• Title/Summary/Keyword: 3D BIM

Search Result 401, Processing Time 0.022 seconds

Extracting Building Geomety from BIM for 3-D City Model (BIM으로부터 가상도시 구축용 건축물정보의 추출)

  • Goh, Il-Du;Choi, Joong-Hyun;Kim, E-Doo;Jeong, Yeon-Suk;Lee, Jae-Min
    • Spatial Information Research
    • /
    • v.16 no.2
    • /
    • pp.249-261
    • /
    • 2008
  • This study proposes a method for acquiring and managing basic information on building, which is continuously updated through construction and re-construction, in order to implement 3D-GIS based on geometric shape information and building information. First of all, distinctions between BIM and GIS information models are described, and then an overview of CityGML for virtual city and its Level of Detail are introduced. At last, a prototype for extracting building geometry from BIM data in accordance with CityGML is presented for demonstration. By using IFC data from BIM, this approach enables a lot of firms and contractors in building industry to utilize their 2D/3D, data on sites and buildings, and also to save many effects for generating exterior and interior building models which are inevitable for implementing National GIS.

  • PDF

3D modeling of Korean Traditional House based on BIM for Uploading to Spatial Information Open Platform (공간정보 오픈플랫폼 탑재를 위한 한옥의 BIM 기반 3차원 모델링 연구)

  • Kim, Kyeong-Min;Kim, Chan-Yong;Choi, Yun-Woong;Cho, Gi-Sung
    • Journal of Cadastre & Land InformatiX
    • /
    • v.44 no.2
    • /
    • pp.91-101
    • /
    • 2014
  • This study tried to create 3D object with LOD3 level for Korean traditional house which is atypical structure, upload to spatial information open platform and confirm the possibility for creating 3D-map. And this study tried to create 3D model for Korean traditional house based on BIM, performed 3D modeling for interior spatial information of Korean traditional house and confirm the development possibility of 3D modeling and visualization method of Korean traditional house. Also this study present the possibility of LOD4 level visualization for spatial information of Korean traditional house which is atypical structure, but 3D object with LOD4 level can't be uploaded to Spatial Information Open Platform currently, cause by data volume limitation of spatial information open platform.

A Study on Development of BIM-based Engineering Management System for Temporary Work (BIM기반 가설공사 업무지원시스템 개발에 관한 연구)

  • Choi, Changhoon;Han, Choonghee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.1
    • /
    • pp.61-69
    • /
    • 2020
  • As the amount of information generated in the construction project increases exponentially, design and construction review have a serious impact on the success of the site. For this reason, academic and business circles have been expanding the use of BIM at the whole life, and BIM is now accepted as one of the standards used in the construction industry. However, the BIM-based design for the temporary work is used as an aid to the 2D design because there is no specialized software and there is absolutely lack of a professional engineer. The objective of this research is to develop BIM-based temporary work support system. This system minimizes human errors in BIM-based design, quantity takeoff and inspection and shortens working hours.

BIM Based Virtual Simulations in CIP(Case in Place Pile) Method for Underground Space Excavation (3차원 정보모델을 활용한 지하공간 굴착 CIP 공법의 가상검토 -서울대학병원 지하 복합진료공간 임대형 민자사업 BIM 설계를 중심으로-)

  • Lee, Hyuk-Jin;Park, Kun-Young;Kim, Hyo-Jin;Lee, Sang-Ho
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.517-520
    • /
    • 2010
  • BIM 설계시 의무사항으로 포함되어 있는 원지형과 암층별 지층, 흙막이 공법 중 CIP(Cast in Place Pile)공법, 구조물 형상을 3차원 정보 모델로 생성하고, 모델을 통해 정확한 2D 도면의 생성, 각 공정간의 간섭검토, 암층별 토공량 및 흙막이의 수량을 산출하였다. 최종 설계안을 도출하기 위해 3차원 기법이 설계 초기에 도입되어 반복적인 노력과 시간을 최소화하여 많은 설계대안을 제시하도록 하였으며, 정확한 설계결과를 얻기 위해, 2D 설계와 3D 설계를 병행 수행함과 동시에 이 과정과 결과를 비교하여 3차원 모델의 효과를 검증하였다.

  • PDF

A Study on BIM based Process Risk Management Model (BIM 기반의 프로젝트 단계별 리스크관리 모델에 관한 연구)

  • Jeon, Seung-Ho;Choi, Myung-Seok;Lee, Joo-Ho
    • Journal of Korean Society of societal Security
    • /
    • v.3 no.1
    • /
    • pp.61-66
    • /
    • 2010
  • Recently a construction industry introduces information technology that brings about many advantages in the early planning phase, design phase and construction phase. Nevertheless a BIM has a many benefits, it has limits which are not only usually using 3D modeling but also limit of making full use of practical affairs because of a lack of connecting varietals of progress of work. To solve these uppermost limits, this research is presenting unified systems to use in risk management which are efficient management of space and non-space information, space analysis.

  • PDF

BIM-based visualization technology for blasting in Underground Space (지하공간 BIM 기반 발파진동 영향 시각화 기술)

  • Myoung Bae Seo;Soo Mi Choi;Seong Jong Oh;Seong Uk Kim;Jeong Hoon Shin
    • Smart Media Journal
    • /
    • v.12 no.11
    • /
    • pp.67-76
    • /
    • 2023
  • We propose a visualization method to respond to civil complaints through an analysis of the impact of blasting. In order to analyze the impact of blasting on tunnel excavation, we propose a simulation visualization method considering the mutual influence of the construction infrastructure by linking measurement data and 3D BIM model. First, the level of BIM modeling required for simulation was defined. In addition, vibration measurement data were collected for the GTX-A construction site, terrain and structure BIM were created, and a method for visualizing measurement data using blast vibration estimation was developed. Next, a spherical blasting influence source library was developed for visualization of the blasting influence source, and a specification table that could be linked with Revit Dynamo automation logic was constructed. Using this result, a method for easily visualizing the impact analysis of blasting vibration in 3D was proposed.

Analysis for the Applicability of Automated Quantity Take-off Technique Using BIM Authoring Tools on Road Construction (BIM 저작도구를 활용한 도로공사 수량산출 자동화 활용성 분석)

  • Moon, Jin-Seok;Sun, Ji-Won;Choi, Won-Sik
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.10
    • /
    • pp.5184-5191
    • /
    • 2013
  • The automated quantity take off technique using BIM authoring tools has been recently issued, and the studies of this method for the accuracy, efficiency, and the unit computing for the simple volume, area and number have been developed. Meanwhile the main concerns such as the details for the level of modelling, and the costs and time for the calculating BOQ item are still required to study. In this paper, the earth works, drainage works, pavement works, and facility works using BIM authoring tools are designed in 3D, and the applicability of automated quantity take off technique using BIM authoring tools is discussed, respectively. As a result, automated quantity take off are limited in the earth works, drainage works, pavement works, and facility works. But Most items of BOQ can be supported in Re-bar model.

A Development of Railway Infrastructure BIM Prototype Libraries for Roadbed and Track (노반, 궤도분야 철도인프라 BIM 원형 라이브러리 구축)

  • Park, Hyung-Jin;Seo, Myoung-Bae
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.30 no.5
    • /
    • pp.461-468
    • /
    • 2017
  • The introduction of BIM in domestic construction industry has become more active. Library development and standardization in civil-engineering are unexhausted. This research develop and standardize prototype library for railway infrastructure. We define target facility for library based on railway standard drawings and select BIM software according characteristic of each facility. In this research, we develop libraries composed of 199 files and 489 types for alignment, roadbed and track and make specifications as defined attribution item and description. As we consider for application to diverse use case, develop prototype library in low LoD. We expect that library can increase 3D design productivity and ensure consistency of quality.

Method of Deriving Activity Relationship and Location Information from BIM Model for Construction Schedule Management (공정관리 활용을 위한 BIM모델의 공정별 수순 및 위치정보 추출방안)

  • Yoon, Hyeongseok;Lee, Jaehee;Hwang, Jaeyeong;Kang, Hyojeong;Park, sangmi;Kang, Leenseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.2
    • /
    • pp.33-44
    • /
    • 2022
  • The simulation function by the 4D system is a representative BIM function in the construction stage. For the 4D simulation, schedule information for each activity must be created and then linked with the 3D model. Since the 3D model created in the design stage does not consider schedule information, there are practical difficulties in the process of creating schedule information for application to the construction stage and linking the 3D model. In this study, after extracting the schedule information of the construction stage using the HDBSCAN algorithm from the 3D model in the design stage, authors propose a methodology for automatically generating schedule information by identifying precedence and sequencing relationships by applying the topological alignment algorithm. Since the generated schedule information is created based on the 3D model, it can be used as information that is automatically linked by the common parameters between the schedule and the 3D model in the 4D system, and the practical utility of the 4D system can be increased. The proposed methodology was applied to the four bridge projects to confirm the schedule information generation, and applied to the 4D system to confirm the simplification of the link process between schedule and 3D model.

A Study on the Utilization of Documentation using BIM on Wooden Architectural Cultural Assets (BIM을 적용한 목조건축문화재 기록데이터 활용방안에 관한 연구)

  • Shin, Byeong-Uk
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.21 no.4
    • /
    • pp.25-36
    • /
    • 2019
  • The purpose of the study is to analyze how to document survey and repair data on wooden architecture culture assets. Documentation was analyzed in comparison to digital developments from the past to the present. Although the accuracy of survey equipment has been improved by digital development, survey drawing has not changed. For example, a 3D Scanner, survey equipment, was introduced but is being used for conversion into 2D data. Data provided by the drawing included in the survey and repair reports were not accumulated. As it stands, it is inaccessible and disorganized. Data generated from the survey, repair, and maintenance has to be consistent. A BIM system was proposed to integrate information on wooden architecture cultural assets.