• Title/Summary/Keyword: 하자위험

Search Result 23, Processing Time 0.029 seconds

Assessment of Defect Risks in Apartment Projects based on the Defect Classification Framework (공동주택 하자분류체계 기반 하자위험 평가)

  • Jang, Ho-Myun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.3
    • /
    • pp.61-68
    • /
    • 2018
  • In general, defects cause a lot of maintenance costs and serious damage to various stakeholders, such as the owners, contractors or occupants of apartments. For this reason, a systematic and efficient defect management method is needed to minimize defect disputes. This paper derives a defect classification framework and proposes a defect risk assessment model for different types of defects. For this purpose, 6,000 defect items are allocated to the defect classification framework; these items are associated with 34 apartment projects over ten years old. As a result of this analysis, it was confirmed that the defect risks are concentrated in the areas of RC and finishing work. Based on these results, it is necessary to prevent the major risks of defects according to their priority. Based on this research, it is judged that further research to develop a method of managing the risks of defects may be necessary.

Assessment of Defect Risks in Apartment Projects based on the Defect Classification Framework (효율적인 품질관리를 위한 공동주택 하자위험 분석)

  • Jang, Ho-Myun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.11
    • /
    • pp.510-519
    • /
    • 2019
  • The aim of this study was to set a defect classification framework and evaluate the defect risks in apartment buildings For this, approximately 15,056 defect items for 133 apartment buildings were examined. As a result of the analysis, the major defect of the RC work was cracks, which were found mainly in public locations. Moreover, the RC work was found to exhibit a high defect risk of water problem and surface appearance, which are highly connected with cracks. Second, the finish work has a high defect risk because it is composed of various work types, and there are many kinds of materials and construction parts involved. Third, the major defects of the waterproof work were incorrect installation and missing tasks, which have high defect risks in the garage. This is because defects that require rework occur mainly in the underground garage. Based on these results, this study proposed countermeasures for defect risk management to be considered in the construction, handover, post-handover, and occupancy phases. These have been set in detail based on the three zones: low frequency high severity (LFHS), low frequency low severity (LFLS), and high frequency low severity (HFLS).

Analysis of Defect Risk by Work Types based on Warranty Liability Period in Apartments (공동주택 하자보수보증기간에 기초한 공종별 하자위험 분석)

  • Kim, Sang-Hyeon;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.4
    • /
    • pp.34-42
    • /
    • 2018
  • Apartment is a typical type of housing preferred by the majority of people. However, and defect disputes occur because various defects such as cracks, subsidence, breakage, water leakage, dew condensation and dropout are confirmed with numerous structures and finishing materials. From this point of view, this paper analyzes defect frequency and costs of each warranty period by work types, and estimates defect risks by using defect dispute cases. It examined about 5,337 defect items for 32 apartment over ten years old. In this paper, there are 10 types of work types and the warranty liability period is divided into 6 categories. Based on these categories, defect frequency and costs are investigated, and finally defect risk of the warranty liability period by work types confirmed. As a result of this analysis, it was found that defect risk in RC and finishing work is very high. Especially the RC work revealed that there is a high risk of trying from the third year onwards and it was found that the defect risk up to the second year is high in the finishing work. Due to aging of RC structure, the defect risk gradually increases, and finishing work initially cause defect disputes because of the housing environment.

An Examination of a Risk Assessment Method and Analysis of Defect Types of Apartment Finishing Works (공동주택 마감공사의 하자유형별 분석 및 위험성 평가 방법에 관한 연구)

  • Son, Seunghyun;Lee, Jae-hyeon;Son, Kiyoung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.2
    • /
    • pp.249-260
    • /
    • 2024
  • In recent years, the proportion of medium and small-sized apartments within the housing market has seen a noticeable increase, alongside a corresponding rise in disputes related to construction defects. Such disputes are most prevalent in the finishing works phase of construction, which not only are frequent in occurrence but also impose significant repair costs. Furthermore, there is a noticeable scarcity of research focused on the quality management of finishing work defects prior to the completion of construction. Addressing this issue necessitates a methodology capable of preemptively identifying defects by analyzing their frequency and associated costs across various defect types. Consequently, the aim of this study is to propose a risk assessment methodology by conducting an analysis of defect cases across 3,299 apartment units, considering aspects such as frequency and severity. The outcomes of this research endeavor are expected to offer practical management strategies to enhance the quality of apartment finishing works and serve as an academic foundation for the enhancement of construction management systems pertaining to apartment finishing works.

Evaluation of defective risk for the finishing work of apartment house (공동주택 마감공사의 하자위험도 평가에 관한 연구)

  • Kim, Jin-Hyun;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.63-70
    • /
    • 2012
  • The apartment house taking most part of our housing types was facing the limit of consumption from the housing supply-oriented policy in the past of rapid urbanization resulting in being transferred to the housing supply-oriented one. Accordingly the requirement for housing quality by customers is diversified varied, in order to meet this the effective and systematic quality control for preventing the defects from the stage of building is required. In this study for the effective and systematic quality management for defects of apartment house analysis on the frequencies and loss expenses from defective maintenance regarding examples of apartment houses having been moved in within five years recently, and the survey on their dwellers' consciousness were made, and the table for quantified apartment house defective risk.

A Method to Improve the Risk Assessment in the Defense Quality Assurance Using AHP (AHP를 활용한 국방 품질보증 위험도 평가 개선 방안)

  • Lee, Nack-Hyung;Lee, Sang-Jin
    • Journal of the military operations research society of Korea
    • /
    • v.33 no.1
    • /
    • pp.31-42
    • /
    • 2007
  • While Defense Agency fur Technology and Quality(DTaQ) has been utilized a risk assessment method as a quality assurance activity for defense goods since 1999, a risk assessment method is known to be ineffective to identify defective items. The objective of this study is to propose the new evaluation method, that adjusts a relative priority of evaluation elements using AHP(Analytic Hierarchy Process). Newly evaluated scores have been applied to the risk assessment result of 2005 defective items to test a validity of the new evaluation model. The new model is capable to identify more high and medium risk-level items than the current method. The company risk-level gets more scores than the item risk-level in the new model.

Critical Management Factors of Fluid-Applied Membrane Waterproofing Work for building basements (지하층 도막방수공사의 중점관리요인)

  • Kwon, Hae-Rim;Yu, Jung-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.6
    • /
    • pp.91-98
    • /
    • 2009
  • One role of waterproofing work is to block external moisture and water. Defects in waterproofing work in building construction brings on huge repair costs for related construction work as well as for the waterproofing layer itself. However, we don't have a quantitative probabilistic management method for waterproofing work to successfully anticipate and prevent defects. From an analysis of the literature and prior research, defects in the waterproofing work in the underground parts of buildings occur frequently. We selected Fluid-Applied Membrane waterproofing work as representing waterproofing work in the underground parts of a building, and researched the general types and causes of defects. In this study, we developed the Relative-FMEA (Failure Mode and Effect Analysis) approach that merges the Matrix method and FMEA. From a survey of experts, we deduced the most important management factors for Fluid-Applied Membrane waterproofing work for the underground parts of buildings.

풍수재 보험 현황 및 향후 개발 방향

  • Han, Seok-Hui
    • 방재와보험
    • /
    • s.107
    • /
    • pp.16-20
    • /
    • 2005
  • 풍수해 사고의 경우 보험사의 위험 분산이 곤란해 심한 재정적 타격을 입을 수 있으며 자율적인 손해율 관리가 어려워 개선방안이 논의되고 있다. 이에 국내 풍수재 관련 보험상품 및 외국의 풍수재 보험 운영사례를 통해 향후 지향해야 할 운영방안을 모색해보도록 하자.

  • PDF

Developing Countermeasure Model to Prevent Planned Lawsuit on Apartment Construction Defects (공동주택 하자기획소송에 대한 건설사 사전 대응 모델 개발)

  • Cho, Youngsun;Cha, Heesung;Kim, Kyungrai;Hwang, Youngkyu;Shin, Dongwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.74-82
    • /
    • 2014
  • The proportion of apartment housing has been increased to solve the housing problems resulted from rapid growth in urban population and urban economy. With the increase in apartment's proportions and the concern about quality of housing, the contractors have made efforts to satisfy the customers in improving the quality of housing. Despite these efforts, the conflicts between the contractor and the customers are getting serious. Also the disputes and the litigation of defect are increasing because of the contractor's negative treatment and inadequate countermeasure. In this study the defect lawsuits which bring actions against the contractors are collected and analyzed. And then the strategic countermeasures are proposed according to the classifying the type of defect and size. The suggested countermeasure model before the defects are resulted is expected to contribute in developing the contractors strategies to reduce the conflicts against customers.

How Different Material of Wood Deck Impact Workability and Defect Occurrence (목재데크 소재의 차이가 시공성 및 하자발생에 미치는 영향)

  • LEE, Hyukjae
    • The Journal of the Convergence on Culture Technology
    • /
    • v.6 no.1
    • /
    • pp.463-469
    • /
    • 2020
  • People enjoy more leisure time these days as the government introduced the workweek last year and there is a growing interest on living healthy life. Amidst such change in society, trekking in forest has gained popularity along more people spending leisure time by walking for health. As a result, there are many scenic trails being built using wood deck. Usually certain parts of trails are built with wood deck where the path maybe too dangerous for walking or where nature needs to be protected. However wood material used for deck is easily prone to defects which can lead to safety issues. This study aims to understand the differences by materials used for wood deck and to investigate a link between different materials used and causes for defect occurrence. And further, the study aims to identify materials and construction methods for high workability and safety. The study was able to conclude that different materials used and different construction methods of applied for wood deck yield different results in terms of workability and defect occurrence.