• Title/Summary/Keyword: 4D System

Search Result 8,197, Processing Time 0.053 seconds

Improved Methodology of Construction Information Management in 4D CAD System (4D-CAD시스템의 공사정보관리 효율화방안)

  • Kang Leen Seok;Kim Chang Hak;Ji Sang Bok;Han Joo A
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.1132-1135
    • /
    • 2004
  • Recently. our construction industry is using 4D-CAD system but the public Database (DB) for the 4D-CAD system is insufficiently built. It is difficult to connect 4D-CAD system information such as schedule, drawings. Therefore this study suggest a methodology to link the 4D-CAD system information with work breakdown structure(WBS) and the methodology suggested in this study was applied to a 4D-CAD system

  • PDF

Simplified Methodology to Generate 2D/3D Object in 4D system for Civil Engineering Projects (토목시설물 4D구현을 위한 2D/3D 객체 생성 간편화 기법)

  • Lee Syeung-Youl;Lee Yong-Soo;Kim Chang-Hak;Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.585-588
    • /
    • 2003
  • This study attempts to develop a skeleton model to link construction schedule and 3D object for drawings in 4D system. Generally, the construction schedule and 3D object can be linked in 4D system by imported files which are made in specific S/Ws such as CAD S/W and scheduling S/W. Those methods have a difficulties for operating 4D data because extra work needs to link 4D data for each activity. This study develops a 4D model which the 4D data can be self-generated within the system. The suggested model can reduce the initial input data for new project by integrating schedule and 3D object in 4D system.

  • PDF

Development and Case Study of 4D CAD System for Visualizing Schedule Data of Construction Project (건설시설물 공정정보 시각화를 위한 4D CAD시스템의 개발 및 적용사례 분석)

  • Kang, Leen-Seok;Yun, Seon-Mi;Kwon, Jung-Hui;Mun, Jin-Seok
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.4
    • /
    • pp.373-380
    • /
    • 2007
  • Recently, various 4D CAD systems for visualizing construction schedule data are being developed. Specially, in case of railway project, the numerical information of progress data should be changed with visualized data by long construction section because the railway project consists of long length in construction site. This study suggests a case study of development of 4D CAD system for visualizing schedule information and the major functions of developed system are verified by railway project. The detailed application procedure of 4D CAD system including input data for a railway project is described in the study. The practical application of 4D CAD system can be improved in railway project by these demonstration researches.

NMR Chemical Shift for 4d$^n$ System (Ⅱ). Calculation of the Pseudo Contact Shift for a 4d$^1$ System in a Strong Crystal Field Environment of Octahedral Symmetry

  • Sang-woon Ahn;Se-Woong Oh;Eui-suh Park
    • Bulletin of the Korean Chemical Society
    • /
    • v.4 no.2
    • /
    • pp.64-67
    • /
    • 1983
  • NMR shift arising from the electron orbital angular momentum and the electron spin dipolar-nuclear spin angular momentum interactions has been investigated for a $4d^{1}$ system in a strong crystal field of octahedral symmetry. To examine the NMR shif for a $4d^{1}$ system in a strong crystal field of octahedral symmetry, we derive a general expression for ${\Delta}$B/B using a nonmultipole expansion technique. From this expression all the multipolar terms are determined. For the $4d^{1}$ system in a strong crystal field of octahedral symmetry the exact solution for NMR shift, ${\Delta}$B, is compared with the multipolar results. ${\Delta}$B/B for the $4d^{1}$ system is also compared with that for the $3d^{1}$ system. It is found that the $1/R^{7}$ term contributes dominantly to the NMR shift. However, there is good agreement between the nonmultipole and multipolar results for R-values larger than 0.2 nm for the $4d^{1}$ system but for R-values larger than 0.4 nm for the $3d^{1}$ system.

Fundamental Study of 4D CAD Application by Using Augmented Reality for Civil Engineering Project (증강현실(Augmented Reality)의 토목시설물 4D체계 활용을 위한 기초적 연구)

  • Kang, Leen-Seok;Moon, Hyoun-Seok;Kim, Hyun-Soo;Choi, Hyung-Lae;Kim, Chang-Hak
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.658-661
    • /
    • 2008
  • This study aims to suggest a methodology for developing the AR-4D CAD system which can improve construction progress control process by using augmented reality(AR) technology for civil engineering project. This study reviews practical application of AR process in 4D CAB system and suggests the detailed requirements, information flow system and integrated interface function for developing AR-4D CAD system. Through these methods, this research classifies main functions of AR-4D CAD system that can visualize construction progress control data, and suggests an operation scenarios of the system.

  • PDF

Introducing and Surveying 4D Models in AEC Industry (4D 공정관리시스템의 개발현황 조사연구)

  • Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.137-142
    • /
    • 2001
  • The traditional schedule management system provides project manager with analysis reports, such as progress control, earned value management and resource management, including schedule chart. However, the reports and functions in the traditional system are still limited in 2D concept. Recently, the scheduling method is using 4D concept that time of construction schedule is linked to space of drawings. This study presents the limitation of those systems and an improved method for developing 4D system through the comparative analysis of representative 4D systems that are developed up to date.

  • PDF

Application Technology of Multi-texturing for Effective Representation of Natural Ground on the 4D System for Civil Engineering Projects (토목공사용 4D 시스템의 효율적인 자연지형 표현을 위한 멀티텍스처링 기법 적용기술 개발)

  • Kang Leen-Seok;Kwak Joong-Min;Jee Sang-Bok;Kim Chang-Hak;Lee Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.349-352
    • /
    • 2004
  • 4D system has applied to construction project as a management tool after the late 1990's. Various 4D systems have been developed, however they have some problems that should be improved. Especially, the 4D system for civil engineering project needs synthesized 3D model between natural ground condition and physical facility type. It is a different problem comparing with the system for building project. 1'his study suggests an automatically synthesizing methodology between ground triangulate network and design triangulate network. Furthermore the study develops an application methodology of multi-texturing technique defined in virtual reality modeling language (VRML) for skipping the 3D model synthesizing process from the 4D model development processes. The suggested methodology is applied to the prototype of real 4D system. The proposed technique for 3D modeling may be used as an essential methodology for developing 4D system for civil engineering projects.

  • PDF

A Development of Unified and Consistent BIM Database for Integrated Use of BIM-based Quantities, Process, and Construction Costs in Civil Engineering

  • Lee, Jae-Hong;Lee, Sung-Woo;Kim, Tae-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.24 no.2
    • /
    • pp.127-137
    • /
    • 2019
  • In this study, we have developed a calculation system for BIM-based quantities, 4D process, and 5D construction costs, by integrating object shape attributes and the standard classification system which consist of Cost Breakdown System(CBS), Object Breakdown System(OBS) and Work Breakdown System(WBS) in order to use for the 4 dimensional process control of roads and rivers. First, a new BIM library database connected with the BIM library shape objects was built according to the CBS/OBS/WBS standard classification system of the civil engineering field, and a integrated database system of BIM-based quantities, process(4D), and construction costs(5D) for roads and rivers was constructed. Nextly, the process classification system and the cost classification system were automatically disassembled to the BIM objects consisting of the Revit-family style elements. Finally, we added functions for automatically generating four dimensional activities and generating a automatic cost statement according to the combination of WBS and CBS classification system The ultimate goal of this study was to extend the integrated quantities, process(4D), and construction costs(5D) system for new roads and rivers, enabling the integrated use of process(4D) and construction costs(5D) in the design and construction stage, based on the tasks described above.

Improved Link System of Schedule and 3D Object for VR-base Construction Project (가상건설기반의 건설공사 일정 및 3D객체 연동시스템의 개선된 구축방안)

  • Kwon, Jung-Hui;Moon, Hyoun-Seok;Park, Seo-Young;Gi, Sang-Bok;Kang, Leen-Seok
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.289-294
    • /
    • 2007
  • Virtual reality (VR) technology for construction project includes 3D CAD application and 4D CAD system for visualizing construction schedule data. 3D CAD application is more important in the design phase and 4D CAD system is effective tool in the construction phase. This study suggests a methodology to develop VR functions that can be used for project life cycle. The results of this study includes composition algorithms to make VR systems such as bird's eye view system, VR drawings system, VR telepresence system and VR risk management system. Those methodologies can be used for integrated VR system with nD CAD object.

  • PDF

Design and Implementation of Pneumatic Motion Base for 4D Home Theater

  • Kim, Dohyung;Cho, Seongyeon;Lee, Seokhun;Lee, Seunghyun;Kwon, Soonchul
    • International journal of advanced smart convergence
    • /
    • v.4 no.2
    • /
    • pp.131-137
    • /
    • 2015
  • Home Entertainment system is recently being offered by Home Theater & Smart TV with contents service. Also, console game is being played in the media like in TV. The usage of 4D as the main technology in entertainment industry has mostly been limited in Theme Park, Amuse Park, Theater, and contents for Movie and Animation. Some simulation systems for game has been developed but they were made mostly by using electric or hydraulic motion system which cause high power consumption and have a restriction of place for install. The paper is attempted to build Home Entertainment system which makes users feel realistic contents by developing 4D systems for Home Entertainment rather than before. 4D control S/W in which user can insert and edit 4D effects on contents of all areas such as game, movie, and broadcasting is developed. Also, built-in pneumatic cylinder in 4D system which can be easily controlled and managed in home is developed.