Korean Journal of Construction Engineering and Management
/
v.24
no.6
/
pp.45-52
/
2023
Recently, as climate change caused by greenhouse gases is intensifying, the international community has committed to reduce greenhouse gas emissions. The purpose of this study is to present the methodology and major considerations for investment judgment. Two actual cases of overseas projects were selected as study subjects. As an analysis method, the major risk factors were defined as a probability distribution, and the NPV was stochastically estimated using the Monte Carlo simulation method. In addition, assuming a policy change, the range of NPV change was analyzed. As a result, the average NPV of project A was lowered by 19%, and the probability of showing a negative NPV was 12.2%. The average value of project B was lowered by 12.5%. Considering the policy change, project A can obtain economic benefits only when it obtains 72.9% or more of the total amount of carbon credits generated, and project B is economically feasible when it acquires 49.5% or more. As a result, the average value of project A is lower than the net present value under basic assumptions, so caution is needed in investment decisions depending on changes in major risk factors. Additionally, considering policy changes, the carbon credit distribution ratio should be differentially applied depending on the project size, and this was presented as a specific figure.
Korean Journal of Construction Engineering and Management
/
v.10
no.5
/
pp.3-15
/
2009
Recently, it has increased projects in the Oil and Gas industry as growing plant of overseas construction market. Therefore, domestic companies need to set some aggressive plans up that secure competitiveness of international plant business such as enhancing productivity, technological ability and statistical management. Specifically in the Oil and Gas industry of overseas plant business requires implying information in EPC (Engineering, Procurement and Construction, below EPC) more, but it has not been suggested an appropriate breakdown system for contents that manages the information each EPC phase, which lead to problems such as revision of design document, occurring duplicated work and omissions of each participant. For these problems, we find market share decreasing and competitiveness running down. Thus, for increasing practical use of contents management system and construction industry's information, this paper suggests a contents breakdown system based on BPM (Business Process Management), defines business process and systematizing knowledge needed, and finally analyzing contents information that establish information among industrial facilities in Design phase which is the weakest part of domestic companies.
Korean Journal of Construction Engineering and Management
/
v.20
no.1
/
pp.141-150
/
2019
In the overseas plant construction market, the domain construction firms' construction capability has been greatly improved, but the capability of project management is evaluated to be insufficient compared to the technical aspect. Project management capabilities from the initial planning stage of project execution are regarded as the core competence of advanced construction companies. Among them, it is urgent to improve the capacity of conceptual estimate for domestic companies. In this study, the researchers surveyed and analyzed the methodology of estimating project cost in the planning phase of the plant project and developed an estimation method by conducting a case study analysis. Based on the logic of the cost index and parametric estimation method among the existing estimation methodology, the estimation tool was developed by deriving the input and output variables tailored to the plant project. The validity of the proposed methodology was evaluated by comparing the accuracy between the project estimate amount of the case project and the actual project amount. In order to increase the utilization of the developed conceptual estimate methodology,for plant construction project, it is necessary to systematize the data of the historical project data. Increasing the accuracy of future project cost estimates is directly related to increasing project award and profitability of the domestic construction company.
Korean Journal of Construction Engineering and Management
/
v.8
no.6
/
pp.227-234
/
2007
현재 플랜트 산업이 해외 건설 부문에서 차지하는 비중은 해외 건설 수주액의 60% 이상에 달하고 있다. 하지만 시공부문의 높은 기술경쟁력에 비하여 고부가가치 창출이 가능한 설계부문은 그 기술이 미흡한 실정이다. 따라서 본 연구에서는 플랜트산업의 우수설계능력 확보를 위하여 플랜트 설계단계의 성공에 대한 정의를 내리고, 플랜트 설계업무를 분석한 뒤, 설문조사를 통하여 플랜트 설계단계 프로세스의 업무별 중요도를 파악하였다. 또한 이렇게 파악된 중요도 점수를 공정관리 프로그램에 적용하였고, 이를 바탕으로 제시된 결과에 대한 전문가의 검토를 통하여 최종적으로 플랜트 설계단계의 핵심성공요인(CSF)을 도출하였다. 본 연구의 결과는 플랜트 설계단계 성공의 요인을 파악하고 확인 및 관리를 위한 요소들을 제시하여 설계단계 업무수행의 가이드라인으로 활용될 수 있을 것으로 기대된다. 또한, 향후에는 도출된 핵심성공요인을 이용하여 플랜트의 성공과 실패를 가름할 수 있는 정량적 평가모델 개발 등의 연구가 수행될 수 있을 것이다.
Yang, Sihoon;Kang, Taek-Ki;Cho, Young Duk;Kim, Jae-Jun
Korean Journal of Construction Engineering and Management
/
v.22
no.5
/
pp.39-47
/
2021
As domestic construction companies, which used to be concentrated in the Middle East, have expanded their overseas orders to new markets in Asia and Latin America, they have to cope with various conditions. The EPC plant project, which undertakes construction projects such as civil engineering and construction, design, purchase, construction and commissioning, has expanded its scope. As a result, it is important to collect Lessons Learned from the previous project, systematize it, and use it to respond to changes in the environment. However, many employees do not share their skills or experiences voluntarily. To do so, it is necessary to create and systematize a culture that shares experience and technology. In order to understand and analyze the current situation, a questionnaire was conducted on the EPC project-related departments of construction companies implementing the EPC plant project. About 74% of the participants said Lessons Learned's collection and utilization helped. About 53% of the people who collected and registered actual cases and 39% of the people who had experience in preventing problems using cases were identified as employees' perception and utilization of Lessons Learned systems. Detailed analysis showed differences in workplace, duties, and rank. Through this study, the current status of Lessons Learned collection and utilization of EPC plant projects is understood, and the research on collection and utilization improvement is being carried out.
KSCE Journal of Civil and Environmental Engineering Research
/
v.43
no.6
/
pp.811-819
/
2023
Understanding the local conditions is a crucial factor in enhancing the success potential of overseas construction projects. This can be achieved through the analysis of news articles of the target market using topic modeling techniques. In this study, the authors aimed to analyze news articles using two topic modeling methods, namely Latent Dirichlet Allocation (LDA) and BERTopic, in order to determine the optimal approach for market condition analysis. To evaluate the alignment between the generated topics and the actual themes of the news documents, the research collected 6,273 BBC news articles, created ground truth data for individual news article topics, and finally compared this ground truth with the results of the topic modeling. The F1 score for LDA was 0.011, while BERTopic achieved a score of 0.244. These results indicate that BERTopic more accurately reflected the actual topics of news articles, making it more effective for understanding the overseas construction market.
일본이 참가를 표명하고 있는 차세대 초대형 광적외선망원경 TMT는 무엇인가. TMT는 국제협력으로 하나의 초대형망원경을 건설하는 프로젝터이고, 각국 각 파트너가 주요 구성품을 제조해서 하나의 큰 망원경시스템을 구축한다. 따라서 이들 구성품을 통합해서 종합성능을 달성하는 프로젝트관리가 매우 중요하게 된다. 기술적 요소뿐만 아니라 시스템설계와 구성품 간의 인터페이스 정의 관리에도 큰 도전이 필요한 프로젝트이다. 마찬가지로 국립천문대가 참가하고 있는 국제적인 거대천문시설인 ALMA 전파망원경도 3개의 주요 파트너가 구성품을 제조해 완성하고 있다. 본고는 자연과학연구기구 국립천문대 TMT프로젝터실 야마시타 타쿠야 연구원이 월간 광기술 컨텍트 2012년 2월에 기고한 내용으로서 그린광학의 유정훈 팀장이 번역에 도움을 주었다.
Korean Journal of Construction Engineering and Management
/
v.14
no.4
/
pp.140-151
/
2013
In 2011 and 2012, Korean construction firms awarded around $ 64.5. Billion each year from the overseas market in 2011. This contract value accounted for overwhelming portion of total overseas construction contract values, and this growth is expected to continue for the next decade. However, contract scopes awarded to the Korean construction firms mainly involve detailed design and construction phases due to their competitiveness for the construction techniques. In other words, front-end-engineering-design and construction project management are not considered part of core business due to the lack of project management skills and experience. The researchers focused on development of construction sequence model required to improve construction planning and scheduling skills for the Korean construction firms. The model identifies critical work items and the sequence throughout project execution process. In addition, the researchers developed a risk evaluation method by applying fuzzy theory to the critical construction activities for the industrial plant construction projects. Developed methodology will help project practitioners to develop project schedule in a timely and effe ctive manner and evaluate project risks associated with scheduling process for the industrial plant construction projects.
도입까지 시간이 걸릴 것이라고 예측됐던 건설정보모델링(BIM : Building Information Modeling, 이하 BIM)이 어느새 성큼 다양한 분야에 진입했다. 영국, 싱가포르, 미국 등 해외에서는 이미 공공사업 시 BIM을 적극적으로 활용하고 있다. 우리나라 또한 2018년 국토교통부에서 '스마트 건설기술 로드맵'을 마련한 후 공공사업에 BIM을 단계적으로 도입해왔다. 대부분의 발주기관들은 오는 2025년까지 공공사업에 BIM을 전면 도입한다는 계획이다. 성균관대학교 공과대학 건설환경공학부 및 미래도시융합공학과 교수이자 국제건설자동화학회의 종신 상임이사인 권순욱 교수는 '스마트 건설 관리' 연구자이자 국내외에서 활동 중인 CM, BIM의 권위자다. 관련 분야의 책 8권과 100편 이상의 논문을 집필하고 30여 개의 특허·소프트웨어 등록을 보유하고 있다. 텍사스 오스틴 대학교 토목공학 박사 출신으로, 삼성물산, 한국건설기술연구원 등 일반 기업과 국가기관에서 실무와 이론을 두루 경험하며 경력을 쌓았다. 건설연구개발사업, 첨단 융복합 건설기술 등 다수의 국가 건설 R&D에 참여해 초고층 자재, 안전 모니터링, BIM 프로세스 표준개발 등의 시스템을 개발하기도 했다. 해외 연구자들과의 교류에도 적극적이다. 세계 석학들과 '노령 공학' 관련 영문교과서를 공동 집필(스마트주택 챕터 담당)했고, 2016년과 2019년엔 국제건설자동화학회와 국제프로젝트관리학회의 연사 자격으로 강단에 섰다. "영국, 싱가포르 등에선 공공사업을 100% BIM으로 발주하기 시작했습니다. 우리나라 정부도 비슷한 길을 가고 있습니다. 일정 규모의 발주 물량이 안정적으로 나오는 공공기관에서 그렇게 한다는 것은 국가가 전체 패러다임을 바꾸겠다는 의지 아닐까요?" 6월 10일 그의 연구실에서 권순욱 교수를 만나 BIM의 현황과 전망에 대해 들어봤다.
Journal of the Korea Institute of Building Construction
/
v.9
no.6
/
pp.151-159
/
2009
Recently, overseas construction projects have been increasing in the Middle East and Southeast Asia regions. These projects require various licenses and technologies for the manufacturing and handling processes. Additionally, the efficiency of the entire process management life cycle determines the success or failure of the business. Nonetheless, there exist various risks involved in the whole life cycle process due to a lack of experience and knowledge of management techniques. The objective of this paper is to analyze the business process of a LNG plant throughout the pre-construction and procurement phases, and to identify the knowledge and information needed for the development of the KMS. The study also plans to build a comprehensive knowledge management system throughout the whole life cycle as its final objective.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.