• Title/Summary/Keyword: 해외건설 프로젝트

Search Result 130, Processing Time 0.023 seconds

A Study on Variation of Economic Value of Overseas Carbon Reduction Projects with Risk Factors (해외 탄소저감 사업의 위험요소를 고려한 사업 경제성 변동 분석)

  • Park, Jongyul;Choa, Sunghoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.6
    • /
    • pp.45-52
    • /
    • 2023
  • Recently, as climate change caused by greenhouse gases is intensifying, the international community has committed to reduce greenhouse gas emissions. The purpose of this study is to present the methodology and major considerations for investment judgment. Two actual cases of overseas projects were selected as study subjects. As an analysis method, the major risk factors were defined as a probability distribution, and the NPV was stochastically estimated using the Monte Carlo simulation method. In addition, assuming a policy change, the range of NPV change was analyzed. As a result, the average NPV of project A was lowered by 19%, and the probability of showing a negative NPV was 12.2%. The average value of project B was lowered by 12.5%. Considering the policy change, project A can obtain economic benefits only when it obtains 72.9% or more of the total amount of carbon credits generated, and project B is economically feasible when it acquires 49.5% or more. As a result, the average value of project A is lower than the net present value under basic assumptions, so caution is needed in investment decisions depending on changes in major risk factors. Additionally, considering policy changes, the carbon credit distribution ratio should be differentially applied depending on the project size, and this was presented as a specific figure.

Information Breakdown Structure of Engineering Phase for Plant Project through Business Analysis (산업설비 업무 분석을 통한 설계단계 정보 분류체계)

  • Song, Young-Woongl;Cho, Hang-Min;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.3-15
    • /
    • 2009
  • Recently, it has increased projects in the Oil and Gas industry as growing plant of overseas construction market. Therefore, domestic companies need to set some aggressive plans up that secure competitiveness of international plant business such as enhancing productivity, technological ability and statistical management. Specifically in the Oil and Gas industry of overseas plant business requires implying information in EPC (Engineering, Procurement and Construction, below EPC) more, but it has not been suggested an appropriate breakdown system for contents that manages the information each EPC phase, which lead to problems such as revision of design document, occurring duplicated work and omissions of each participant. For these problems, we find market share decreasing and competitiveness running down. Thus, for increasing practical use of contents management system and construction industry's information, this paper suggests a contents breakdown system based on BPM (Business Process Management), defines business process and systematizing knowledge needed, and finally analyzing contents information that establish information among industrial facilities in Design phase which is the weakest part of domestic companies.

Development of a Conceptual Estimate Methodology for Plant Construction Projects (플랜트 건설 프로젝트를 위한 개산견적 방법론 개발)

  • Kim, Hyun-Joong;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.141-150
    • /
    • 2019
  • In the overseas plant construction market, the domain construction firms' construction capability has been greatly improved, but the capability of project management is evaluated to be insufficient compared to the technical aspect. Project management capabilities from the initial planning stage of project execution are regarded as the core competence of advanced construction companies. Among them, it is urgent to improve the capacity of conceptual estimate for domestic companies. In this study, the researchers surveyed and analyzed the methodology of estimating project cost in the planning phase of the plant project and developed an estimation method by conducting a case study analysis. Based on the logic of the cost index and parametric estimation method among the existing estimation methodology, the estimation tool was developed by deriving the input and output variables tailored to the plant project. The validity of the proposed methodology was evaluated by comparing the accuracy between the project estimate amount of the case project and the actual project amount. In order to increase the utilization of the developed conceptual estimate methodology,for plant construction project, it is necessary to systematize the data of the historical project data. Increasing the accuracy of future project cost estimates is directly related to increasing project award and profitability of the domestic construction company.

A Study on the Critical Success Factors for Engineering step on Plant Project (플랜트 설계단계 핵심성공요인(CSF) 도출에 관한 연구)

  • Son, Jae-Ho;Han, Choong-Hee;Kim, Jae-On;Lee, Sang-Youb
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.227-234
    • /
    • 2007
  • 현재 플랜트 산업이 해외 건설 부문에서 차지하는 비중은 해외 건설 수주액의 60% 이상에 달하고 있다. 하지만 시공부문의 높은 기술경쟁력에 비하여 고부가가치 창출이 가능한 설계부문은 그 기술이 미흡한 실정이다. 따라서 본 연구에서는 플랜트산업의 우수설계능력 확보를 위하여 플랜트 설계단계의 성공에 대한 정의를 내리고, 플랜트 설계업무를 분석한 뒤, 설문조사를 통하여 플랜트 설계단계 프로세스의 업무별 중요도를 파악하였다. 또한 이렇게 파악된 중요도 점수를 공정관리 프로그램에 적용하였고, 이를 바탕으로 제시된 결과에 대한 전문가의 검토를 통하여 최종적으로 플랜트 설계단계의 핵심성공요인(CSF)을 도출하였다. 본 연구의 결과는 플랜트 설계단계 성공의 요인을 파악하고 확인 및 관리를 위한 요소들을 제시하여 설계단계 업무수행의 가이드라인으로 활용될 수 있을 것으로 기대된다. 또한, 향후에는 도출된 핵심성공요인을 이용하여 플랜트의 성공과 실패를 가름할 수 있는 정량적 평가모델 개발 등의 연구가 수행될 수 있을 것이다.

EPC Plant Project Lessons Learned Utilization Analysis (EPC 플랜트 프로젝트의 성공/실패사례 활용도 분석)

  • Yang, Sihoon;Kang, Taek-Ki;Cho, Young Duk;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.5
    • /
    • pp.39-47
    • /
    • 2021
  • As domestic construction companies, which used to be concentrated in the Middle East, have expanded their overseas orders to new markets in Asia and Latin America, they have to cope with various conditions. The EPC plant project, which undertakes construction projects such as civil engineering and construction, design, purchase, construction and commissioning, has expanded its scope. As a result, it is important to collect Lessons Learned from the previous project, systematize it, and use it to respond to changes in the environment. However, many employees do not share their skills or experiences voluntarily. To do so, it is necessary to create and systematize a culture that shares experience and technology. In order to understand and analyze the current situation, a questionnaire was conducted on the EPC project-related departments of construction companies implementing the EPC plant project. About 74% of the participants said Lessons Learned's collection and utilization helped. About 53% of the people who collected and registered actual cases and 39% of the people who had experience in preventing problems using cases were identified as employees' perception and utilization of Lessons Learned systems. Detailed analysis showed differences in workplace, duties, and rank. Through this study, the current status of Lessons Learned collection and utilization of EPC plant projects is understood, and the research on collection and utilization improvement is being carried out.

Evaluation of Topic Modeling Performance for Overseas Construction Market Analysis Using LDA and BERTopic on News Articles (LDA 및 BERTopic 기반 해외건설시장 뉴스 기사 토픽모델링 성능평가)

  • Baik, Joonwoo;Chung, Sehwan;Chi, Seokho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.6
    • /
    • pp.811-819
    • /
    • 2023
  • Understanding the local conditions is a crucial factor in enhancing the success potential of overseas construction projects. This can be achieved through the analysis of news articles of the target market using topic modeling techniques. In this study, the authors aimed to analyze news articles using two topic modeling methods, namely Latent Dirichlet Allocation (LDA) and BERTopic, in order to determine the optimal approach for market condition analysis. To evaluate the alignment between the generated topics and the actual themes of the news documents, the research collected 6,273 BBC news articles, created ground truth data for individual news article topics, and finally compared this ground truth with the results of the topic modeling. The F1 score for LDA was 0.011, while BERTopic achieved a score of 0.244. These results indicate that BERTopic more accurately reflected the actual topics of news articles, making it more effective for understanding the overseas construction market.

해외리포트 - 차세대 초대형 광적외선망원경 TMT

  • 한국광학기기협회
    • The Optical Journal
    • /
    • s.139
    • /
    • pp.44-49
    • /
    • 2012
  • 일본이 참가를 표명하고 있는 차세대 초대형 광적외선망원경 TMT는 무엇인가. TMT는 국제협력으로 하나의 초대형망원경을 건설하는 프로젝터이고, 각국 각 파트너가 주요 구성품을 제조해서 하나의 큰 망원경시스템을 구축한다. 따라서 이들 구성품을 통합해서 종합성능을 달성하는 프로젝트관리가 매우 중요하게 된다. 기술적 요소뿐만 아니라 시스템설계와 구성품 간의 인터페이스 정의 관리에도 큰 도전이 필요한 프로젝트이다. 마찬가지로 국립천문대가 참가하고 있는 국제적인 거대천문시설인 ALMA 전파망원경도 3개의 주요 파트너가 구성품을 제조해 완성하고 있다. 본고는 자연과학연구기구 국립천문대 TMT프로젝터실 야마시타 타쿠야 연구원이 월간 광기술 컨텍트 2012년 2월에 기고한 내용으로서 그린광학의 유정훈 팀장이 번역에 도움을 주었다.

  • PDF

Project Risk Assessment Through Construction Sequence Analyses for Industrial Plant Construction Projects (산업플랜트 건설 프로젝트의 주요 공정 시퀀스 분석을 통한 리스크 평가)

  • Lee, Kyusung;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.140-151
    • /
    • 2013
  • In 2011 and 2012, Korean construction firms awarded around $ 64.5. Billion each year from the overseas market in 2011. This contract value accounted for overwhelming portion of total overseas construction contract values, and this growth is expected to continue for the next decade. However, contract scopes awarded to the Korean construction firms mainly involve detailed design and construction phases due to their competitiveness for the construction techniques. In other words, front-end-engineering-design and construction project management are not considered part of core business due to the lack of project management skills and experience. The researchers focused on development of construction sequence model required to improve construction planning and scheduling skills for the Korean construction firms. The model identifies critical work items and the sequence throughout project execution process. In addition, the researchers developed a risk evaluation method by applying fuzzy theory to the critical construction activities for the industrial plant construction projects. Developed methodology will help project practitioners to develop project schedule in a timely and effe ctive manner and evaluate project risks associated with scheduling process for the industrial plant construction projects.

Interview - Standardization of Design Drawings·Modular Building⋯ "The era of BIM? Already has come." (인터뷰 - 설계도면 표준화·모듈러 건축⋯ "BIM의 시대? 이미 왔다")

  • Lee, Yu-Ri
    • Korean Architects
    • /
    • s.615
    • /
    • pp.28-31
    • /
    • 2020
  • 도입까지 시간이 걸릴 것이라고 예측됐던 건설정보모델링(BIM : Building Information Modeling, 이하 BIM)이 어느새 성큼 다양한 분야에 진입했다. 영국, 싱가포르, 미국 등 해외에서는 이미 공공사업 시 BIM을 적극적으로 활용하고 있다. 우리나라 또한 2018년 국토교통부에서 '스마트 건설기술 로드맵'을 마련한 후 공공사업에 BIM을 단계적으로 도입해왔다. 대부분의 발주기관들은 오는 2025년까지 공공사업에 BIM을 전면 도입한다는 계획이다. 성균관대학교 공과대학 건설환경공학부 및 미래도시융합공학과 교수이자 국제건설자동화학회의 종신 상임이사인 권순욱 교수는 '스마트 건설 관리' 연구자이자 국내외에서 활동 중인 CM, BIM의 권위자다. 관련 분야의 책 8권과 100편 이상의 논문을 집필하고 30여 개의 특허·소프트웨어 등록을 보유하고 있다. 텍사스 오스틴 대학교 토목공학 박사 출신으로, 삼성물산, 한국건설기술연구원 등 일반 기업과 국가기관에서 실무와 이론을 두루 경험하며 경력을 쌓았다. 건설연구개발사업, 첨단 융복합 건설기술 등 다수의 국가 건설 R&D에 참여해 초고층 자재, 안전 모니터링, BIM 프로세스 표준개발 등의 시스템을 개발하기도 했다. 해외 연구자들과의 교류에도 적극적이다. 세계 석학들과 '노령 공학' 관련 영문교과서를 공동 집필(스마트주택 챕터 담당)했고, 2016년과 2019년엔 국제건설자동화학회와 국제프로젝트관리학회의 연사 자격으로 강단에 섰다. "영국, 싱가포르 등에선 공공사업을 100% BIM으로 발주하기 시작했습니다. 우리나라 정부도 비슷한 길을 가고 있습니다. 일정 규모의 발주 물량이 안정적으로 나오는 공공기관에서 그렇게 한다는 것은 국가가 전체 패러다임을 바꾸겠다는 의지 아닐까요?" 6월 10일 그의 연구실에서 권순욱 교수를 만나 BIM의 현황과 전망에 대해 들어봤다.

  • PDF

Analysis of Pre-construction Processes and Development of KMS Prototype of LNG Plant Projects (해외 LNG Plant 프로젝트 초기 프로세스 분석 및 지식관리시스템 프로토타입 구축)

  • Won, Seo-Kyung;Lee, Jun-Bok;Han, Choong-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.6
    • /
    • pp.151-159
    • /
    • 2009
  • Recently, overseas construction projects have been increasing in the Middle East and Southeast Asia regions. These projects require various licenses and technologies for the manufacturing and handling processes. Additionally, the efficiency of the entire process management life cycle determines the success or failure of the business. Nonetheless, there exist various risks involved in the whole life cycle process due to a lack of experience and knowledge of management techniques. The objective of this paper is to analyze the business process of a LNG plant throughout the pre-construction and procurement phases, and to identify the knowledge and information needed for the development of the KMS. The study also plans to build a comprehensive knowledge management system throughout the whole life cycle as its final objective.