• Title/Summary/Keyword: 필라 폭

Search Result 19, Processing Time 0.025 seconds

Behavior and pillar stability of enlarged existing parallel tunnels (기존 병설터널의 확폭에 따른 터널 거동 및 필라 안정성 분석)

  • Lee, Myeong-Han;Kim, Bumjoo;Jang, Yeon-Soo;Yun, Ji-Nam;Park, Hyun-Gon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.5
    • /
    • pp.537-546
    • /
    • 2013
  • Traffic congestion in existing tunnels has increased due to increased traffic volume and enlarged vehicles. Enlarging existing tunnels has advantages over constructing new tunnels by reducing land purchasing costs as well as minimizing natural environment destruction. In fact, many overseas projects for enlarging existing tunnels have been reported. Thus, it appears that the demand on enlarging existing tunnels continues to rise in Korea in near future. Nonetheless, the studies related to the enlarged tunnels have been relatively rare since there have been few tunnel enlargement projects in Korea. In the present study, the tunnel behavior and the stability of rock pillar when enlarging existing parallel tunnels were investigated by performing FE analysis and using existing theory and empirical relationships. Four different enlarging cases, depending on the enlargement types and directions, were examined in the study. According to the results, for the tunnels with the same pillar width after enlarged, the uni-laterally enlarged tunnel indicated 5 to 20% higher crown settlement compared to the bi-laterally enlarged tunnel, and for the tunnel with the narrowest pillar, the highest shotcrete stress was observed. Also, the strength/stress ratio for rock pillar was more than 1.0 for all four enlargement cases, and the Matsuda's method was found to give higher strength/stress ratio by about 50% compared to the Peck's method.

Pillar load and ground deformation in 2-arch tunnel in the jointed rock mass (절리암반에서 2-Arch 터널의 필라하중과 지반변위)

  • Lee, Sang-Duk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.9 no.1
    • /
    • pp.91-97
    • /
    • 2007
  • Loads on the pillar and ground deformation in 2-arch tunnel, which is excavated in the rock mass with regular discontinuities, depending on the dips of discontinuities and the construction sequences were experimentally studied. Large scale model tests in the biaxial test facility were performed. Tested model (width 3.3m, height 3.0m, and length 0.45m) for 2-arch tunnel in 1/10 scale were built with various dips. Test results show that discontinuities have greate affects on the behavior of the 2-arch tunnel, especially on the pillar loads and ground deformation.

  • PDF

A Study on the Stability Estimation Procedure for Reinforced Pillar of Twin Tunnel (병설터널 보강 필라의 안정성 평가방법에 관한 연구)

  • Baek, Seungcheol;Jang, Busik;Lee, Taegyu;Lee, Sungmin;Hwang, Jungsoon
    • Journal of the Korean GEO-environmental Society
    • /
    • v.10 no.7
    • /
    • pp.81-91
    • /
    • 2009
  • Recently, twin-tunnel is often designed in the aspects of disaster prevention and economical reasons. However, the design cases and the studies are relatively insufficient. By the twin-tunnel excavation, deviate stresses of pillar between tunnels are increased and the increased stresses induce the instability of the twin-tunnel. In this study, numerical analyses about the twin-tunnel behaviour were conducted with varying ground strength, width of pillar and depth of earth cover and a series of regression analyses were carried out by using the results of numerical analyses for the twin-tunnel. Based on the numerical analyses, an estimation method of derived stresses is suggested through the regression analyses. Also, based on the results of regression analyses, an quantitative estimation method considering the reinforcement effects is also suggested. Then various parametric studies were conducted to be considered the reinforcement type and various design parameters. Finally, the efficiency of the suggested method based on the Hoek-Brown Failure Criterion is verified through the results of parametric studies.

  • PDF

Stability Analysis of Multiple Thermal Energy Storage Caverns Using a Coupled Thermal-Mechanical Model (열-역학적 연계해석 모델을 이용한 다중 열저장공동 안정성 분석)

  • Kim, Hyunwoo;Park, Dohyun;Park, Eui-Seob;Sunwoo, Choon
    • Tunnel and Underground Space
    • /
    • v.24 no.4
    • /
    • pp.297-307
    • /
    • 2014
  • Cavern Thermal Energy Storage system stores thermal energy in caverns to recover industrial waste heat or avoid the sporadic characteristics of renewable-energy resources, and its advantages include high injection-and-extraction powers and the flexibility in selecting a storage medium. In the present study, the structural stability of rock mass pillar between these silo-type storage caverns was assessed using a coupled thermal-mechanical model in $FLAC^{3D}$. The results of numerical simulations showed that thermal stresses due to long-term storage depended on pillar width and had significant effect on the pillar stability. A sensitivity analysis of main factors indicated that the influence on the pillar stability increased in the order cavern depth < pillar width < in situ condition. It was suggested that two identical caverns should be separated by at least one diameter of the cavern and small-diameter shaft neighboring the cavern should be separated by more than half of the cavern diameter. Meanwhile, when the line of centers of two caverns was parallel to the direction of maximum horizontal principal stress, the shielding effect of the caverns could minimize an adverse effect caused by a large horizontal stress.

A Numerical Study on the Reinforcement Method of a Pillar Using Tension Bolts at the Connecting Part between 2-Arch Tunnels and Parallel Tunnels (2-Arch 터널과 병렬 터널 접속부에서의 텐션볼트를 사용한 필라 보강 방법에 대한 수치해석)

  • Park, Yeon-Jun;Choi, Jae-Jin
    • Tunnel and Underground Space
    • /
    • v.25 no.5
    • /
    • pp.470-486
    • /
    • 2015
  • Two-arch tunnels require minimal spacing between the 2 tunnels and thus occupy small amount of land compared to parallel tunnels. But it is rather expensive. The parallel tunnel is not as expensive, but it requires more land than 2-arch tunnels. This may cause a problem when there is a land shortage. The new design is to connect these two types of tunnels by another pair of parallel tunnels where the separation distance is gradually increasing. The applicability of this new design to the cases where rock condition is not even fair has to be verified since the width of the pillar between the connecting tunnels can be quite narrow. Therefore both two and three dimensional numerical analyses were conducted and pillar stability was examined for rock classes IV and V in two different ways. Results showed that this new design is still effective for poor rock conditions if central pillar is properly reinforced by tension bolts as long as overburden is less than five times of the tunnel diameter.

Numerical analysis study of reinforced method (loop type) at the double-deck tunnel junction (복층터널 분기부에서의 보강공법(루프형 강선)에 따른 수치해석 연구)

  • Lee, Seok Jin;Park, Skhan;Lee, Jun Ho;Jin, Hyun Sik
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.5
    • /
    • pp.823-837
    • /
    • 2018
  • Congestion of the city with the rapid industrial development was accelerated to build complex social infrastructure. And numerous structures have been designed and constructed in accordance with these requirements. Recently, to solve complex urban traffic, many researches of large-diameter tunnel under construction downtown are in progress. The large-diameter tunnel has been developed with a versatile double-deck of deep depth tunnel. For the safe tunnel construction, ground reinforcement methods have been developed in the weakened pillar section like as junction of tunnel. This paper focuses on evaluation of the effects of new developed ground reinforcement methods in double-deck junction. The values of reinforcement determined from the existing and developed methods were compared to each other by numerical simulation.

Tunnel Behavior According to the Pillar Width (터널의 필러부 폭에 따른 터널거동)

  • Kim, Youngsu;Kwon, Taesoon;Jeong, Ilhan;Kim, Kwangil
    • Journal of the Korean GEO-environmental Society
    • /
    • v.10 no.7
    • /
    • pp.15-23
    • /
    • 2009
  • This research area is a greate section of triple tunnels that passes through the fault fractured zone the in the granite area. In this area, tunnel section, pillar width and overburden height are changed consecutively due to declivity of 1 : 4.5 and slope formation of upper part as changed section. That is, stability estimation for each section varying pillar width can be conducted because tunnel diameter changes gradually from 0.5D to 1.0D according to distance of pillar width. We have estimated the stability of pillar width in triple tunnels with monitoring value, and compared the stability with results of numerical analysis.

  • PDF

A Case Study on the Design and Construction of a 2-arch Tunnel with Varying Section (2-아치 변단면터널의 설계 및 시공사례 연구)

  • Choi, Jae-Jin;Park, Yeon-Jun;Kim, Si-Keun;Park, Jae-Hyun
    • Tunnel and Underground Space
    • /
    • v.22 no.5
    • /
    • pp.310-320
    • /
    • 2012
  • This paper describes the design and construction of a 2-arch tunnel with varying section. This new design has advantages of 2-arch tunnels, which is rather expensive, but is still economically competitive compared to parallel tunnels. Economic analysis was also conducted. To secure the stability of the varying section tunnel, excavated part was reinforced by tie-bolts and RRS, and 2-arch part was supported by EPS blocks and concrete walls. Stability of the pillar was theoretically analyzed and also examined by numerical simulations for various widths. Displacement monitoring was conducted and results were compared with numerical results. Economic analysis showed reductions in construction cost and period by 11% and 10 months respectively.

Analysis on reduction characteristics of magnetization loss in YBCO CC by slit numbers (YBCO CC의 slit 개수에 따른 자화손실 저감 특성 해석)

  • Lee, Kwang-Youn;Park, Myung-Jin;Cha, Guee-Soo;Lee, Ji-Kwang
    • Proceedings of the KIEE Conference
    • /
    • 2005.07b
    • /
    • pp.1249-1251
    • /
    • 2005
  • YBCO CC의 초전도 전력기기 응용에 대한 자화손실 저감을 위한 연구가 진행중이다. 본 논문에서는 임계상태 모델에 기초한 수치해석을 이용하여 슬릿개수의 변화에 따른 YBCO CC의 자화손실 저감 특성을 해석하였다. 수치해석을 위한 YBCO CC의 규격은 두께와 폭이 각각 $2{\mu}m$, 4mm이며 슬릿에 의한 선재분한인 필라멘트는 각각 2,4,8개이다. 또한, 수치해석의 결과는 strip모델의 자화손실식과 비교하였다. 해석 결과, 자기적으로 결합되지 않은 strip모델 해석값과 수치해석값은 차이를 보였으며 필라멘트 개수의 변화에 따라 약 1/n 수준으로 자화손실이 저감됨을 확인하였다.

  • PDF