Yeom, Dong Jun;Lee, Mi Young;Oh, Se Wook;Han, Seung Woo;Kim, Young Suk
Korean Journal of Construction Engineering and Management
/
v.16
no.6
/
pp.63-72
/
2015
The importance of the appropriate use and procurement of Safety and Health Expense has been increasing along with the recent increase of construction projects in height, size and complexity. However, the current standards for deducting the Safety and Health Expense have shown limitations in applying the properties and environment of the construction project due to its Safety and Health Expense Rate's classification method. Therefore, the purpose of this study is to develop a prediction model for the Safety and Health Expense that enables the consideration of different environment and properties of construction projects. The study uses multiple regression analysis to analyze the Safety and Health Expense of Ordinary(A) of less than 0.5 billion WON. The research results have shown that the use of multiple regression analysis reduces the error rate to 4.38% which the current standard calculation method have shown 18.48%. Therefore, the use of the suggested model provides reliable Safety and Health Expense prediction values that considers the properties of the project. It is expected that the results of this study contributes to the effective safety management by providing the appropriate amount of Safety and Health Expense to the project. In this study, only projects of less than 5 billion WON have been considered in the analysis. Therefore, more data is required for future studies to suggest an overall Safety and Health Expense predict ion model that covers the whole construction industry.
KSCE Journal of Civil and Environmental Engineering Research
/
v.34
no.5
/
pp.1589-1597
/
2014
For several decades, economic growth has achieved in the aspect of productivity and effectiveness not environmental friendly. As a result, global warming is a major agenda to solve. Therefore, global effort to sustainable development has been adopted like UNFCCC and Kyoto protocol that aimed to reduce greenhouse gas. However, the construction industry has only focused on applying techniques for using less energy sources not monitoring sustainable construction and development. Therefore, this study developed a tool for monitoring greenhouse gas emissions in construction industry. The proposed system evaluates and estimates BAU (Business as usual) for each phase of a construction project. For this purpose, analyzed the greenhouse gas emission factors coincide to life cycle of a construction project. The scope of monitoring is determined according to data availability and emission factor. Then, the system framework is developed and the calculation logic is proposed the system features provide comparison between the emission estimates for eco-friendly design and the actual emission of construction and operation phases. The system would be utilized as a tool for supporting to green construction realization and green construction performance evaluation.
The software defects that are not found in the course of a project frequently appear during the conduct of the maintenance procedure after the complete development of the software. As the frequency of surfacing of defects during the maintenance procedure increases, the cost likewise increases, and the quality and customer reliability decreases. The defect rate will go down only if cause analysis and process improvement are constantly performed. This study embodies the defect tracking system (DTS) by considering the Pareto principle: that most defects are repetitions of defects that have previously occurred. Based on the records of previously occurring defects found during the conduct of a maintenance procedure, DTS tracks the causes of the software defects and provides the developer, operator, and maintenance engineer with the basic data for the improvement of the software concerned so that the defect will no longer be manifested or repeated. The basic function of DTS is to analyze the defect type, provide the measurement index for it, and aggregate the program defect type. Doing these will pave the way for the full correction of all the defects of a software as it will enable the defect correction team to check the measured defect type. When DTS was applied in the software configuration management system of the W company, around 65% of all its software defects were corrected.
Today, the phase of modem war is very different from past war. That is, the winning of war depends on the ability to obtain information and high technology. The purposes of this research are to propose an effective R&D governance model in national defense sector and to present R&D strategy for obtaining core national defense technology. As a part of collaborative innovation, the strategy to exchange R&D results actively between the defense sector and the private sector will be discussed. The main contribution of this research is dearly defining the concept of R&D governance in national defense sector and applying it to an actual case. The national defense R&D governance model proposed in this paper is based on the characteristics of national defense R&D which are different from other industries. The analysis of business success factors for national defense R&D through the T-50 case study is presented in detail. The T-50 case study reveals the importance of strategic intent, core technology knowledge base, organizational structure, and project management.
Kim, Hae-Gon;Park, Sung-Chul;Hong, Tae-Hoon;Hyun, Chang-Taek;Koo, Kyo-Jin
Korean Journal of Construction Engineering and Management
/
v.8
no.4
/
pp.110-118
/
2007
For deciding the owner's budget of the building construction in the predesign stage, the probabilistic methodologies for estimating the cost are often studied, however these parameter-based conceptual estimating methodology has limitation of applying it to the practical business because it hardly can link the design decision-making and the cost estimating and control. Besides if the result of detail estimating after detail design is over the budget, locally and arbitrarily control the level of interior design and fix the design. This research proposed the prototype-based cost estimating model for building interior construction which leads to estimate the interior cost easily linking with design decision-making and supports to evaluate the design alternatives in the schematic design and the design development stage for office buildings. The model divides the building on the design process by Element Breakdown Structure and presents the design alternative by selecting the elements of each room from the database accumulated the historical office buildings' prototypes and estimates the cost. The 2 case studies presented to validate the effectiveness of as the linking tool integrating the design and construction data and applicability to the practical design on the presented prototype-based model.
Korean Journal of Construction Engineering and Management
/
v.22
no.3
/
pp.52-60
/
2021
Due to the significant size of overseas construction projects, the cost overrun has enormous impacts on the financial status of construction companies. The managers' appropriate perception and identification of key risk factors in the construction phase notably affect the performance of projects. However, the actual impacts of risk factors and local manager' s perception of them could be deviated. For this reason, we aim to compare the performance of actual cases and general opinions of responsible practitioners in terms of risk factors relevant to cost overruns in order to present a practical strategy for risk management. Firstly, factors classified from literature review were used to simulate 290 cost overruns data sets from 20 cases by introducing Monte-Carlo Simulation and were ranked by standardized coefficients through multiple regression analysis. Secondly, a survey was conducted against 42 local managers to rank their perception of impact on cost overrun with identical factors by using Stepwise Weight Assessment Ratio Analysis (SWARA). Comparison results show that conflicts such as 'conflict with subcontractors' and 'conflict with the local community' have caused excessive cost overrun. However, managers' perception of these as less significant than the actual influences and consider other risks such as 'material price fluctuation' and 'construction quality errors', as relatively serious. Therefore, education for local managers on conflict risks needs to be presented.
Journal of Korean Library and Information Science Society
/
v.54
no.1
/
pp.143-165
/
2023
This study aims to propose a scaffolding strategy that can be applied to the information search process by using Kuhlthau's ISP model, which presented a design and implementation strategy for the mediation role in the learning process. To this end, the relevant literature was reviewed to categorize scaffolding strategies, and impressions were collected from the students surveys after providing 150 middle school students in the Daejeon area with the project class to which the scaffolding strategy based on the ISP model was applied. The collected data were processed into a form suitable for analysis through data preprocessing for word frequencies to be extracted, and topic analysis was performed using STM (Structural Topic Modeling). First, after determining the optimal number of topics and extracting topics for each stage of the ISP model, the extracted topics were classified into three types: cognitive domain-macro perspective, cognitive domain-micro perspective, and emotional domain perspective. In this process, we focused on cognitive verbs and emotional verbs among words extracted through text mining, and presented a scaffolding strategy model related to each topic by reviewing representative document cases. Based on the results of this study, if an appropriate scaffolding strategy is provided at the ISP model stage, a positive effect on learners' self-directed task solving can be expected.
Korean Journal of Construction Engineering and Management
/
v.12
no.6
/
pp.65-78
/
2011
Construction business, which is complex and long-term business, requires accurate estimation and verification in construction costs and payment procedure from project planning to the completion of construction phase. And more importantly, it is necessary to investigate and determine the risk factors related to construction costs during the entire process including design planning, construction drawings, and quantity calculating. But, currently, it is not seem to be adequate to cope with the risk and increased construction costs against the operational budget in terms of actual costs when screening and estimating the bidding cost of public apartment. Therefore, this study selected and analyzed 40 sites' report of construction completion account from 2004 to 2010 focused on the adequacy on the modification of contract and design planning and on the complication of the budget in the beginning of the project. This study deducted various risk causes and results by analyzing actual costs according to year, architectural area, region, construction cost and sale/lease classification. We could find out construction risk according to annual variation of government policy and economy, and also deducted risk items by construction characteristic according to region and architectural area. Study result, we first found out the problems of lowest price award system according to the construction costs. The weight of the cost increase risk was analyzed that subcontract and material costs are very high. Roof and tile work were analyzed highly in subcontract cost risk and reinforcing bar and cement were analyzed highly in material cost risk, among direct construction cost. Finally, this study results could be used in comparing the categories of the construction costs made by specific construction process, belonging to the construction costs, with the operational budget made in the beginning of the project that can enable to grasp unpredictable risks over the construction costs and making quantitative analysis for it through analyzing the range of fluctuation and variations led by the fluctuations in the actual construction costs.
Korean Journal of Construction Engineering and Management
/
v.17
no.2
/
pp.70-79
/
2016
The current remodeling cost estimation process is not only dependent on the historical data of new building construction, but it also has a poor linkage with risk-based estimation approach. As such, there is a high risk of falling short of initial budget. To overcome this, a risk-based estimation approach is necessary by providing a probabilistic estimation in consideration of the potential risk factors in conducting the remodeling projects. In addition, the decision-making process should be linked with the risk-based estimation results in stead of intuitive and/or experience-based estimation. This study provides a probabilistic estimation process for residential remodeling projects by developing a detailed methodology in which a step-by-step approach can be achieved. The new proposed estimation approach can help in decision-making for remodeling projects in terms of whether to proceed or not, by effectively reflecting the potential risk factors in the early stage of the project. In addition, the study can enhance the reliability of the estimation results by developing a sustainable estimation process model where a risk-based evaluation can be accomplished by setting up the cost-risk relationship database structure.
Ji, Sae-Hyun;Park, Moon-Seo;Lee, Hyun-Soo;Seong, Ki-Hoon;Yoon, You-Sang
Korean Journal of Construction Engineering and Management
/
v.9
no.6
/
pp.235-243
/
2008
Construction projects have unique characteristics that these may be carried out by contractors thus, cost should be estimated before execution. The importance of cost estimation and cost check has become increasingly emphasized in all phases of construction project that would be performed numerously. It is needed that owner have to estimate reasonable budget, and contractor should predict the bid price. However, there are lack of standard cost estimation method before quantity takeoff, cost analysis method, and cost database thus, the method of area cost, such as square foot method, is as used as ever in Korea. Therefore, this research suggested standard cost database structure CUBE, and analysis method of item quantity per one household categorized by area type. Whereafter, database of all item quantity of finish work has been built with 90 building cost data, and validated it's availability. In this respect, the suggested method and the findings from this research are expected to help enhancing the efficiency and productivity of cost estimation in Korea.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.