• Title/Summary/Keyword: 해체공사

Search Result 151, Processing Time 0.021 seconds

Demolition Cost Estimation of Small-size Rental Housing based on the Quantity per Unit Method (원가계산방식에 의한 다가구임대주택 해체공사비 예측)

  • Park, Seong-Sik;Lee, Sung-Bok;Shin, Sang-Hoon
    • Land and Housing Review
    • /
    • v.2 no.4
    • /
    • pp.415-427
    • /
    • 2011
  • This study is aiming at estimating the demolition cost of deterioration housing by the rational method in order to provide for the demolition and new build project of the rental multi-family housing of LH. We investigated the actual state of demolition construction and work process of small size housing, and analysed an actual condition of estimation for the demolition cost through an advice by the expert of construction cost estimate. Furthermore, the 'estimation standard for the predetermined amount', 'estimation standard for the disposal cost of construction wastes' and precedent studies in public construction work were considered. As one of results in this study, cost accounting system, breakdown system and construction cost for the demolition work based on the standard of estimate were proposed and the predetermined amount of demolition construction for the multi-family housing with 2 or 3 floors could be produced by them. Eventually, It is estimated that the demolition cost per a multi-family housing is about 18,331,000(won) and 104,000(won) per floorage($m^2$). To the details, the result indicated that the direct demolition cost needs about 14,339,000(won) per a multi-family housing and the consignment disposal cost of wastes needs 3,992,000(won) per one. The results of the study will be used as the fundamental data to estimate the project cost in the phase of budget establishment for demolition and new build project of the deteriorated rental multi-family housings, and also cost accounting system of demolition construction and breakdown system are expect to be used effectively at the ordering of public construction work.

An Investigation on the Propriety of Ratio-Unit Price Method for Estimating Demolition Cost (해체 공사 원가분석을 통한 비율단가 적용방식의 적정성 검토)

  • Sung Nak-won;Kim Young-suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.579-583
    • /
    • 2004
  • A new and extendable highway should be planned and budgeted by estimating the total construction cost on the basis of the precise cost data. However, the demolition or disjointing cost could not reflect construction site condition sufficiently because it was simply estimated by multiplying the highway structure installation cost by the regular ratio($10\~70\%$) specified in the Korea Standard Estimate. The regular ratio for estimating of demolition and disjointing cost was calculated by not actual construction cost data but subjective experiences of field manager. Therefore, the reliance of the estimated demolition or disjointing cost has been declined. The primary objective of this study is to purpose the standard for estimating proper demolition or disjointing cost of relevant items through various site analysis and survey, and to investigate on the propriety of ratio-unit price method for estimating demolition and disjointing cost.

  • PDF

Case Study of Explosive Demolition of Airport Structure (김해국제공항 구 국제선 청사 발파해체 시공 사례)

  • 이윤재;송영석;정민수;권오성;강대우
    • Explosives and Blasting
    • /
    • v.21 no.3
    • /
    • pp.37-48
    • /
    • 2003
  • 김해 국제공항 2단계 확장 공사 중 구 국제선 청사 발파해체공사"는 5.5초의 기폭시차를 두고 약 7초간에 구조물의 붕괴를 유도하여, 단기간에 안전하며 최대의 효율을 낼 수 있는 발파해체공법을 적용하여 시공하였다. 이에 따라 발파해체공사의 공법, 공정, 세부 현황 및 결과, 발파공해영향권에 대해 분석, 평가 하였다. 구 국제선청사 구조물은 3층 높이로 저층 구조물에 해당하고 구조물의 특성상 Span 간격이 길고 충고가 높다. 또한 지반이 액상한계점 상태까지 도달하여 구조안전진단 결과 위험등급인 D등급으로 판정되었다. 본 대상건물과 같이 충고는 낮지만, 구조 안전성 측면에서 위험 요소를 가지고 있으므로 발파공법을 적용하여 해체를 실시하였다.

Evaluation of Environmental Economics on Dismantling Projects Using LCI DB (LCI DB를 활용한 해체공사 환경경제성 평가)

  • Kwon, Suk-Hyun;Kim, Kyong-Ju;Kim, Byung-Soo;Kim, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.233-238
    • /
    • 2008
  • Korea has a high volume of exhaust in environmental pollutants compared to her economic size, which results from the increase of the ratio in high energy consuming industries. There arises an issue that efficient energy saving is not achieved in the related projects of the construction, which is one of the high energy consuming industries. In addition, such projects of dismantling old and decrepit buildings are frequent in recent years. Given the situation, to obtain much better effects of energy saving, it is necessary to build basic databases and develop utilization plans on energy consumption volume, exhaust volume of pollutants, and environmental expenses that come from the dismantlement stages out of the life cycle of construction projects. Therefore, this study calculates the exhaust volume of environmental pollutants, converts it into environmental expenses by pollutants, and evaluates the environmental economics on the projects of dismantling buildings, utilizing LCI DB that is suggested by Ministry of Knowledge Economy and Ministry of Environment. For this purpose, related data research, the existing literature study, and on-the-spot field investigation were conducted. Based on the results of analysis on the collected data, the environmental economics of the target building was evaluated.

  • PDF

Economic Feasibility Assessment for the Interior Materials Selective Dismantling System Promotion in Buildings (건축물 분별해체 제도 활성화를 위한 경제적 효용성 평가)

  • Ji-Sun Park;Kyung-Pil Jang;Tae-Hyeob Song
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.11 no.3
    • /
    • pp.251-259
    • /
    • 2023
  • In this study, as a foundational research aimed at promoting the efficient recycling and environmentally friendly disposal of construction waste through the activation of a selective dismantling system, our primary objective was to analyze the economic feasibility of implementing selective dismantling. To achieve this, we conducted an assessment on a 5-story residential building with a construction area of 2,400 m2 as a case study. When considering the additional cost of dismantling construction ① the reduction in waste disposal costs due to decreased mixed waste, ② and the potential revenue from recycling through the separation and sorting of waste materials, and ③ we were able to comprehensively confirm that there is an expected cost-saving effect totaling 34,727,000 KRW when compared to conventional demolition methods.

Explosive Demolition of Structures (구조물의 폭파해체공법 소개)

  • 황현주;이성우;김상수;이광원
    • Computational Structural Engineering
    • /
    • v.5 no.1
    • /
    • pp.38-44
    • /
    • 1992
  • 본 기사에서는 재래식 해체공법에 비해 보다 안전하고 신속하며, 경제적인 폭파해체공법을 간략하게 소개하였다. 폭파해체공법은 구조역학적인 기술과 화약기술을 종합한 매우 정교한 제어해체 기술로써 앞으로 발생되는 해체, 철거공사에 많이 이용될 것으로 예상된다.

  • PDF

Cost Prediction Model for Building Demolition Work by Using Regression Analysis (회귀분석을 이용한 건축물 해체공사비 예측모델)

  • Kim, Taehoon;Kim, Young Hyun;Cho, Kyuman
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.2
    • /
    • pp.105-112
    • /
    • 2021
  • While the scale of the domestic market for demolition work is steadily increasing, research on cost prediction for demolition work is insufficient. Thus, this study proposes a cost prediction model for demolition work that reflects various attributes influecing the fluctuation of demolition cost. 13 influencing factors and historical cost data were collected based on literature review and experts' advice, and two prediction models were constructed through regression analysis and the prediction accuracy was evaluated. As a result, it showed an average error rate of about 6 to 12%, and it was possible to explore the possibility of use as a reliable prediction model. The results of this study can contribute to estimating appropriate construction cost and improving related standards for domestic demolition works in the future.

Analysis of the Factors Influencing the Demolition Costs (건축물 해체공사비 변동 영향요인 분석)

  • Shin, Dong-Wook;Cho, Kyu-Man;Lee, Ung-Kyun;Kim, Tae-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.5
    • /
    • pp.499-506
    • /
    • 2018
  • The number of demolition work is rapidly increasing because the middle- and high-rised buildings constructed over the rapid industrialization and urbanization have been deteriorated in social and structural aspects. However, theoretical approaches or studies related to the demolition cost prediction are still insufficient. Thus, this study derived and analyzed important factors affecting the fluctuation of the building demolition costs. 14 factors was derived through literature reviews and experts' interview, and the importance of each factor was analyzed to the each work(temporary work, structure demolition, and waste disposal) and the entire demolition work by using descriptive analysis. The survey results showed that the demolition costs was greatly influenced by environmental properties of the site. The results of this study can be used as a basis for estimating the approximate cost of the demolition work.