1 |
Choi, J.J., Park, Y.J., Kim, S.K., Park, J.H. (2012), "A case study on the design and construction of a 2-arch tunnel with varying section", Tunnel and Underground Space, Vol. 22, No. 5, pp. 310-320.
DOI
|
2 |
Hoek, E., Brown, E. T. (1980), "Underground excavations in rock", Institution of Mining and Metallurgy, pp. 201-203.
|
3 |
Kang, J.G., Lee, C.K., Lee, K.I. (2015), " Numerical analysis of rock pillar in tunnel diverging area", Journal of the Korean Geosynthetics Society, Vol. 14, No. 2, pp. 81-88.
DOI
|
4 |
Kim, D.S., Kim, Y.G. (2007), "A study on the stability analysis for asymmetry parallel tunnel with rock pillar", Journal of Korean Tunnelling and Underground Space Association, Vol. 9, No. 4, pp. 387-401.
|
5 |
Kim, H.M., Lee, S.D., (2009), "A study on the stress distribution of pillar basement during two-arch excavation in discontinuous rock mass", Tunnel and Underground Space, Vol. 19, No, 2, pp. 123-131.
|
6 |
Kim, W.B., Yang, H.S., Ha, T.W. (2012), "An assessment of rock pillar behavior in very near parallel tunnel", Tunnel and Underground Space, Vol. 22, No. 1, pp. 60-68.
DOI
|
7 |
Lee, S.J., Lee, J.H., Kim, B.C., Park, S. (2015), "Research of ground reinforcement method in double-deck tunnel junction", Proceedings of the KSCE 2015 Convention Conference, Gunsan, pp. 191-192.
|
8 |
Park, S.K., Lee, S.J., Lee, J.H., Kim, B.C., Jin, H.S. (2016), "Numerical simulation of reinforcement method using loop-type steel wire in double-deck tunnel junction", Proceedings of 34th ISTT International NO-Dig Beijing 2016, Beijing, 10-12 Oct., pp. 269-272.
|
9 |
Park, Y.J., Choi, J.J. (2015). "A numerical study on the reinforcement method of a pillar using tension bolts at the connecting part between 2-arch tunnels and parallel tunnels", Tunnel and Underground Space, Vol. 25, No. 5, pp. 470-486.
DOI
|