proposed 2D DWT computes the outputs of all levels by one row-based scan, the intermediate results for other resolution levels should be kept in storage such as the Data Format Converter (DFC) and the Delay Control Unit (DCU) until they are used. When the size of input image is $N{\times}N$ and m is the filter length, the required storage for the proposed architecture is about 2mN. Since the proposed architecture processes the 2D DWT in horizontal and vertical directions at the same time with 4 input data, the total period for 2D DWT is $N^2(1-2^{-2J})/3$.

An Uplink Scheduling Algorithm for VoIP in IEEE 802.16d Systems (IEEE 802.160에서 상향링크 VoIP 스케줄링 알고리즘 방식 연구)

  • Kang, Min-Seok;Jang, Jae-Shin
    • Journal of the Korea Society for Simulation
    • /
    • v.15 no.3
    • /
    • pp.87-91
    • /
    • 2006
  • With the growth of the internet, the number of wireless internet users has increased continuously up to date. However, mobile communications could not support high speed transmission rate with cheap communication fee and wireless LAN has problems in providing terminal mobility and wide area connectivity, respectively. So the WMAN standard has been newly designed to make up for these limits. The initial 802.16 specification effectively offers a solution for providing fixed users with high speed wireless communication but it does not offer terminal mobility. So the 802.16d and 802.16e have been developed as the next generation solution that can support various PHY layer (SC, SCa, OFDM, OFDMA) and offer the terminal mobility. In this paper, we propose an effective uplink scheduling algorithm for VoIP with using UGS, and we show that our proposed algorithm is superior in view of average delay and management of uplink bandwidth to conventional rtPS algorithm and the scheme in reference, with using NS-2 network simulator.

  • PDF

Simplified Methodology to Generate 2D/3D Object in 4D system for Civil Engineering Projects (토목시설물 4D구현을 위한 2D/3D 객체 생성 간편화 기법)

  • Lee Syeung-Youl;Lee Yong-Soo;Kim Chang-Hak;Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.585-588
    • /
    • 2003
  • This study attempts to develop a skeleton model to link construction schedule and 3D object for drawings in 4D system. Generally, the construction schedule and 3D object can be linked in 4D system by imported files which are made in specific S/Ws such as CAD S/W and scheduling S/W. Those methods have a difficulties for operating 4D data because extra work needs to link 4D data for each activity. This study develops a 4D model which the 4D data can be self-generated within the system. The suggested model can reduce the initial input data for new project by integrating schedule and 3D object in 4D system.

  • PDF

Gain Scheduling Controller Design and Performance Evaluation for Thrust Control of Variable Thrust Solid Rocket Motor (가변 추력 고체추진기관의 추력 제어를 위한 이득 계획 제어기 설계 및 성능 분석)

  • Hong, SeokHyun
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.20 no.1
    • /
    • pp.28-36
    • /
    • 2016
  • Theoretical model of a variable thrust solid rocket motor with a pintle nozzle was derived. For the chamber pressure control, classical model linearization and proportional-intergral controller was used. And then two types of gain scheduling controller were suggested to imporve controller performance for the non-linear propulsion model. Considering characteristics of systems, control gains were scheduled by chamber pressure or free volume. Step responses of each controllers were compared. As a result, the proper control algorithm about characteristics of variable thrust rocket motor was suggested.

Analysis on the Relationship of MOT and NPD Performance -Medium-Sized Manufacturing Firms- (기술경영과 신제품개발 성과와의 관계분석 -중규모 제조기업을 중심으로-)

  • Park, Chul Min
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.7 no.4
    • /
    • pp.159-168
    • /
    • 2012
  • The purpose of this study is to analyze the relationship of MOT and NPD performance in medium-sized manufacturing firms. To accomplish the purpose of the study, working hypotheses were established based on the literatures about the impacts of MOT factors on the NPD performance. The sample of this study is as follows : 12 electrical and electronics companies, 18 machine and engineering companies, 16 parts and materials companies. In order to verify hypotheses, the data were collected from team leader and manager of research center, R&D, and production department of these companies and the leader of R&D project team who all had experience in project or were participating in it in latest 3 years. The results of study were summarized as follows : First, in analysis on the reality of MOT factors in sample firms, will of top management level on the MOT was comparatively high but relatedness of business strategy and technology strategy, open R&D system, systematic time scheduling, management of R&D manpower, and developing and adapting PLM system were common level. Second, to improve NPD performance in medium-sized manufacturing firms, will of top management level on the MOT, relatedness of business strategy and technology strategy, open R&D system, systematic time scheduling, management of R&D manpower, and developing and adapting PLM system were intensively required.

  • PDF

Drone Force Deployment Optimization Algorithm For Efficient Military Drone Operations (효율적 군용 드론 작전 운영을 위한 Drone Force Deployment Optimization 알고리즘)

  • Song, Ju-Young;Jang, Hyeon-Deok;Chung, Jong-Moon
    • Journal of Internet Computing and Services
    • /
    • v.21 no.1
    • /
    • pp.211-219
    • /
    • 2020
  • One of the major advancements of the Fourth Industrial Revolution is the use of Internet of Drones (IoD), which combines the Internet of Things (IoT) and drone technology. IoD technology is especially important for efficiently and economically operating C4ISR operations in actual battlefields supporting various combat situations. The purpose of this study is to solve the problems of limited battery capacity of drones and lack of budgeting criteria for military drone transcription, introduction, and operation. If the mission area is defined and corresponding multi-drone hovering check points and mission completion time limits are set, then an energy and time co-optimized scheduling and operation control scheme is needed. Because such a scheme does not exist, in this paper, a Drone Force Deployment Optimization (DFDO) scheme is proposed to help schedule multi-drone operation scheduling and networked based remote multi-drone control.

A Work Scheduling Based on Analysis of Performance Data (실적자료분석(實績資料分析)에 의(依)한 일정계획(日程計劃))

  • Kim, Dong-Chan;Kim, U-Sik
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.4 no.2
    • /
    • pp.59-66
    • /
    • 1978
  • This paper is a work scheduling for design of piping Department of chemical plant using accumulated curve. Accumulated curve prepared by analysis of performance data, collected executed manhours for chemical plant of "D" Company during the past two years. It compared scheduled manhours with actual used manhours up to six months, put into the form of figures and charts the results can he summarized as below; 1) It can he found an important factor of critical control thus piping department got 30% of total scheduled menhours. 2) A plan of manpower mobilization can be scheduled before work starting. 3) Project progress can he found easily as put into the form of figures and charts for schedule to actual.

  • PDF