• Title/Summary/Keyword: 현장조립

Search Result 292, Processing Time 0.025 seconds

Productivity Analysis and Improvement of the System Form Construction in the Apartment Housing Project (공동주택 SYSTEM FORM 공사의 생산성 분석 및 향상방안 제안)

  • Kim Do-Hyeong;Kim Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.3 s.7
    • /
    • pp.101-109
    • /
    • 2001
  • Application of system form is very effective to continuous horizontal or vertical walls of the apartment housing. Though the system forms that are used in the construction field have the advantage of concrete quality improvement and increasing number of usages, there are some problems in reaching early planning scheduling goal due to schedule delay and low productivity. This study is initiated to solve the problem and suggest some improvements searching for reasons that diminish the productivity. A case study was done in apartment construction field where system form was used and the productivity is analyzed by work sampling. Finally, productivity improvements for assembly of the form, internal form and external form are suggested, respectively.

  • PDF

Study installing a manhole to on-site methods to assemble as use polymer concrete segment (폴리머 콘크리트 세 그먼트를 이용한 현장 조립식 맨홀 설치 연구)

  • Kim, Dong-Hun;Han, Jin-Woo
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2007.08a
    • /
    • pp.315-319
    • /
    • 2007
  • 지하에 설 치된 맨홀의 구조물이 노후되거나, 내부에 수 용된 시설물로 작업 공간이 협소하여 맨홀 구조물을 대개체 할 펼요가 있을 경우, 지금까지는 대부분 현장 콘크리트 타설에 의한 방법을 사용하였다. 이러한 방법은 거푸집 시공, 콘크리트 타설, 콘크리트 양생, 거푸집 철거 등의 공정이 소요되어 공사 기간이 장기화 되고, 도심지에 위치한 맨홀인 경우에는 차량과 보행자의 통행 불편을 초래하기도 하였다. 또한, 통상적으로 사용되고 있는 프리캐스트 맨홀에 비해 시공 품질이 낮아 향후 맨홀의 운용 및 유지관리에 많은 어려움을 겪는 원인이 되기도 하였다. 본 논문에서는 이러한 문제점들을 해결하기 위해, 폴리머 콘크리트를 이용하여 하부, 벽체, 상부로 구성된 다수의 세그먼트를 생산한 후, 현장에서 이들 세그먼트를 조립하여 맨홀을 설치하는 방법을 연구하였다. 가변형 거푸집을 이용한 세그먼트 제작과 조립식 블록에 의한 관구를 사용하여 현장 적용성을 높임은 물론, 프리캐스트로 생산되는 폴리머 콘크리트 맨홀 수준의 시공 품질을 확보할 수 있도록 하였다.

  • PDF

Optimum Balancing Using Ggenetic Algorithm (유전 알고리즘을 이용한 최적 평형잡이에 관한 연구)

  • 최원호;양보석;주호진;임동수;노철웅
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 1995.04a
    • /
    • pp.137-141
    • /
    • 1995
  • 회전기계에서 발생하는 진동 원인 중 약 60% 이상이 불평형(unbalance)에 의한 진동이다. 불평형은 기계의 과도한 진동을 유발시킬 뿐 아니라 베어링의 수명 단축 및 소음을 발생시킨다. 따라서, 기게의 수명을 연장시키고, 기계의 성능을 향상시키며 부드럽고 진동이 없는 운전을 위하여 평형잡이(balancing)는 절대적으로 중요하다. 불평형은 축 중심선에 대하여 회전체의 질량 분포가 비대칭이기 때문에 발생하는데 그 원인으로는 부품 자체가 비대칭에서 오는 설계 또는 제도 오차, 주물의 기포 및 용접의 불균일 등에 의한 재질상의 결함, 그리고 부품조립시 형상누적공차 등에 의한 가공.조립오차 등이 있다. ISO의 정의에 따르면 평형잡이는 회전체의 질량 분포를 조사하고 필요하다면 저널의 진동과 베어링의 작용력들이 운전속도에 대응하는 주파수에서 특정한 한계내에 있도록 보증하게 하기 위한 조정을 하는 과정이다. 불평형 상태에 대한 조사도 평형잡이로 표현된다. 그러나 수정이 필요하다고 간주된다면 수행된다. 모든 회전체는 초기 불평형(initial unbalance)이라 불리는 임의의 불평형을 가지고 출발한다. 완벽하게 평형이 잡힌 회전체를 달성하는 것이 평형잡이 작업의 목적은 아니다. 임의의 잔류 불평형(residual unbalance)은 항상 허용된다. 경제적인 이유에서 회전체는 일반적으로 요구되는 적절한 허용치보다 더 이상 평형잡이를 하지 않는다. 현장에서 현장 평형잡이를 수행하게 될 경우, 가끔 계산된 수정질량이 매우 클 경우가 있다. 이때 기게의 조건상 큰 수정질량을 부착하기가 곤란한 경우가 자주 발생한다. 작은 수정질량으로 평형잡이를 할 수 있다면 기계의 안정성 면에서 매우 유리하다. 따라서 본 연구에서는 영향계수법(Influence Coefficient Method : ICM)의 기본 개념과 유전 알고리즘(Genetic Algorithm : GA)을 이용하여 회전기계의 안정성을 보장할 수 있는 허용진동 내에서의 최적 수정질량 계산법을 제시한다.

  • PDF

Development of Pre-molded Joint for 400kV XLPE Power Cable (400kV XLPE 삽입형 고무몰드 접속함의 개발)

  • Kim, H.J.;Kim, H.J.;Kim, S.Y.;Song, J.H.;Kim, D.H.
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.1385-1386
    • /
    • 2007
  • 전통적으로 초고압 지중케이블 접속함으로 현장에서 절연을 형성하여 전기적 성능을 유지하는 TMJ(Tape Molded Joint), TJ(Taped Joint), EMJ(Extruded Molding Joint) 및 공장에서 절연물을 가공하여 현장에서 조립만으로 설치를 완료하게 되는 PJ(Prefabricated Joint), PMJ(Pre-Molded Joint) 등이 사용되어 왔다. 최근에 PMJ에 사용되는 재료의 발전과 PMJ의 조립시간 단축, 원가 절감 및 공장 출하시 검사에 의한 신뢰성 향상으로 지중케이블 접속함 시장에서 PMJ의 비중이 점차 확대 되어가고 있다. 이에 당사는 이미 230kV급 PMJ의 개발을 완료하였으며, 이러한 기술적 배경을 바탕으로 현재 PMJ로서는 세계에서 최고 전압급에 속하는 400kV급 PMJ의 개발을 완료하게되었다.

  • PDF

Research on non-welding door frame assembly method that allows on-site assembly (현장조립이 가능한 무용접 도어프레임 조립방식에 대한 연구)

  • Lee, Joo-Won;Lim, Bo-Hyeok;Lee, Gwang-Woo;Lee, Hae-Yeol
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.155-156
    • /
    • 2023
  • In the case of steel door frames commonly found in general buildings, there are various assembly methods such as rivets, bolts, and welding, but the welding method is generally used. However, this welding joint method has many problems, such as distortion due to heat and damage due to external shock. In particular, when used as a fire door, problems may occur in the event of a fire due to distortion caused by heat from welding and the weak welded joint area. In the case of rivet or welded joints, when moved after assembly, joint loosening due to external shock may occur. Problems may arise where the bonding strength becomes weak. In addition, with the recent increase in high-rise buildings and larger buildings, when assembly is completed and brought to the site, a place is needed to store it, and in addition, there is a problem in that it has to be transported several times in small quantities to the installation site, which is another problem of time and cost loss. This is coming to the fore. In order to fundamentally solve this problem, we have researched and developed a non-welding door frame that can be assembled on site. We have researched and developed three assembly methods: screw-type, insert-type, and protrusion-type. Non-welded door frames are small in size and easy to package, making them advantageous for domestic and overseas exports.

  • PDF

Case of assembly process review and improvement for mega-diameter slurry shield TBM through the launching area (발진부지를 이용한 초대구경 이수식 쉴드TBM 조립공정 검토 및 개선 사례)

  • Park, Jinsoo;Jun, Samsu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.637-658
    • /
    • 2022
  • TBM tunnel is simple with the iterative process of excavating the ground, building a segment ring-build, and backfilling. Drill & Blast, a conventional tunnel construction method, is more complicated than the TBM tunnel and has some restrictions because it repeats the inspection, drilling, charging, blasting, ventilation, muck treatment, and installation of support materials. However, the preparation work for excavation requires time and cost based on a very detailed plan compared to Drill & Blasting, which reinforces the ground and forms a tunnel after the formation of tunnel portal. This is because the TBM equipment for excavating the target ground determines the success or failure of the construction. If the TBM, an expensive order-made equipment, is incorrectly configured at the assembly stage, it becomes difficult to excavate from the initial stage as well as the main excavation stage. When the assembled shield TBM equipment is dismantled again, and a situation of re-assembly occurs, it is difficult throughout the construction period due to economic loss as well as time. Therefore, in this study, the layout and plan of the site and the assembly process for each major part of the TBM equipment were reviewed for the assembly of slurry shield TBM to construct the largest diameter road tunnel in domestic passing through the Han River and minimized interference with other processes and the efficiency of cutter head assembly and transport were analyzed and improved to suit the site conditions.

Experimental Consideration for Stability Improvement of Steel Pole (통신용 강관전주의 안정성 개선을 위한 실험적 고찰)

  • Han, Jin-Woo;Jeong, Seong-Taek
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2007.08a
    • /
    • pp.302-305
    • /
    • 2007
  • 현재 통신용 강관전주는 상, 하로 2 분할된 강관을 조립하여 대부분 사용하고 있다. 콘크리트전주에 비해 가볍고, 길이가 짧기 때문에 도심지 등 협소한 지역에서도 시공이 가능하며 특히 소규모 인력으로 시공이 가능하다. 하지만 전주의 단면이 작아 별도의 기초 보강을 하지 않고서는 지반의 지지력이 부족하여 전주가 기울어지거나 전도되는 현상이 빈번히 발생하고 있으며, 또한 운반을 용이하게 하기 위하여 2 분할한 강관의 조립 부분에서의 꺽임 현상이 발생하여 도시 미관을 해치고 있는 실정이다. 통신전주의 안정성을 확보하기 위해서는 전주 자체가 보유한 강도를 발휘할 수 있도록 충분한 지반지지력이 확보되어 있어야 한다. 강관전주의 휨강도 실험 및 현장 지반지지력 실험을 통해 충분한 지반지지력을 확보할 수 있는 공법을 도출해 내고, 현재 강관전주의 지반지지력 보강을 위해 사용하는 콘크리트블록 설치 방식이 아닌 시공 편리성 및 안정성을 개선한 기초콘크리트 방식을 제시하고자 한다.

  • PDF

STEPS : shipbuilding tact epert planning system (선각 조립공정 스케쥴링 전문가 시스템)

  • 최영순;김남훈;이창호
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1994.04a
    • /
    • pp.668-677
    • /
    • 1994
  • STEPS는 삼성 조선의 블록 조립생산공정의 라인스케쥴링을 수행하는 시스템이다. 삼성중공업 조선 해양 사업본부는 그간 생산성 향상을 통한 대외 경쟁력 제고와 선진 조선의 입지를 확고히 하고자 부단한 노력을 기울여 왔다. 이러한 노력은 생산 설비 확충과 자동화 등 하드웨어 차원에서 많은 발전을 이루었고, 이제는 설계, 계획, 관리등 소프트웨어 차원의 발전으로 전환하고 있다. 15여년 간의 경험과 노하우를 체계적으로 정립하여 현실적이면서 합리적인 소프트웨어를 구축하는 것은 삼성조선의 새로운 도전이 되고 있다. 이에 현장 데이타의 축적과 효과적인 관리 피드백으로 선각, 도장, 의장등 전 공정을 합리적으로 계획, 관리코자 생산공정 관리 시스템의 구축을 추지하고 있다. 이러한 생산공정 관리 시스템의 일환으로 대.중조블럭 일정계획의 자동화한 것이 STEPS(Shipbuilding Tact Expert Planning System) 프로젝트이다. STEPS는 전문가시스템(Expert System)으로서 전문가의 지식(Knowledge)을 시스템화하는 인공지능 (Artificial Intelligence)기법을 적용하고 있다.

Development of Computer Program for Bridge Pier Scour Considering Accumulative Effect (축적 효과를 고려한 교각세굴 해석 프로그램 개발)

  • ;Briaud, Jean-Louis
    • Journal of the Korean Geotechnical Society
    • /
    • v.17 no.3
    • /
    • pp.5-13
    • /
    • 2001
  • 세립토에서의 세굴깊이의 발달은 일반적으로 조립토에서보다는 아주 천천히 진행된다. 조립토를 위해 개발된 방법을 시간효과와 무관하게 세립토에 적용한다면 세굴깊이가 과대하게 평가된다. SRICOS 방법은 점성토 또는 연암에 설치된 교각의 국부세굴깊이의 변화를 예측하기 위해 개발되었으며, 교량현장에서 채취한 흙에 대한 실험과 SRICOS 프로그램의 수행을 병행함으로써 적용된다. 본 논문에서는 SRICOS 방법을 간단히 설명한 후 프로그램의 세부적인 내용을 기술한다. 또한 이 프로그램을 이용하여 세굴에 미치는 각 매개변수의 영향을 평가하기 위해 실시한 매개변수 해석의 결과가 포함된다.

  • PDF

Suggestion of the Specific Infiltration Equation for Infiltration Trench Installed in a Granular Ground (조립토 지반에 설치된 침투트렌치의 비침투량 산정식 제안)

  • Nam, Jung-Man;Yun, Jung-Mann;Kim, Do-Hyeong
    • Journal of the Korean Geosynthetics Society
    • /
    • v.7 no.4
    • /
    • pp.47-55
    • /
    • 2008
  • The model test and field test for an infiltration trench were carried out to estimate the infiltration quantity in a granular ground with high permeability like Jeju's ground. The specific infiltration equation was suggested on the basis of the model test result. It shows that the infiltration quantity by the proposed equation is larger than about two times of that by the existed equation. Meanwhile, the infiltration quantity from field test is similar to that from the proposed equation as the result of comparison between infiltration quantity of the filed test and that of the proposed equation and the existed equation. Therefore, it may be right that the proposed equation is applied to estimate the infiltration quantity of the infiltration trench in a granular ground with high permeability.

  • PDF