• Title/Summary/Keyword: 3D프로세스

Search Result 362, Processing Time 0.029 seconds

A Study on Design Automation of Cooling Channels in Hot Form Press Die Based on CATIA CAD System (CATIA CAD 시스템 기반 핫폼금형의 냉각수로 설계 자동화에 관한 연구)

  • Kim, Gang-Yeon;Park, Si-Hwan;Kim, Sang-Kwon;Park, Doo-Seob
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.3
    • /
    • pp.147-154
    • /
    • 2018
  • This paper focuses on the development of a support system that can rapidly generate the design data of a hot-form die with cooling channels, commonly known as hot stamping technology. We propose a new process for designing hot-form dies based on our (automated) system, whose main features are derived from the analysis of the design requirements and design process in the current industry. Our design support system consists of two modules, which allow for the generation of a 3D geometry model and its 2D drawings. The module for 3D modeling automation is implemented as a type of CATIA template model based on CATIA V5 Knowledgeware. This module automatically creates a 3D model of a hot-form die, including the cooling channels, that depends on the shape of the forming surface and the number of STEELs (subsets of die product) and cooling channels. It also allows for both the editing of the positions and orientations of the cooling channels and testing for the purpose of satisfying the constraints on the distance between the forming surface and cooling channels. Another module for the auto-generation of the 2D drawings is being developed as a plug-in using CAA (CATIA SDK) and Visual C++. Our system was evaluated using the S/W test based on a user defined scenario. As a result, it was shown that it can generate a 3D model of a hot form die and its 2D drawings with hole tables about 29 times faster than the conventional manual method without any design errors.

A study on the Electronic Delivery Process and the Configuration Functional Modules of Railway Infrastructure BIM Digital Model (철도 인프라 BIM 디지털 모델의 전자납품 프로세스 및 기능 모듈 구성방안 연구)

  • Choi, Gwang-Yeol;Kim, Jin-Young;Choi, Hyung-Lae;Kim, Lee-Hyeon
    • Journal of KIBIM
    • /
    • v.11 no.3
    • /
    • pp.55-66
    • /
    • 2021
  • Recently, Building Information Modeling(BIM) has become a hot topic in the construction industry such as quantity calculation, interference check, process management, and construction cost management. It is also trying to convert the existing 2D design to 3D design and introduce the BIM in various fields, thus, many new deliverable are being presented but there are many issues due to the lack of standard guides on the preparation and delivery criteria for such new deliverable and how to utilize performance data. Therefore, In order to develop the electronic delivery process, we analyzed the process related to the delivery of BIM digital models presented in domestic and international BIM guidelines and the delivery of products from the Korea National Railway. The analysis focused on the list of achievements, delivery process, quality review standards, and the utilization code system of the Korea National Railway through BIM guidelines and the National Railroad Service's business procedures. Based on these analysis results, it presents a plan to construct an functional module of electronic delivery.

The Development of Automated Building Equipment Design Process System Using 3D CAD (3차원 CAD정보를 활용한 건축설비설계 프로세스 시스템 개발방향)

  • Lee, Dong-Hyun;Jung, Woo-Shin;Kim, Young-Don;Song, Kyoo-Dong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.269-274
    • /
    • 2008
  • It is attempted that the standardization of the construction, globalization of the engineering construction and an information oriented construction spread by setting a goal of the advanced construction industry and productivity increase of human resources within the country. Hence, it has been brought in the information oriented construction of BIM based technology for the field of construction and equipment of Korea. The current study that examines the possibility of application of 3D ; that is BIM based programs of building equipment, and make better the problems of 3D building equipment system through the Pilot Test, indicates the way of growth development about the construction of building equipment process system.

  • PDF

Development of Hardware Design Process Enhancement Tool for Flight Control Computer using Modeling and Simulation (M&S 기반의 비행조종컴퓨터 하드웨어 설계 프로세스 개선을 위한 툴 개발)

  • Kwon, Jong-Kwang;Ahn, Jong-Min;Ko, Joon-Soo;Seung, Dae-Beom;Kim, Whan-Woo
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.35 no.11
    • /
    • pp.1036-1042
    • /
    • 2007
  • It is rather difficult to improve flight control computer(FLCC) hardware(H/W) development schedule due to lack of commercial off-the-self(COTS) tools or target specific tools. Thus, it is suggested to develop an enhanced process utilizing modeling, simulation and virtual reality tools. This paper presents H/W design process enhancement tool(PET) for FLCC design requirements such as FLCC input/output(I/O) signal flow, I/O fault detection, failure management algorithm, circuit logic, PCB assembly configuration and installation utilizing simulation and visualization in virtual space. New tool will provide simulation capability of various FLCC design configuration including shop replaceable unit(SRU) level assembly/dis-assembly utilizing open flight format 3-D modeling data.

Construction 3D printing SoP Design and Verification Using Material Extrusion Additive Manufacturing Technology (압출식 적층제조 기술을 적용한 건축 3D 프린팅 운영절차의 설계 및 검증)

  • Park, Jinsu;Kim, kyung taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.1
    • /
    • pp.106-112
    • /
    • 2022
  • Additive manufacturing (AM, also known as 3D printing) technology gets attention for various effects in the construction industry. It reveals abilities of process automation, high traceability of resource management, construction period precision improvement, and worker safety. However, unlike the existing construction technology, the development of AM construction process causes trial errors and unpredictable accidents. In the present study, the construction AM process is designed for on-site construction, and it performs with empirical tests. Also, we analyzed the causes of qualitative experimental results.

Integrated design system for supporting product development process ($ezDesign^{(R)}$ System) (제품개발 프로세스를 지원하는 통합설계환경)

  • Lee, Sang-Bong;Kim, Su-Ok;Hong, Tae-Hwa
    • Proceedings of the KSME Conference
    • /
    • 2001.06c
    • /
    • pp.357-360
    • /
    • 2001
  • Design Engineering Group, LG Production engineering Research Center has been developing The Integrated Design Environment enabling engineering design task with ease, speedy and accurate for several years targeting the design departments in LG Electronics. $ezDesign^{(R)}$ System is consisted by Engineering Database Management, Engineering Knowledge Management, 3D Design Application, Design Evaluation Method and Project Management. Engineering Database Management manage the design information effectively. Engineering Knowledge Management takes control of design knowledge from design engineering activity systematically. It is possible for the engineering designer to utilized 3D CAD easily by 3D Design Application. Design Evaluation Method can evaluate several design alternatives synthetically. In Project management System, Designer can simulate the project schedule and cost. In this report, We will introduce how design process can be innovated by way of $ezDesign^{(R)}$ System.

  • PDF

A Study on Stereoscopical Motion Graphic Production using Tracking Data from 3D Camera (3D카메라 트레킹데이터를 활용한 입체적 모션그래픽 제작방법 연구)

  • Lee, Junsang;Han, Soowhan;Lee, Imgeun
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2015.07a
    • /
    • pp.232-233
    • /
    • 2015
  • 디지털 미디어의 발전으로 인해 모션그래픽의 구성요소들은 다양한 방식으로 제작되고 있다. 모션그래픽을 활용한 영상콘텐츠 제작기법은 새로운 이미지를 어떻게 제작하느냐에 따라 보다 창의적이고 효율적인 영상으로 표현되기도 한다. 모션그래픽의 활용도는 웹, 게임, 및 영화 방송 등 다양한 콘텐츠의 시각적 정보전달의 의미를 가지고 있다. 모션그래픽의 새롭고 실험적인 작업은 어떠한 제작방식에 따라 그 결과는 아주 다르게 나타난다. 또한 영상제작에 대한 프로세스는 새로운 뉴미디어의 기술의 결합으로 영상콘텐츠의 창의적인 작품으로 된다. 따라서 본 논문은 모션그래픽의 제작방식에서 실사카메라의 움직임을 가상카메라로 트래킹하여 입체적인 모션그래픽을 구현하는 제작방법을 제시한다.

  • PDF

Definition of requirements for creating BIM models for the development of SCAN to BIM guidelines (SCAN to BIM 지침 개발을 위한 BIM 기반 조달프로세스와 모델의 요구사항)

  • Kim, Do-Young
    • Journal of KIBIM
    • /
    • v.11 no.1
    • /
    • pp.11-20
    • /
    • 2021
  • In the domestic construction field, BIM and 3D scanning technology are combined to perform reverse engineering. It is necessary to develop guidelines or processes for domestic situations through 3D scenario investigation and reverse engineering projects using BIM. Using the case of actual construction service that performed reverse engineering, we analyze the areas that need to be reinforced compared to the existing advanced cases when creating guidelines. It is recommended to encourage the convergence between 3D scanning and BIM, and to define the requirements and levels of the BIM model in the procedure.

A Study on the Comparison of the Construction Process between the PC Modular Construction Method Using 3D Infill and the Existing Construction Method (3D Infill을 활용한 PC 모듈러공법과 기존공법과의 시공프로세스 비교 연구)

  • Chung, Joon-Soo;Lim, Seok-Ho;Yang, Hyeon-Jeong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.87-88
    • /
    • 2023
  • In accordance with changes in the domestic construction environment, interest in off-site construction methods (factory-manufactured construction methods) including modular construction methods is rapidly increasing. Among various off-site (OSC) construction methods, the front runner is the steel-based box-type modular construction method. Compared to the existing wet construction method, the steel modular construction method is increasing in terms of securing economic feasibility by shortening the construction period and increasing the prefabrication rate. However, due to the recent rise in raw materials and a sharp rise in the exchange rate, the economic feasibility of the wet method is deteriorating compared to the wet method. Therefore, a hybrid between 9-Matrix-based OSC construction methods is considered as a solution, away from the steel-box type combination, and a comparative study of the construction process between each construction method is being conducted. It was analyzed that the PC modular construction method shortened the construction period by 9% compared to the existing steel modular construction method. On the other hand, when comparing the construction period of the Gayang-dong demonstration complex calculated assuming that all modules are applied, it is estimated that there will be a 12% reduction in construction period compared to the steel modular method and a whopping 43% compared to the RC method.

  • PDF

A Study on Simulation Based Fault Injection Test Scenario and Safety Measure Time of Autonomous Vehicle Using STPA (STPA를 활용한 자율주행자동차의 시뮬레이션 기반 오류 주입 시나리오 및 안전조치 시간 연구)

  • Ahn, Dae-ryong;Shin, Seong-geun;Baek, Yun-soek;Lee, Hyuck-kee;Park, Ki-hong;Choi, In-seong
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.18 no.2
    • /
    • pp.129-143
    • /
    • 2019
  • As the importance of autonomous vehicle safety is emphasized, the application of ISO-26262, a development verification guideline for improving safety and reliability, and the safety verification of autonomous vehicles are becoming increasingly important, in particular, SAE standard level 3 or higher level autonomous vehicles detect and decision the surrounding environment instead of the human driver. Therefore, if there is and failure or malfunction in the autonomous driving function, safety may be seriously affected. So autonomous vehicles, it is essential to apply and verity the safety concept against failure and malfunctions. In this study, we study the fault injection scenarios for safety evaluation and verification of autonomous vehicles using ISO-26262 part3 process and STPA were studied and safety measures for safety concept design were studied through simulation bases fault injection test.