• Title/Summary/Keyword: 흙막이벽체

Search Result 140, Processing Time 0.021 seconds

Experimental study on the ground movement due to consecutive construction of retaining wall and underground space in cohesionless soil (사질토 지반에서 흙막이벽체-지하공간 연속 굴착에 따른 지반거동에 대한 실험적 연구)

  • Park, Jong-Deok;Yu, Jeong-Seon;Kim, Do-Youp;Lee, Seok-Won
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.3
    • /
    • pp.267-281
    • /
    • 2015
  • The ground movement and changes in earth pressure due to the consecutive construction of retaining wall and underground space were studied experimentally. A soil tank having 160 cm in length and 120 cm in height, was manufactured to simulate the vertical excavation like retaining wall by using 10 separated right side walls and underground space excavation like tunnel by using 5 separated bottom walls. The variation of earth pressure and surface settlement were measured according to the excavation stages. The results showed that the decrease of earth pressure due to the wall movement can cause the increase of earth pressure of the neighboring walls proving the arching effect. Experiments simulating continuous construction sequence also identified arching effect, however only 50% of earth pressure was restored on the 10th right side wall due to the movement of 1st bottom side wall unusually.

A Study on the Characteristics of Member Force, Horizontal Displacement and Concrete Strength by Design Elements of SPW Retaining Walls (SPW 흙막이 벽체의 설계요소별 부재력과 수평변위 및 콘크리트강도 특성 연구)

  • Wan-Ho Kim;Yu-Seok Shin;Yeong-Jin Lee;Yong-Chai Chang;Kang-Il Lee
    • Journal of the Korean Geosynthetics Society
    • /
    • v.22 no.1
    • /
    • pp.75-85
    • /
    • 2023
  • In areas where excavation works are carried out, it is very important to select a retaining wall method to minimize ground water level and ground subsidence changes. In this regard, the use of Secant Pile Wall(SPW) method, which can complement the disadvantages of the CIP method, is gradually domestic increasing for the construction of retaining wall method. This study investigated the design elements of the SPW method and the interrelationship between the structural stability factors of the wall. The design elements for the retaining method are the overlap length between piles, pile diameter, and the specifications of the H-Beam specifications, while the structural stability factors of the wall are the bending stress, shear stress, horizontal displacement, and concrete strength. The study results showed that the pile diameter and H-Beam specifications have a significant impact on the capacity of the H-Beam, the overlap length and pile diameter have a significant impact on the horizontal displacement, and the pile diameter and H-Beam specifications have a significant impact on the required strength of the concrete.

Study on Bending and Shear Strength Setting of Full-scale Model Additional Walls for Additional Wall Test Bed Combined with PHC-W Pile Retaining Wall (PHC-W말뚝 흙막이와 결합된 지하증설벽체 테스트베드 구축을 위한 실대형 지하증설벽체의 휨강도 및 전단강도 설정 연구)

  • Woo, Jong Youl;Yoo, Choong Geon;Kim, Sung Su;Choi, Yongkyu
    • Journal of the Korean Geotechnical Society
    • /
    • v.34 no.12
    • /
    • pp.7-17
    • /
    • 2018
  • Test bed additional wall combined with PHC-W pile retaining wall has been constructed. To determine the dimensions of test bed additional wall, bending and shear tests of full scale core members of additional wall were tested. Basement additional walls utilizing PHC-W pile retaining wall, which were developed by modifying the cross-section of PHC piles, were classified into the composite additional wall and the non-composite additional wall. Their tests were conducted to obtain bending strength and shear strength of basement additional walls ultilizing PHC-W pile retaining wall. Since bending strengths and shear strengths of the composite additional wall and the non-composite additional wall were similar, it could be confirmed that the non-composite additional wall could be applied instead of the composite additional wall. Full-scale model additional wall was 200 mm thick, thus the thickness of additional wall combined with PHC-W pile retaining wall could be reduced by 100~200 mm.

Behavior of the Ground under a Building due to Adjacent Ground Excavation (근접굴착시 건물 하부 지반의 거동)

  • Lee, Jong-Min
    • Journal of the Korean Geotechnical Society
    • /
    • v.34 no.4
    • /
    • pp.49-55
    • /
    • 2018
  • A pre-load of bracing was imposed to prevent the horizontal displacement on the strut of the braced wall adjacent to the building during the ground excavation. For this purpose, large scale model tests were conducted, without and with pre-load on braced wall. Adjacent building load was also imposed in different locations, that were 0 m, 1D, 2D on ground surface. In this study, model tests in 1:10 scale were performed in real construction sequences, and adjacent building was 12 m in width and the size of model test pit was 2 m in width, 6 m in height, and 4 m in length. As a result, it was found that the stability of the existing building adjacent to the braced wall within Rankine's active zone could be greatly enhanced when the horizontal displacement of the braced wall was reduced by applying a pre-load. which was larger than the designated axial force on the strut of the braced wall.

Behavior of Building Lower Part Passage Tunnel due to Adjacent Ground Excavation (근접굴착에 따른 건물 하부 통과 터널의 거동)

  • Lee, Jong-Min;Lee, Sang-Duk
    • Tunnel and Underground Space
    • /
    • v.20 no.5
    • /
    • pp.369-377
    • /
    • 2010
  • Applied to the braced wall in order to stabilize the adjacent tunnel. A pre-load of bracing was imposed to prevent the horizontal displacement of the braced wall during the ground excavation. For this purpose, real scale model tests were conducted, without and with pre-load on braced wall. Real scale model tests were conducted, without and with building load (0 m, 1D, 2D) on ground surface. As a result, it was found that the stability of the existing tunnel adjacent to the braced wall could be greatly enhanced when the horizontal displacement of the braced wall was reduced by applying a pre-load, which was larger than the designated axial force of bracing. In this paper, the behaviors of braced wall and adjacent tunnel was studied. Model tests in 1:10 scale were performed in real construction sequences. Adjacent tunnel was 12 m in diameter and the size of test pit was 2.0 m (width) ${\times}$ 6.0 m (height) ${\times}$ 4.0 m (length) in dimension.

A Trend of Back Ground Surface Settlement of Braced Wall Depending on the Joint Dips in Rocks under the Soil Strata (복합지반 굴착 시 암반층 절리경사 각도별 흙막이 벽체 배후 지표침하의 경향)

  • Bae, Sang-Su;Lee, Sang-Duk
    • Journal of the Korean Geotechnical Society
    • /
    • v.32 no.11
    • /
    • pp.83-96
    • /
    • 2016
  • The surface settlement of the back ground of a braced wall due to the ground excavation has the great influence on the safety of the surrounding area. But it is not easy to predict the settlement of the surrounding area due to proud excavation. Estimation of the settlement of the surface ground induced by the deformation of the braced wall is performed by FEM and empirical method (Peck, Clough etc). In this research, surface settlement of the back ground braced wall depending on the joint dips in rocks during excavating the composit ground was measured at the large scale model test (standard: $0.3m{\times}0.3m{\times}0.5m$). The scale of model test was 1/14.5 and the ground was excavated in ten steps. Earth pressure on the braced wall and ground surface settlement on the back ground of a braced wall were investigated. The surface settlement during the excavation depended on the joint dips in rocks on of the ratio of rock layer. Maximum earth pressure and maximum surface settlement were masured at the same excavation step. In accordance with the increase of the rock layer dips and rock layer ratio, the ground surface settlement increased. The maximum ground surface settlement was 17 times larger at 60 degree joint dips in rocks than that of the horizontal ground conditions. And the position of the maximum surface settlement by empirical method was calculated at the point, which was 17%~33% of excavation depth. In accordance with the increase of the rock layer dips and rock layer ratio, the ground maximum surface settlement increased. The ground surface settlement of composite ground is smaller than that of the empirical.

A Study on the Rational Application of 3D Numerical Analysis for Anchored Earth Retaining Wall (앵커지지 흙막이 벽체의 합리적인 3차원 수치해석기법 적용에 관한 연구)

  • Jeong, Sang-Seom;Sim, Jae-Uk;Lee, Sung-June
    • Journal of the Korean Geotechnical Society
    • /
    • v.32 no.4
    • /
    • pp.29-39
    • /
    • 2016
  • This paper presents the results of 2D and 3D finite element simulations conducted to analyze the effects of excavation depth (H), excavation width (L), and ground condition on the behavior of anchored earth retaining wall in inclined ground layers. The results of numerical analyses are compared with those of the site instrumentation analyses. Based on the results obtained, it appeared that 2D numerical analysis tends to overestimate the horizontal displacement of retaining wall compared to the 3D numerical analysis. When the excavation depth is deeper than 20m, it is found that 2D and 3D numerical analysis results of excavation work in soil ground condition are more different from the results in rock ground condition. For an accurate 3D numerical analysis, applying 3D mesh which has an excavation width twice longer than excavation depth is recommended. Consequently, 3D numerical analysis may be able to offer significantly better predictions of movement than 2D analysis.

An Experimental Study on Recharge Well Technology for Prevention of Ground Collapse (지반함몰 방지를 위한 지하수 재주입 실험적 연구)

  • Shin, Eunchul;Park, Chunsung
    • Journal of the Korean GEO-environmental Society
    • /
    • v.18 no.5
    • /
    • pp.35-43
    • /
    • 2017
  • It is a method of suppressing back ground subsidence by re-injecting groundwater back to the target ground and recovering the underground water level. In order to analyze the subsidence of the back ground due to maintaining the underground water level, indoor model experiments were conducted. Through this study, the factors influencing on the groundwater and the tendency of subsidence back ground by experiments were analyzed and the effect of ground subsidence by reinfusion of groundwater was also investigated. As a result of the subsidence analysis with considering only the influence of the underground water level, the settlement of the ground occurs as the underground water level at the time of ground excavation goes down. The closer to the back of the retaining wall, the maximum settlement occurred. Moreover, it was analyzed that the influence distance where subsidence occurs from retaining wall to the point of about 1.8 H on the basis of the ground collapse. The most effective location of water reinjection is the closet location to the back of braced-cut wall for reducing the groundwater down and also minimizing the ground settlement.

Permanent Basement Wall Convergence Method Using a PHC Pile (PHC 파일을 이용한 영구벽체 융합 공법)

  • Ryu, Soo-Hyun
    • Journal of the Korea Convergence Society
    • /
    • v.6 no.6
    • /
    • pp.163-169
    • /
    • 2015
  • This study was intended to suggest a new-concept construction method of permanent basement wall combined with earth retaining wall by using PHC piles to overcome the disadvantages of conventional CIP methods or the like which have been used just for earth retaining walls during field construction, and to determine its applicability. PHC piles are characterized by the reliable quality attributed to prefabrication (shop fabrication) as well as superior concrete strength and prestressing steel strength to that of CIP in the aspect of materials, and also higher bending moment than that of CIP in the aspect of structure.

Behavior of the tunnel under the influence of a existing building during the adjacent ground excavation (근접굴착 시 기존건물의 영향을 받는 터널의 거동)

  • Lee, Jong-Min
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.3
    • /
    • pp.609-623
    • /
    • 2018
  • If the ground is excavated in a depth which is deeper than the adjacent existing tunnel, the behavior of the braced wall is known to be greatly affected by the presence of the tunnel. By the way it is expected to be also affected by the structure on the ground surface, There are not many examples of studies which are conducted on this subject. As a result, largel scale model tests and analysis were conducted, to measure the behavior of the tunnel under the building whose location on the ground surface was varied during the adjacent ground excavation. For this purpose, the location of a building load was varied in 0 m, 1D, 2D on ground surface. In this paper, the behaviors of braced wall and adjacent tunnel was studied. Model tests in 1 : 10 scale were performed in real construction sequences. The size of test pit was $2.0m(width){\times}6.0m(height){\times}4.0m(length)$ in dimension. As a result, it was found that the stability of the existing tunnel under the influence of the building load on the ground surface adjacent to the braced wall.