Browse > Article
http://dx.doi.org/10.7843/kgs.2018.34.4.49

Behavior of the Ground under a Building due to Adjacent Ground Excavation  

Lee, Jong-Min (STeng)
Publication Information
Journal of the Korean Geotechnical Society / v.34, no.4, 2018 , pp. 49-55 More about this Journal
Abstract
A pre-load of bracing was imposed to prevent the horizontal displacement on the strut of the braced wall adjacent to the building during the ground excavation. For this purpose, large scale model tests were conducted, without and with pre-load on braced wall. Adjacent building load was also imposed in different locations, that were 0 m, 1D, 2D on ground surface. In this study, model tests in 1:10 scale were performed in real construction sequences, and adjacent building was 12 m in width and the size of model test pit was 2 m in width, 6 m in height, and 4 m in length. As a result, it was found that the stability of the existing building adjacent to the braced wall within Rankine's active zone could be greatly enhanced when the horizontal displacement of the braced wall was reduced by applying a pre-load. which was larger than the designated axial force on the strut of the braced wall.
Keywords
Braced wall; Pre-loading; Adjacent ground excavation; Large scale model test;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Duddeck, H. and Erdmann, J. (1985), "On Structural Design Models for Tunnels in Soft Soil", Underground Space, Vol.9, Pergamon Press, pp.246-259.
2 Kim, I. (2008), Behavior of Tunnel to Pre-loading on the Wall in due to Adjacent Ground Excavation Excavation, Ph.D., Ajou University.
3 LEE, S.D. (1998), "Soil Mechanics Second Edition", Book Salon, pp.353, 354, 388-396.
4 LEE, S.D. (1999), "Fundamental Engineering", Book Salon, pp. 252-254.
5 LEE, S.D. (2003), Understanding of the latest tunnel technology, Ajou University ground engineerin Laboratory, pp.1-22.
6 LEE, J.M. (2011), Behavior of the Tunnel below a Building depending on the Pre-loading on Braced Wall during the Adjacent Ground Excavation, Ph.D., Ajou University.
7 Mana, A.I. and Clough, G.H. (1981), "Prediction of Movement for Braced Cuts in Clay", J. Geotech. Engrg. Div., ASCE, Vol.107, No.6, pp.759-778.
8 Soliman E., Duddeck, H., and Ahrens, H. (1993), "Two- and Three-dimensional Analyis of Closely Spaced Double-tube Tunnels", Tunnelling and Underground Space Technology, Vol.8, No.1, pp. 13-18.   DOI
9 Satyanarayana, I. and Budi, G. (2015), "Evaluation of Induced Vertical Stress during Depillaring in Blasting Gallery Panel Workings", International Journal of Geo-Engineering, Volume 6, Paper no. 2, DOI 10.1186/s40703-014-0002-z   DOI