Cost Prediction Model for Building Demolition Work by Using Regression Analysis (회귀분석을 이용한 건축물 해체공사비 예측모델)

  • Kim, Taehoon;Kim, Young Hyun;Cho, Kyuman
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.2
    • /
    • pp.105-112
    • /
    • 2021
  • While the scale of the domestic market for demolition work is steadily increasing, research on cost prediction for demolition work is insufficient. Thus, this study proposes a cost prediction model for demolition work that reflects various attributes influecing the fluctuation of demolition cost. 13 influencing factors and historical cost data were collected based on literature review and experts' advice, and two prediction models were constructed through regression analysis and the prediction accuracy was evaluated. As a result, it showed an average error rate of about 6 to 12%, and it was possible to explore the possibility of use as a reliable prediction model. The results of this study can contribute to estimating appropriate construction cost and improving related standards for domestic demolition works in the future.

Analysis of the Factors Influencing the Demolition Costs (건축물 해체공사비 변동 영향요인 분석)

  • Shin, Dong-Wook;Cho, Kyu-Man;Lee, Ung-Kyun;Kim, Tae-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.5
    • /
    • pp.499-506
    • /
    • 2018
  • The number of demolition work is rapidly increasing because the middle- and high-rised buildings constructed over the rapid industrialization and urbanization have been deteriorated in social and structural aspects. However, theoretical approaches or studies related to the demolition cost prediction are still insufficient. Thus, this study derived and analyzed important factors affecting the fluctuation of the building demolition costs. 14 factors was derived through literature reviews and experts' interview, and the importance of each factor was analyzed to the each work(temporary work, structure demolition, and waste disposal) and the entire demolition work by using descriptive analysis. The survey results showed that the demolition costs was greatly influenced by environmental properties of the site. The results of this study can be used as a basis for estimating the approximate cost of the demolition work.

Demolition Cost Estimation of Small-size Rental Housing based on the Quantity per Unit Method (원가계산방식에 의한 다가구임대주택 해체공사비 예측)

  • Park, Seong-Sik;Lee, Sung-Bok;Shin, Sang-Hoon
    • Land and Housing Review
    • /
    • v.2 no.4
    • /
    • pp.415-427
    • /
    • 2011
  • This study is aiming at estimating the demolition cost of deterioration housing by the rational method in order to provide for the demolition and new build project of the rental multi-family housing of LH. We investigated the actual state of demolition construction and work process of small size housing, and analysed an actual condition of estimation for the demolition cost through an advice by the expert of construction cost estimate. Furthermore, the 'estimation standard for the predetermined amount', 'estimation standard for the disposal cost of construction wastes' and precedent studies in public construction work were considered. As one of results in this study, cost accounting system, breakdown system and construction cost for the demolition work based on the standard of estimate were proposed and the predetermined amount of demolition construction for the multi-family housing with 2 or 3 floors could be produced by them. Eventually, It is estimated that the demolition cost per a multi-family housing is about 18,331,000(won) and 104,000(won) per floorage($m^2$). To the details, the result indicated that the direct demolition cost needs about 14,339,000(won) per a multi-family housing and the consignment disposal cost of wastes needs 3,992,000(won) per one. The results of the study will be used as the fundamental data to estimate the project cost in the phase of budget establishment for demolition and new build project of the deteriorated rental multi-family housings, and also cost accounting system of demolition construction and breakdown system are expect to be used effectively at the ordering of public construction work.

Development of a Computer System and Suggestion of Man-Hours for Demolition Cost Estimation (해체공사비 산정을 위한 품산정 기준과 전산시스템의 개발)

  • Kim, Hyo Jin;Kang, Leen Seok;Lee, Dong Wook;Kim, Chang Hak
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.3
    • /
    • pp.1007-1015
    • /
    • 2014
  • The importance of construction waste reusing and recycling is becoming increasingly large because the demolition industry is in current trend to pursue for sustainable growth. As the considering situation of the domestic housing construction and existing house, a scale of demolition industry is expected to be increased continuously. But the related cost regulations that are used in tendering in the demolition industry are insufficient, also the computer system for estimating the demolition costs have not been developed yet. Therefore, in this study suggests man-hours of 21EA items which are utilized to estimate demolition cost and work rate of $1.0m^3$ breaker which is used mostly in domestic demolition industry after analyzing a case study for deconstruction works. The computer system is developed for the estimating demolition cost easily, which are including five modules such as a project information, a unit cost management, a standard unit cost table, a bill of quantity, and a reporting system. This computer system is possible to apply for estimating cost of both mechanical demolition and blasting demolition. The biggest advantage of this system is to estimate cost to utilize standard WBS which is linked with standard unit table and each DB. This can help unskilled users use easily for it.

An Investigation on the Propriety of Ratio-Unit Price Method for Estimating Demolition Cost (해체 공사 원가분석을 통한 비율단가 적용방식의 적정성 검토)

  • Sung Nak-won;Kim Young-suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.579-583
    • /
    • 2004
  • A new and extendable highway should be planned and budgeted by estimating the total construction cost on the basis of the precise cost data. However, the demolition or disjointing cost could not reflect construction site condition sufficiently because it was simply estimated by multiplying the highway structure installation cost by the regular ratio($10\~70\%$) specified in the Korea Standard Estimate. The regular ratio for estimating of demolition and disjointing cost was calculated by not actual construction cost data but subjective experiences of field manager. Therefore, the reliance of the estimated demolition or disjointing cost has been declined. The primary objective of this study is to purpose the standard for estimating proper demolition or disjointing cost of relevant items through various site analysis and survey, and to investigate on the propriety of ratio-unit price method for estimating demolition and disjointing cost.

  • PDF

A Prospect of Explosives Demolition Based on Comparative Analysis of Demolition Cost. (해체공사비 비교분석을 통한 발파해체 공법의 전망)

  • Cho Tae-Wan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.4 s.20
    • /
    • pp.130-138
    • /
    • 2004
  • The demolition works of high building in korea are expecting to increase rapidly in the near future, and its general demolition methods can be divided into mechanical demolition method and explosive demolition method. The selection of the right demolition method relies on many variable elements according to environmental and geographical elements. But, generally, the most important element of those is a economical profit. Accordingly, This study estimates each demolition cost dividing into mechanical demolition method and explosive demolition method of high building in city. And the estimating of the demolition cost makes it possible to do comparative analysis for the economical efficiency of each method more objectively than any other selective elements. Also, the analysis for the economical efficiency helps to forecast the activated time of the explosive demolition method in domestic.

Basic Research for Introduction Plan of Building Dismantlement (건축물 분별해체 제도 도입을 위한 기초연구)

  • Park, Ji-Sun;Song, Tae-Hyeob
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.7 no.4
    • /
    • pp.113-120
    • /
    • 2012
  • This study was conducted basic research for introduction plan of building dismantlement to reduce construction waste fundamentally and efficiently. The current domestic and overseas legislations relation with dismantlement were compared. In addition, the difference of construction waste treatment and pure demolition cost that were applied to dismantlement and general deconstruction method in building were compared. The total cost that was estimated to apply dismantlement in building was higher about 6% than that of general deconstruction.

  • PDF

거푸집공사의 재해 위험성 평가에 관한 연구

  • 오준호;고성석
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 2002.05a
    • /
    • pp.109-114
    • /
    • 2002
  • 건설공사의 공종 중 거푸집공사는 전체공사기간의 대략 25%를 차지하고 있으며 공사비 비율은 일반적으로 전체공사비의 10~15%, 철근콘크리트공사비의 20~30%를 차지하고 있어 구조물의 안전성, 경제성 및 작업성과 품질관리에 중요한 역할을 한다. 또한 거푸집은 콘크리트가 양생되면 곧 해체되는 가설구조물로써 작업상에서 많은 위험요소를 포함하고 있으며 특히, 아파트공사의 경우 전체 재해발생의 17%로 가장 높은 비율을 차지하고 있다. 이와 같이 거푸집공사는 가장 우선적으로 관리하여야 할 위험공종이며 전체공기를 좌우하는 주공정으로서 이를 재해발생의 측면에서 제어하는 것이 안전관리에 있어서 가장 효율적이며 큰 효과를 나타낼 수 있는 것으로 생각된다.(중략)

  • PDF

Integration of Temporary Fences for Demolition and Construction (해체${\cdot}$신축용 가설울타리의 통합방안)

  • Sin Dong-Sung;Jeon Jae-Man;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.258-261
    • /
    • 2003
  • Demolition is mort dangerous than construction and causes a lot of harmful environmental factors. But temporary fences used on demolition sites cannot play out their roles of blocking harmful environmental factors or securing stability and work space. They only block the view from the outside. This study begins with the possibility that the temporary fence can be installed prior to demolition. As a preceding step. we performed research on the actual conditions of using it. We then realized that it can be installed according to our research plan. First, we focused on actualizing the integration of temporary fences for demolition and construction. Here are the results of this study. First, we need to grasp the limiting factors of integration. Second, we ought to revise the Korean Architecture Standard Specification. Third, we should prepare against damage and transformation of fences. Finally, we can expect to reduce harmful environmental factors, cut down expenses, improve the working environment and raise the image of demolition by the integration of these fences.

  • PDF

Case Study of Explosive Demolition for a Structure in Urban Area (Explosive Demolition of Former Sung-Nam City Hall to Construct Sung-Nam City Hospital) (도심지 구조물 발파해체 적용사례 (성남시 의료원 건립을 위한 구성남시청사 발파해체))

  • Jung, Min-Su;Song, Young-Suk;Heo, Eui-Haeng;Kim, Hyo-Jin
    • Explosives and Blasting
    • /
    • v.30 no.1
    • /
    • pp.17-28
    • /
    • 2012
  • Building demolitions at urban area make some inconvenience to neighborhood through generating noises, ground vibrations, and dusts. For this reason, various methods to control such environmental impacts have been being designed and practiced. Among the methods, the use of explosive demolition is rapidly increasing because it can minimize the inconveniency as well as decrease the working time and cost. In this respect, the old Sung-Nam city hall, which was a Rahmen structure comprised of beams, slabs and columns, was decided to be demolished by explosive demolition. This paper shows that explosive demolition can be the most suitable way of removing old buildings eco-friendly, safely, and economically by showing the observation results obtained from the actual demolition operation for the Sung-Nam city hall.