• Title/Summary/Keyword: 프로젝트 성과측정

Search Result 125, Processing Time 0.023 seconds

A Method to Build Daily Progress Management Model based on BIM Estimate Data in Construction Phase (BIM 기반의 시공단계 견적데이터를 활용한 일일 진도관리모델 구축 방안)

  • Jung, Jun-Ho;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.23-34
    • /
    • 2011
  • Reliable progress management at construction requires integrated information of cost and schedule, and information is used as a basis for project performance measurement. However, separate handling of cost and schedule information at construction projects makes objective measurement more difficult and decreases management productivity due to additional works for breaking down bill of quantities into corresponding activities. Recently, research related to BIM addresses issues on effective progress management based on BIM with incorporation of daily progress management. Therefore, the objective of this paper is to propose information model for daily progress rate and budgeted cost of work performed by utilizing BTM-based quantity and location information.

The Relationship Between The Type of R&D Investment and a Firm's Performance (연구개발 투자성향과 기업성과의 관계)

  • Kim, Kyung-Ihl
    • Journal of Convergence for Information Technology
    • /
    • v.8 no.4
    • /
    • pp.213-217
    • /
    • 2018
  • The relationship between R&D investment and subsequent change has been mostly confirmed under additional influencing factors, with the form of innovation investments. The research assumes that a firm adjusts its R&D spending in accordance to performance feedback. It is argued that an increased fluctuation of a firm's R&D expense is related to a reduced performance. This hypothesis is tested on SME in World class 300 Projet by SMBA. Using panel data models, instability measured by SD is related to performance levels measured by ROA, ROE & PM. Results support the proposed relationship between R&D expense instability and the subsequent performance. Although a causal link cannot be clearly established, the results indicate that firms with a lower performance have higher R&D investment fluctuations, possibly being more responsive to performance feedback.

Market Evaluation Study On The Impact Of Standard Performance Contract Programs (표준성과배분계약프로그램의 효과에 대한 시장 평가 연구 (3))

  • 전미 ESCO협회
    • The Magazine for Energy Service Companies
    • /
    • s.17
    • /
    • pp.56-67
    • /
    • 2002
  • 이 보고서에 명시되어야 할 주요 문제점 및 이슈를 파악하기 위한 연구의 일환으로, NAESO는 1999년 8월에 2일간의 워크숍을 실시했다. 이 워크숍에서 NAESCO는 에너지절약 전문기업(ESCOs) 및 공공사업체(utilities)의 대표자들과 캘리포니아 에너지 효율 위원회(CBEE)의 회원들을 초대하여, 업체 참가자 및 주요정책입안자들의 SPC 프로그램과 관련된 시장 경험을 검토하면서 SPC 프로그램에 관한 이들의 특정 우려사항 및 관심사항을 주제로 하여 논의하도록 하였다. 워크숍의 목적은 ''시장 전환(marekt transformation)''과 ''자원 획득(resource acquisition)''이라는 조정 목표의 관점에서 SPC 프로그램 이행에 관련된 우려사항을 주요 쟁점으로 하여 이에 집중하는 것이었다. 이 워크숍은 비 거주시설의 SPC 프로그램에 관련된 특정 우려사항을 주제로 설정하였으며, 토론을 통하여, 프로젝트 스폰서의 임무, SPC 운영자의 임무, 가격 설정, 적격 프로젝트, 및 측정 및 검증에 걸친 5가지 부분의 주요 우려사항에 관하여 결론을 돌출하였다. 다음은 이 5가지 부분의 우려사항 각각에 관한 워크숍 참가자들의 결론을 기술한 내용이다.

  • PDF

Integrated Planning Process Implementation Method Based on the Cost, Schedule, and Technical Performance (비용, 일정 및 기술적 성과를 고려한 통합 계획수립 프로세스 구현 방안)

  • You, Yi-Ju;Park, Young-Won
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.10 no.3
    • /
    • pp.100-108
    • /
    • 2007
  • The purpose of the research is to propose an integrated project planning process and its implementation method. Although there is increasing interest in the application of the Earned Value Management(EVM) method in the project management area, the progress and maturity of the technical performance have not been included in assessing the Earned Value. The main concept of the planning process is to use cost, schedule, as well as the technical performance in the assessment of the Earned Value Management for Military R&D project management practices. The resulting process can enhance the efficiency of the project work by eliminating the currently duplicated activities between traditional project planning process and the newly implemented Earned Value Management process and by shortening the early planning process duration of projects adopting EVM practices.

Development Acceptable Risk Model for International Construction Projects - Focusing on Small and Medium Construction Companies - (해외 건설 다수 프로젝트 관리를 위한 허용리스크 도출 - 중소·중견 건설기업 관점에서 -)

  • Hwang, Geunouk;Park, Chan Young;Jang, Woosiki;Han, Seung Heon;Kang, Sin Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.90-97
    • /
    • 2016
  • Since Korean construction firms have steadily advanced into the international market, small and medium construction companies (SMCCs) have also advanced in such market. SMCCs's recent trend have clearly shown the changes of contract types from single subcontractor projects to multiple general contracting projects. However, among those multiple projects performed by SMCCs, 1 out of 3 projects were deficit projects that impact the overall pe rformance of the firm. To increase such performance, risk management for in international construction must be managed at the enterprise level for SMCCs. This research aims to create a multiple project management model for SMCCS that employs the concept of acceptable risk to assess the limit risk level for corporation to acceptable. Using the accumulated data from previous survey and International Construction Association of Korea (ICAK), integrated risk of each firm and their profitability of each project are analyzed. Through the analysis, each firm's acceptable risk level is derived. Through the two research steps, acceptable risk algorithm was developed based on corporate integrated risk and profit correlation. To prove the acceptable algorithm relevance, financial statement analysis of 3 corporation was derived that level of acceptable risk and financial statement were available. Through the approach, this research allows the firms to analyze the firm's capability and find projects that suits the firm's situation and capability.

Collection and Utilization of the Construction Productivity Data and the Influence Factors Using Information Technology (IT 기술 기반의 건설 생산성 정보 및 영향요인의 수집 및 활용)

  • Lee, Hyun-Jung;Oh, Se-Wook;Kim, Young-Suk;Kim, Yae-Sang;Kim, Sang-Bun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.548-553
    • /
    • 2006
  • Activity-based productivity data can be used as an significant reference in many areas of project management such as performance evaluation and project planning. However, the existence of various factors influencing construction productivity makes it difficult to collect and analyze the productivity data. In the most of the domestic construction sites, there is no systematic method to collect and analyze the productivity data along with information on influencing factors; it is common to heavily rely on experience and intuition of field managers when dealing with construction productivity data. Therefore it is necessary to develop a management system for collecting and utilizing the productivity data as well as the factors influencing construction productivity. The main objective of this research is to define the construction productivity and its influencing factors at the activity level. In addition, methodologies on how to analyze the productivity data and to estimate productivity of future projects are proposed.

  • PDF

A Predictive Model for Software Development Team Size and Duration Based on Function Point (기능점수 기반 소프트웨어 개발팀 규모와 개발기간 예측 모델)

  • Park, Seok-Gyu;Lee, Sang-Un
    • The KIPS Transactions:PartD
    • /
    • v.10D no.7
    • /
    • pp.1127-1136
    • /
    • 2003
  • Estimation of software project cost, effort and duration in the early stage of software development cycle is a difficult and key problem in software engineering. Most of models estimate the development effort using the function point that is measured from the requirement specification. This paper presents optimal team size and duration prediction based on function point in order to provide information that can be used as a guide in selecting the most Practical and productive team size for a software development project. We introduce to productive metrics and cost for decision criteria of ideal team size and duration. The experimental is based on the analysis of 300 development and enhancement software project data. These data sets are divide in two subgroups. One is a development project; the other is a maintenance project. As a result of evaluation by productivity and cost measured criteria in two subgroups, we come to the conclusion that the most successful projects has small teams and minimum duration. Also, I proposed that predictive model for team sire and duration according to function point size based on experimental results. The presented models gives a criteria for necessary team site and duration according to the software size.

Project Based Learning for University-Led Urban Regeneration: A Case Study on the Strategic Communication Campaign Class for the Sinchon Regeneration Project (공간문화콘텐츠 창제작 프로젝트 기반 수업 :신촌 도시재생 커뮤니케이션 캠페인 PBL 효과분석을 중심으로)

  • Yoo, Seungchul;Jung, Kwanghee;Ryoo, Jeongmin
    • The Journal of the Convergence on Culture Technology
    • /
    • v.6 no.2
    • /
    • pp.207-215
    • /
    • 2020
  • The purpose of this study is to examine the effectiveness of PBL in a college AD/PR class. This class was run under the theme of 'Sinchon Regeneration Project' in the 'Seodaemun-gu & University Collaborative Project Program'. As a result of the pre-post surveys, the authors found a significant increase in the place attachment to Sinchon, which was considered as a critical variable in this program. This research is an important study with high practicality in the area of cultural content production education PBL. The PBL teaching method can contribute to enhancing the class satisfaction and strengthening the competitiveness of students in cultural content related majors.

The Study on the Significance of Social Problem-solving Living Lab Project Class in University and Development of an Toolkit to derive Effective Problem Definition (사회문제 해결형 대학 리빙랩 프로젝트 수업의 의의와 효과적인 문제 정의 도출을 위한 활용 툴킷 개발)

  • Park, Hyung-Woong
    • Journal of Digital Convergence
    • /
    • v.19 no.10
    • /
    • pp.15-20
    • /
    • 2021
  • The crisis of university must be overcome by emphasizing the acquisition and use of knowledge for students to participate in and solve contemporary and diverse social/regional problems through educational method innovation. University classes should be a way of contributing to solving human problems, the UN's Sustainable Development Goals(SDGs) and various issues in the community. This study focused on project-based learning to cultivate socially engaged and problem-solving talents. In addition, a problem definition toolkit model was produced and tested to improve problem solving ability. Through follow-up research, I plan to develop a performance measurement model corresponding to the field application-improvement-feedback of Living Lab project classes, and suggest a method that universities can easily apply to the existing curriculum.

A Study on the Framework of Cutover Decision Making on Large-scale IS Development Projects: A Core Banking Development Case of D Bank (대규모 정보시스템 개발 프로젝트의 컷오버 의사결정 프레임워크에 관한 연구: D은행 코어뱅킹 시스템 구축 사례를 중심으로)

  • Jeong, Cheon-Su;Ahn, Hyun-Chul;Jeong, Seung-Ryul
    • Information Systems Review
    • /
    • v.14 no.1
    • /
    • pp.1-19
    • /
    • 2012
  • A large-scale IS development project takes a long time, thus its project manager needs to be more careful on risk management. In particular, appropriate cutover decision making is critical in large-scale IS development projects because the opening of the large-scale IS significantly impacts the organization. Regardless of its importance, cutover decision making in conventional IS development projects has been done in a quite simple way. Conventional cutover decisions have been made by considering just whether the new IS operates or not from the system, application, and data implementation perspectives. However, this approach may lead to unsatisfactory performance or system failure in complex large-scale IS development. Under this background, we propose a new framework for cutover decision making on large-scale IS projects. To validate the applicability, we applied the framework to a core banking system development case. The case study shows that our framework is effective in proper cutover decision making.

  • PDF