• 제목/요약/키워드: 3D construction

검색결과 2,806건 처리시간 0.03초

수송장비의 실시간 가상 시뮬레이션을 위한 3차원 데이터베이스의 체계적인 구축 프로세스 (A Systematic Construction Process of 3D Database for Realtime Virtual Simulation of Transportation Equipments)

  • 김보현
    • 산업공학
    • /
    • 제16권2호
    • /
    • pp.258-267
    • /
    • 2003
  • Recently, virtual reality technologies have been rapidly developed and realtime virtual simulation methods have been extensively employed for several application areas such as game, sports, manufacturing, military, and so on. A 3D database in realtime virtual simulation plays a key role because it makes users feel reality in virtual space. In a application view of 3D database, a systematic construction approach is required to reduce its construction time and increase its quality. However, many researches have been mostly focused on realtime graphic issues and its key technologies. In virtual simulation of transportation equipments, this paper proposes a systematic construction process of 3D database consisting of four stages as follows: 1) determine the activity space of a equipment, 2) collect data related to 3D database construction, 3) make a 3-dimensional modeling strategy, and 4) generate and evaluate a 3D model. This paper also introduces a new procedure of 3D environment modeling, which summarizes and expands our modeling experiences, to be used as a modeling guide.

ENHANCEMENT OF AVAILABILITY OF 4D SIMULATION BASED ON BUILDING INFORMATION MODEL TECHNOLOGY

  • Jong Jin Park;Eon Yong Kim;Hyun Cho;Han Jong Jun
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.579-586
    • /
    • 2009
  • 4D simulation integrates the 3 dimensional model of a building with the construction schedule, and it leads to the possibility of virtually checking the construction process and the building itself in advance. However, the existing problem of 4D simulation is the difference between the demands of architects, engineers, and construction site workers in 4D simulation. This study suggests the possible way to enhance the availability of 4D simulation, considering more the practical demands from the construction site. In order to conduct this study, we build a 3D BIM model of a business-residential complex and link the model with the pre-defined construction schedule in order to make a 4D simulation. This study concludes with the optimized 4D simulation methodology based on BIM model considering the demands in perspective of the construction site. It would contribute to the harmonic collaboration among architects, engineers, and labors in the construction site when using 4D simulation based on BIM model.

  • PDF

Multi-camera-based 3D Human Pose Estimation for Close-Proximity Human-robot Collaboration in Construction

  • Sarkar, Sajib;Jang, Youjin;Jeong, Inbae
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.328-335
    • /
    • 2022
  • With the advance of robot capabilities and functionalities, construction robots assisting construction workers have been increasingly deployed on construction sites to improve safety, efficiency and productivity. For close-proximity human-robot collaboration in construction sites, robots need to be aware of the context, especially construction worker's behavior, in real-time to avoid collision with workers. To recognize human behavior, most previous studies obtained 3D human poses using a single camera or an RGB-depth (RGB-D) camera. However, single-camera detection has limitations such as occlusions, detection failure, and sensor malfunction, and an RGB-D camera may suffer from interference from lighting conditions and surface material. To address these issues, this study proposes a novel method of 3D human pose estimation by extracting 2D location of each joint from multiple images captured at the same time from different viewpoints, fusing each joint's 2D locations, and estimating the 3D joint location. For higher accuracy, the probabilistic representation is used to extract the 2D location of the joints, considering each joint location extracted from images as a noisy partial observation. Then, this study estimates the 3D human pose by fusing the probabilistic 2D joint locations to maximize the likelihood. The proposed method was evaluated in both simulation and laboratory settings, and the results demonstrated the accuracy of estimation and the feasibility in practice. This study contributes to ensuring human safety in close-proximity human-robot collaboration by providing a novel method of 3D human pose estimation.

  • PDF

3D SCANNING을 활용한 비정형 외장재의 시공 공법 검토 (Construction Methods Review of Freeform Envelope Using 3D Scanning)

  • 김성진;박성진;최영재;류한국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.100-101
    • /
    • 2014
  • The generation of 3D models for freeform buildings is an important task while continuous monitoring of the related spatial information at different time phases. Realistic models of freeform building have to provide high geometric accuracy and detail at an effective data size.(Al-kheder, S. 2008) The efficiency of this image-based technique has been increased considerably by the development of digital technologies. Furthermore, 3D data collection based on laser scanning has become an high quality 3D models for construction site. Therefore, in this research, we have an effort to review construction methods to make freeform envelope of building using 3D scanning technology.

  • PDF

AR-based 3D Digital Map Visualization Support Technology for Field Application of Smart Construction Technology

  • Song, Jinwoo;Hong, Jungtaek;Kwon, Soonwook
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1255-1255
    • /
    • 2022
  • Recently, research on digital twins to generate digital information and manage construction in real-time using advanced technology is being conducted actively. However, in the construction industry, it is difficult to optimize and apply digital technology in real-time due to the nature of the construction industry in which information is constantly fluctuating. In addition, inaccurate information on the topography of construction projects is a major challenge for earthmoving processes. In order to ultimately improve the cost-effectiveness of construction projects, both construction quality and productivity should be addressed through efficient construction information management in large-scale earthworks projects. Therefore, in this study, a 3D digital map-based AR site management work support system for higher efficiency and accuracy of site management was proposed by using unmanned aerial vehicles (UAV) in wide earthworks construction sites to generate point cloud data, building a 3D digital map through acquisition and analysis of on-site sensor-based information, and performing the visualization with AR at the site By utilizing the 3D digital map-based AR site management work support system proposed in this study, information is able to be provided quickly to field managers to enable an intuitive understanding of field conditions and immediate work processing, thereby reducing field management sluggishness and limitations of traditional information exchange systems. It is expected to contribute to the improvement of productivity by overcoming factors that decrease productivity in the construction industry and the improvement of work efficiency at construction sites.

  • PDF

4D CAD와 GIS의 통합시스템을 통한 프로젝트 단계별 리스크관리 모델에 관한 연구 (A Study on 4D CAD and GIS Integrated System for Process Risk Management Model)

  • 전승호;윤석헌;백준홍
    • 한국건축시공학회지
    • /
    • 제7권3호
    • /
    • pp.91-98
    • /
    • 2007
  • Recently a construction industry introduces information that brings about many advantages in the early planning phase, design phase and construction phase. Especially it replaces 2D, 3D systems(usually using explanation of drawing information) ai 4D CAD(offering a sort of 4D-having relation of construction schedule and 3D drawing information). Nevertheless a 4D has these benefits, it has limits which are not only usually using 3D modeling but also limit of making full use of practical affairs because of a lack of connecting varietals of progress of work. To solve these uppermost limits, this research is presenting unified systems to use in risk management which are efficient management of space and non-space information, space analysis, making full use of data base, introducing GIS system of easy interaction.

사용자 요구 사항 분석에 따른 물량산출 연동 프로그램 개발 (A Development of 3D Computer-Aided Design(CAD) Add-on Program for a Quantity Take-off through the User Needs Analysis)

  • 김성아;이재준;신태홍;진상윤;김예상;최철호
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.297-300
    • /
    • 2008
  • 1990년대 3D CAD가 출현한 이후, 최근 BIM(Building Information Modeling)이 이슈화되고 있다. BIM이라 함은 건설 프로젝트 생애주기 전반에 걸쳐 생성되는 정보를 3D Model과 함께 관리하는 것으로, 건설 프로젝트 각 분야의 정보들을 3D 모델과 연동하는 프로세스를 가지고 있다. 이에 견적 분야에서도 3D 모델로부터 자재의 물량을 산출하는 연구들이 진행되어 오고 있으며, 국내l에서 상용화된 견적 프로그램을 국내 건설 프로젝트에 적용하려는 시도가 이루어지고 있다. 그러나 이는 2D 도면으로부터 물량을 산출하는 기존의 견적방식보다 작업시간 및 생산성 측면에서 효율성이 떨어질 뿐만 아니라, 국외 견적 업무는 국내 견적과 다른 방식으로 이루어지고 있기 때문에 국외 상용 프로그램을 국내 건설 프로젝트에 적용하는데 한계가 있다. 그러므로 국내 건설 프로젝트에서 3D 기반 견적 프로그램을 활용하지 못하고 있다. 본 연구에서는 국내 실정에 적합한 3D 기반 견적 프로그램 개발을 위해 우선적으로 고려되어야 할 3D CAD로부터 물량 정보를 견적 프로그램으로 전달하는 3D CAD와 물량산출 연동 프로그램을 제안하고자 한다.

  • PDF

FCP 제작용 3D 프린팅 콘크리트 노즐 개발을 위한 요구사항 분석연구 (Requirement Analysis Study for Development of 3D Printing Concrete Nozzle for FCP Manufacturing)

  • 윤종영;김지혜;김혜권;이동훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 봄 학술논문 발표대회
    • /
    • pp.65-66
    • /
    • 2022
  • In the construction industry, interest in technologies such as 3D Construction Printing (3DCP) is increasing, and research is being conducted continuously. In the case of atypical architecture, different shapes must be implemented, and the introduction of 3D printing technology is intended to solve it. Our researchers are conducting research to produce Free-form Concrete Panel (FCP). It automatically manufactures the FCP's formwork without any error with the design shape. At this time, the concrete nozzle based on the 3D printing technology is developed and the concrete is precisely extruded into the manufactured form to prevent the deformation of the formwork that can occur due to the concrete load. Therefore, in this study, the requirements for the development of 3D printing concrete nozzles for FCP manufacturing are analyzed. Based on the analyzed requirements, the first nozzle was developed. Such equipment is easy to shorten construction period and cost reduction in the atypical construction field, and is expected to be utilized as basic 3D printing equipment.

  • PDF

원전 3D 모델 사용성 강화를 위한 CAD 모델 경량화 방안 정립 (Establishment of Plan to lighten CAD Model for Strengthening Usability of Nuclear Power Plant 3D Model)

  • 김종명;김우중
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.248-249
    • /
    • 2019
  • In the nuclear industry, in order to keep pace with the 4th industrial revolution era, they are trying to improve the construction and maintenance ability by utilizing the technologies such as digital twin and VR/AR from the construction stage. However, the nuclear 3D CAD model, which is used as the base in the latest technology, is heavy due to a large number of facilities per unit space compared to other industrial companies, and it is difficult to directly incorporate the latest technology into the results of CAD programs for design purposes. In this study, in order to improve usability, we tried to lighten the 3D model. First, we analyze the existing nuclear power plant 3D model and draw out the problems and features. Secondly, we derived the factors to consider when we make the 3D CAD models lightweight.

  • PDF

다관절 로봇을 이용한 건설용 3D프린팅 출력시스템 개발 (Development of a 3D Printing System for Construction Using an Articulated Robot )

  • 이기륜;노현주;정남철
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 가을학술발표대회논문집
    • /
    • pp.263-264
    • /
    • 2023
  • 3D printing technology is recognized as a core technology that will lead the next generation, and is a field that can have a large ripple effect if it innovates the existing construction production method. Therefore, this study deals with the development of a 3d printing system using an articulated robot for construction purposes. In this system, ABB robot was used to control the developed cement gun accurately. The system is composed of mixer to mix cementitious materials, pump to transfer the materials, abb robot to motion control and cement gun to extrude the materials to print required construction parts. Using the system developed in this study, a suitable mix ratio of cementitious materials was found and successively printed a 1m high structure that demonstrated possibility of printing structures using 3d printer. In the future, we plan to build a foundation for automated construction through research on construction methods and materials that can be continuously layered for the system.

  • PDF