• Title/Summary/Keyword: 프로젝트 타당성 검토

Search Result 45, Processing Time 0.027 seconds

A Deep Learning Model to Predict BIM Execution Difficulty Based on Bidding Texts in Construction Projects (건설사업 입찰 텍스트의 BIM 수행 난이도 추론을 위한 딥러닝 모델)

  • Kim, Jeongsoo;Moon, Hyounseok;Park, Sangmi
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.6
    • /
    • pp.851-863
    • /
    • 2023
  • The mandatory use of BIM(Building Information Model) in larger Korean public construction projects necessitates participants to have a comprehensive understanding of the relevant procedures and technologies, especially during the bidding stage. However, most small and medium-sized construction and engineering companies possess limited BIM proficiency and understanding. This hampers their ability to recognize bidding requirements and make informed decisions. To address this challenge, our study introduces a method to gauge the complexity of BIM requirements in bidding documents. This is achieved by integrating a morphological analyzer, which encompasses BIM bidding terminology, with a deep learning model. We investigated the effects of the parameters in our proposed deep learning model and examined its predictive validity. The results revealed an F1-score of 0.83 for the test data, indicating that the model's predictions align closely with the actual BIM performance challenges.

Critical Success Factors for Wind Power Projects (풍력 발전소 프로젝트의 핵심성공요인)

  • Lyou, An-Suck;Kim, Byung-Il;Kim, Hyoung-Kwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.140-147
    • /
    • 2012
  • Climate changes caused by fossil fuel energy usages have led to serious environmental damages and resource scarcity. Ever-increasing demand for energy causes harsh competition in international energy markets. Nuclear power, which once was regarded as a desirable clean energy, began to face public oppositions after the Japanese nuclear disaster in 2011. In this context, wind power is now considered to be an ever-more important recyclable energy source. Thus, this study intended to identify critical success factors for wind power construction projects. After a thorough literature review, two focus group interview sessions were conducted. A questionnaire-based survey, coupled with the two previous methods, resulted in the extraction of important factors for the success of wind power projects. Experts, including those working as constructors, designers, and owners, were paid a direct visit for the interview and survey. The critical success factors were categorized into feasibility study, right policies, equipment selection, and project financing issues. The proposed critical success factors are expected to be an effective guideline for future investors in wind powers.

The Allocation Precedence of the Limited Same Resource to the Concurrent Activities under Multiple Criteria (다기준하 동일 한정 자원의 배당 우선순위 결정)

  • Hwang, Jin-Ha
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.159-167
    • /
    • 2008
  • This study provides a effective approach to the construction management problem with the limited number or amount of available resources using the analytic hierarchy process. Construction management is a series of decision making processes for planning and controling of cost, time and quality as main objectives in construction works. When several activities need the limited same resource at the same time, it is very hard to decide the priority of the activities in the real situations. For that the scientific decision making method and procedure for resource allocation are required. This study solves the resource allocation problem by dealing with the decision making problem which the activities are distributed to multiple projects and under multiple criteria. The analytic hierarchy process is a method devised to solve complex multi-criteria decision problems. The result shows that this study can be effectively used to make decisions in situations involving multiple objectives by evaluating the prioritized ranking and degree of the activity alternatives based on the overall preferences.

Understanding Characteristics of the Gifted in Invention for Establishing the Concept of the Gifted in Invention (발명영재상 수립을 위한 발명영재의 특성 이해)

  • Lee, Jae-Ho;Park, Kyung-Bin;Jin, Suk-Un;Ryu, Ji-Young;Lee, Sang-Chul;Ahn, Seong-Hun;Jin, Byung-Wook
    • Journal of Gifted/Talented Education
    • /
    • v.22 no.3
    • /
    • pp.551-573
    • /
    • 2012
  • Educating gifted students in invention is a totally new area for researchers as well as educators. Establishing the theoretical concept of the gifted in invention has been a challenging task to many education researchers in Korea for last several years. This study was conducted to understand characteristics of the gifted in invention with the eventual purpose to conceptualize 'giftedness in invention.' The Future Mind by Gardner was adopted as the frame for categorizing the characteristics of the gifted in invention. Based on Five Minds, this study listed 25 factors with their 80 characteristics after intensive literature review and field surveys. The findings of this study are expected to contribute to establishing the theoretical base of educating the gifted in invention, to identifying gifted youngsters to be great inventors, and to designing the educational programs for them.

Development of Process-centered Performance Task For Curriculum·Instruction·Assessment Alignment based on 2015 Revised Home Economics Curriculum (교육과정, 수업, 평가의 일체화를 위한 가정과 과정 중심 수행과제 개발)

  • Lee, Gyeong Suk;Yoo, Taemyung;Yang, Ji Sun
    • Journal of Korean Home Economics Education Association
    • /
    • v.30 no.4
    • /
    • pp.165-185
    • /
    • 2018
  • The purpose of the study was to show the development process of the total instructional alignment based on the 2015 revised technology home economics curriculum, and to present the detailed aspects of this task. The results of this study were as follows: First, the clarity phase of the performance established the annual evaluation plan to ensure the consistency of the achievement standard, the learning objectives and the assessment objectives through an analysis of the curriculum. Second, the development phase of the performance tasks and the grading criteria analyzed the contents area and determined the performance assessment task. The performance assessment consisted of a portfolio and project activity types, and also comprised of knowledge markets, as well as e-NIE tasks, including individual tasks and collective tasks. Third, the performance assessment and the results phase were conducted after planning the class operation according to the instructors' directions and arrangement of the schedule into block classes. Afterwards, the performance assessment tasks were revised by the teaching-learning community and class reflection on practical application. As these results demonstrate, developing performance tasks that are centered on the learner's development processes can contribute to teachers' expertise and improvement of instruction.

A Study on the Design Value Analysis Methodology for Bridge Structure Using Reliability Analysis (신뢰성 해석을 이용한 교량구조물의 설계VA기법 연구)

  • Kim, Seong-Il;Lee, Kwang-Mo;Choi, Suk-Won;Jung, Jun-Hwa;Kim, Seong-Il
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.114-125
    • /
    • 2009
  • In this study, a design value analysis technique that considered stochastic LCC and stochastic performance evaluation was proposed, and by introducing the concept of reliability analysis, a decision making that secured reliability was supported. The results of this study, which was carried out according to the above objectives and methods, are summarized as follows: 1) The design value analysis procedures and value state function, improved in order to carry out a reliable analysis when evaluating alternate proposals that were extracted after the function definition was complete, were formalized, and in order to secure consistency and efficiency for value evaluation procedures, an evaluation index scheme was proposed; 2) Database collection and analysis were done for a bridge's LCC analysis. As for the collection scope of data, literature of previous research done on a bridge's LCC analysis was used as the basis for analysis, and for securing reliability regarding analysis results and dealing with uncertainty of collected data, the MCS technique was applied; 3) Weights and evaluation ranks for performance evaluation of each of the alternate proposals, as well as LCC analysis model, analysis period, discount rate, user expense, safety inspection and safety diagnosis expense conditions for LCC analysis were proposed. Lastly, a feasibility study was done and conclusion was made about "OO grand bridge and connecting road construction work execution design" project centered on value analysis execution case.

A Study on the Development of Framework for Enhancing Data Quality in Data Warehouse Environments (데이터 웨어하우스 환경에서 데이터 품질의 향상을 위한 개념적 프레임워크의 개발에 관한 연구)

  • 정경수;김병곤;장상도
    • Proceedings of the Korea Database Society Conference
    • /
    • 1999.10a
    • /
    • pp.191-201
    • /
    • 1999
  • 데이터 웨어하우스와 데이터 품질에 관한 문헌연구를 통하여 데이터 웨어하우스 환경에서 데이터 품질의 향상을 위한 개념적 프레임워크를 개발하고자 하는 것이 본 연구의 목적이다. 데이터 웨어하우스 데이터 품질향상 활동을 지원하는 프레임워크를 개발하는 목적은 (1) 다양한 요구를 가진 사용자들이 웨어하우스 데이터에 접근하기 때문에, 사용자의 요구를 만족시키며 기업의 목적에 적합한 품질향상 활동을 지원하기 위해서이며, 다양한 기업활동을 가장 잘 지원할 수 있는 데이터 품질향상 지침을 관리자에게 제공하기 위해서 이다. (2) 웨어하우스 관리자의 데이터 품질향상 활동을 지원하기 위해서는 품질차원이나 데이터세트 등과같은 품질향상에 필요한 다양한 이슈를 관리자가 인식할 수 있도록 하기 위해서이다. (3) 데이터 웨어하우스 환경에서 데이터 품질 향상에 필요한 체계적이고 포괄적인 안목을 제공하기 위해서이다. 본 연구는 다음과 같은 단계로 수행하게 된다. 첫째, 데이터 웨어하우스의 개념과 데이터 웨어하우스의 구축단계 및 데이터 웨어하우스를 구성하는 프레임워크를 검토한다. 둘째, 데이터 웨어하우스 환경에서의 데이터 품질의 기준과 데이터 품질의 측정 및 데이터 품질의 향상 방안 등을 고찰한다. 셋째, 데이터 웨어하우스 환경에서 데이터 품질의 향상을 위한 개념적 프레임워크를 개발하기 위하여 데이터 웨어하우스 데이터 풀질 향상과 관련된 기업활동, 데이터 세트, 품질의 속성 및 차원 등을 정의한다. 마지막으로 데이터 웨어하우스 환경하에서 데이터 품질을 향상할 수 있는 3차원 구조의 개념적 프레임워크를 제안하며, 나아가 제안한 모형에 대하여 데이터 품질 향상을 위한 프로젝트 활동의 사례를 통하여 모형의 타당성을 개념적으로 설명한다.통하여 각각의 제품을 비교하였으며, 둘째 소프트웨어 종류별 평가로 제품을 응용소프트웨어, 응용개발도구, 시스템 소프트웨어로 분류하여 평균값으로 비교하였다. 셋째, 국내외 제품별 평가분석으로 전체 제품을 국내제품과 국외제품으로 분류하여 비교하였으며, 마지막으로 총괄분석을 통해 가중치를 적용하여 전 제품의 점수를 비교하였다. 여기에서는 각 제품의 평균점수에 대한 차이를 95%의 유의수준으로 T-Test를 실시하였다.uted to the society, and what the socioeconomic impacts are resulted from the program. It would be useful for the means of (ⅰ) fulfillment of public accountability to legitimate the program and to reveal the expenditure of pubic fund, and (ⅱ) managemental and strategical learning to give information necessary to improve the making. program and policy decision making, The objectives of the study are to develop the methodology of modeling the socioeconomic evaluation, and build up the practical socioeconomic evaluation model of the HAN projects including scientific and technological effects. Since the HAN projects cons

  • PDF

A Study on the Feasibility Evaluation of Overseas Wind Power Projects with RETScreen Software (RETScreen를 활용한 풍력발전사업의 투자 적절성 평가 사례 연구)

  • Lee, Ju-Su;Choi, Bong Seok;Lee, Hwa-Su;Jeon, Eui Chan
    • Journal of Climate Change Research
    • /
    • v.4 no.2
    • /
    • pp.105-114
    • /
    • 2013
  • Recently, foreign direct investment of Korea has increased significantly. Foreign direct investment is motivated by various reasons and renewable energy investments in foreign countries can be performed by many causes. Korean companies can enjoy the export of products, related EPC contracts, acquisition of the knowledge of the project management technique, pre-occupying effect of the market and profit itself. Wind power projects have biggest share in the investment amounts among the renewable energy business. So, in this study, one wind farm project was selected and supposed to be invested in China, USA, Germany and UK at the same time and the effect of electricity price, corporate income tax, inflation rate and interest rate of debt were analyzed. The result showed that investing in Germany is most profitable because of the highest electricity price and electricity price and debt interest rate are the most sensitive factors for IRR. This approach would be helpful to make decisions in investing foreign wind power projects.

A Study on the Optimal Site Selection by Constraint Mapping and Park Optimization for Offshore Wind Farm in the Southwest Coastal Area (서남해 연안 해상풍력 발전단지 지리적 적합지 선정 및 최적배치에 관한 연구)

  • Jung-Ho, Kim;Geon-Hwa, Ryu;Hong-Chul, Son;Young-Gon, Kim;Chae-Joo, Moon
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.17 no.6
    • /
    • pp.1145-1156
    • /
    • 2022
  • In order to effectively secure site suitability for the development of large-scale offshore wind farms, it is essential to minimize the environmental impact of development and analyze the conflicts of benefit between social, ecological, and economic core values. In addition, a preliminary review of site adequacy must be preceded in order not to collide with other used areas in the marine spatial plan. In addition, it is necessary to conduct local meteorological characteristics analysis including wind resources near Jeollanam-do area before project feasibility study. Therefore, wind resource analysis was performed using the observation data of the meteorological mast installed in Wangdeungnyeo near Anmado, Yeonggwang, and the optimal site was selected after excluding geographical constraints related to the location of the offshore wind farm. In addition, the annual energy production was calculated by deriving the optimal wind farm arrangement results suitable for the local wind resources characteristics based on WindSim SW, and it is intended to be used as basic research data for site discovery and selection of suitable sites for future offshore wind farm projects.

Construction Technology Research and Development Planning - In the Case of Real-time Construction Project Monitoring System Development - (건설 기술 연구 개발을 위한 기술 기획 - 적시 시공을 위한 시공 현장 모니터링 기술 사례를 기반으로 -)

  • Kim, Changyoon;Kim, Hyoungkwan;Kim, Changwan;Kim, Moon Kyum
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.6D
    • /
    • pp.849-857
    • /
    • 2008
  • Technology roadmapping is one of the widely used technology planning methodologies. Using a technology roadmap, the researchers can increase the possibility of the project success by systematic management of research contents, budgets, and commercialization strategies. Currently, Ministry of Land, Transport and Maritime Affairs has a plan to increase the research fund to improve the construction industry. As a result, the number of long term research projects with more than five years of research period, is increasing. This entails the need for a methodology for the systematic planning and management of research. However, the construction industry has the characteristics that the research results should ultimately be implemented in an outdoor environment. Through processes of diverse literature reviews, questionnaire-based survey, and pilot research, this paper presents a systematic procedure for the development of construction technology roadmaps, which can consider the unique nature of the construction industry. Based on the procedure, a technology roadmap for intelligent construction monitoring is also developed.