• 제목/요약/키워드: 표준계약

검색결과 192건 처리시간 0.022초

Study on Problems and Its Improvements of Legislation for Shop Key Money (상가권리금 법제화의 문제점과 개선방안 연구)

  • No, Han-Jang
    • The Journal of the Korea Contents Association
    • /
    • 제15권11호
    • /
    • pp.410-421
    • /
    • 2015
  • The purpose of this study is to review the contents of the legislation(2015.5.12.) for shop key money concretely and to find an effective way in making an improvement of practical protection in the process of tenant's shop key money collection. From this point of view, this study tries to make some legislative suggestions as follows. First of all, the code of conflicting definition between 'shop key money' and 'shop key money contract' in the amended Commercial Building Lease Protection Act need to be harmonized with each other because they are likely to face potential problems in the protection of tenant's shop key money collction as well as risks for confusion. In the second place, it requires to strengthen the protection of tenant's shop key money collection by approval of direct opposing power of shop key money itself on condition that it satisfies a certain prerequisites. In addition, the ambiguous codes related to the landlord's disturbance should be distinctly arranged and the distribution principle of demonstration about landlord's disturbance on tenant's shop key money collection also should be made clear. Finally, the standard level of shop key money by region, business district, and category of business should be set and announced by Ministry of Land and Transport.

Changes in the Training Conditions of Residents by Enforcement of Medical Residents Act (전공의법 시행에 따른 전공의 수련환경 변화)

  • Oh, Su-Hyun;Kim, Jin-Suk
    • Journal of Digital Convergence
    • /
    • 제17권12호
    • /
    • pp.427-434
    • /
    • 2019
  • The Medical Residents Act was enacted in December 2016 to protect the rights of residents, and to ensuring the safety of patients, and nurturing good medical human resources. This study analyzed the changes of training conditions according to the enforcement of The Medical Residents Act by comparing the results of two surveys conducted in 2015(1,793 Residents) and 2017(1,768 Residents). As a result, Residents worked over 80 hours per week on average('15=92.4h, '17=87.3h) and they worked twice as many times as 36 hours('15=89.4h, '17=70.1h). Female residents' leave before and after childbirth('15=78.5day, '17=82.2day), Preparation of Standard training contract('15=19.3%, '17=40.8%), Delivery of training contract('15=12.4%, '17=36.1%) did not comply with the regulations. The training conditions of the residents is directly related to the safety of patients and the public's health. National support is needed for the support of substitute workforces, fair training evaluation conditions and incentives based on the evaluation results, labor costs for residents and supervising medical specialists, and the cost of making training programs.

Development of an Algorithm for Automatic Quantity Take-off of Slab Rebar (슬래브 철근 물량 산출 자동화 알고리즘 개발)

  • Kim, Suhwan;Kim, Sunkuk;Suh, Sangwook;Kim, Sangchul
    • Korean Journal of Construction Engineering and Management
    • /
    • 제24권5호
    • /
    • pp.52-62
    • /
    • 2023
  • The objective of this study is to propose an automated algorithm for precise cutting length of slab rebar complying with regulations such as anchorage length, standard hooks, and lapping length. This algorithm aims to improve the traditional manual quantity take-off process typically outsourced by external contractors. By providing accurate rebar quantity data at BBS(Bar Bending Schedule) level from the bidding phase, uncertainty in quantity take-off can be eliminated and reliance on out-sourcing reduced. In addition, the algorithm allows for early determination of precise quantities, enabling construction firms to preapre competitive and optimized bids, leading to increased profit margins during contract negotiations. The proposed algorithm not only streamlines redundant tasks across various processes, including estimating, budgeting, and BBS generation but also offers flexibility in handling post-contract structural drawing changes. In particular, the proposed algorithm, when combined with BIM, can solve the technical problems of using BIM in the early phases of construction, and the algorithm's formulas and shape codes that built as REVIT-based family files, can help saving time and manpower.

Development of an Operation Model for Technical Proposal-Based Tender of Public Construction Projects (공공건설공사의 기술제안형 입찰 운영모델 개발)

  • Yu, Il-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • 제9권2호
    • /
    • pp.136-145
    • /
    • 2008
  • Recently the Ministry of Finance and Economy of Korea launched two new project delivery systems called "Best Value Contract (Design-Bid-Build)" and "Bridging Contract (Design-Build)" in October of 2007 by revising enforcement ordinances of "Act on Contracts to Which the State is a Party". These project delivery systems require the bidders to submit technical proposal adjusted to the project characteristics and objectives for selecting the contractor by evaluating technical proposals. This research aimed to suggest guideline to effectively operate the project delivery systems described above. To reach the goal of the research, the framework of the operation model was developed, which includes the four categories: the standard bidding process, the technical proposal requirements, the technical proposal evaluation criteria, and the award methods. The contents of the four categories above were fulfilled throughout conferring with the advisory experts. In particular, the award methods, which are the important decision-making factor in the perspective of the owner, consist of four types: Low Bid-Fully Qualified, Weighted Criteria, Adjusted Bid, and Adjusted Score. The quantitative features and application criteria of these four types of award methods were suggested throughout the simulation using the virtual case.

Improving Personal Data Protection in IoT Environments (사물인터넷(IoT) 환경에서 개인정보보호 강화를 위한 제도 개선 방안)

  • Lee, Ae Ri;Son, Soomin;Kim, Hyun Jin;Kim, Beomsoo
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • 제26권4호
    • /
    • pp.995-1012
    • /
    • 2016
  • In Internet of Things (IoT) environments, devices or sensors everywhere can automatically collect data without the individual awareness, further combine and share data using ubiquitous network, and thus the development of IoT raises new challenges in respect of personal data protection and privacy. This study aims to identify main issues related to data protection in the IoT and propose adequate measures. We analyzed the types of personal data controllers and processors in IoT and figured out the issues regarding the processing of personal data and the rights to privacy of data subject. Accordingly, we suggested the institutional ways (e.g., establishment of user-friendly notice and flexible consent system, re-identification risk monitoring system, data protection in cross-border transfer, and user education) to improve the situation of personal data protection in IoT and finally proposed the improvement tasks to carry out first based on the degree of urgency and importance.

A Study on the Improvement of Specification in connection with Construction Lessons Learned Database (건설공사 지식데이터베이스 연계를 통한 시방서 개선방안)

  • Song Jae-Young;Lee Tai-Sik;Choi Jae-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.511-514
    • /
    • 2002
  • Nowadays, domestic construction companies make an effort to share knowledge and experience accumulated while conducting a project. One way of improving knowledge sharing is to develop specifications which are linked to the expert's knowledge and experience based on the specification classification. Therefore, the purpose of this paper is to review the current domestic specification system and develop the specification linked to the construction lessons learned database. It is expected that the proposed specification system will support the decision making process by effectively providing the knowledge and solution.

  • PDF

A Study on the Application of Load Capacity by Unit Household and Analysis of Maximum Utilization Factor of Transformer with respect to Power Consumption Characteristics in the Lease Apartment (임대아파트의 전력소비특성을 고려한 변압기최대이용률 분석과 단위세대의 부하용량 적용 개선에 관한 연구)

  • Seo, Seung-Kwan;Kim, Se-Dong;Na, Chae-Dong;Oh, Yong-Taek
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • 제24권2호
    • /
    • pp.127-132
    • /
    • 2010
  • The standards of demand, diversity and load density are necessary to create the design of a transformer capacity that is seldom presented in terms for academic study. At the moment, both legal and institutional standards for such a transformer are insufficient both at home and abroad. The works described in this thesis strongly support more reasonable standards for calculating transformer capacity by correlating the analysis between the maximum utilization factors of a given transformer with those of a transformer capacity whose power consumption has been investigated within a lease apartment. In this dissertation, it is necessary to analyze the key features and general trend from the investigated data. It made an analysis of the feature parameters, such as average, standard deviation, median, maximum, minimun and thus it was carried by the linear and nonlinear regression analysis.

A Study on Consideration factors for Selection of Institution, When Arbitration Clause Inserted in International Commercial Contracts (국제상사계약(國際商事契約)에서 중재조항(仲裁條項) 삽입시 중재기관 선택에 따른 고려사항)

  • Oh, Won-Suk;Jeong, Hee-Jin
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • 제55권
    • /
    • pp.63-93
    • /
    • 2012
  • The purpose of this paper is to examine the consideration factors, from both parties' perspective, to select the most appropriate arbitral institution when they inset an arbitration clause in their contract. Accordingly, the author analyzed the advantages of institutional arbitration compared to non-institutional arbitration. The typical advantages of institutional arbitration would include: $\bullet$ Benefits of using an established set of rules $\bullet$ Services provided by the institution $\bullet$ Low risks of obstruction $\bullet$ Enhancement of the possibilities of enforcement $\bullet$ Forecast of the estimated cost $\bullet$ Specially useful for existing disputes Next, this author examined the consideration factors when selecting the institution in respect of the following factors: $\bullet$ Institution's arbitration rules $\bullet$ Institution's rule regarding the appointment of arbitrators $\bullet$ Ability of administrators of each institution $\bullet$ Reputation of the arbitral institution and the likability of enforceability of its award $\bullet$ Cost $\bullet$ Choice of the arbitral institution in relation to the choice of place of arbitration Finally, this author reviewed Model Arbitration Clause of major international or local Institutions, including ICC, AAA, LCIA, KCAB, CIETAC, ICSID and WIPO. Further examination was given to the selection of the numbers of the arbitral tribunal, the seat of arbitration and the language of arbitration, according to the designated articles in each institution's arbitration rules.

  • PDF

Knowledge-based company's technology innovation strategy and case analysis in semiconductor IP industry (반도체 IP 산업에서 지식기반 기업의 기술혁신 전략에 대한 사례연구)

  • Kim, Min-Sik
    • Journal of Korea Technology Innovation Society
    • /
    • 제15권3호
    • /
    • pp.500-532
    • /
    • 2012
  • This study analyzed the technology innovation strategies of knowledge-based companies in the semiconductor IP industry. The theoretical approaches of this study are to i) the creation, protection and utilization of knowledge and innovation, ii) value creation from innovation, iii) modularity, timing of market entry, and the emergence and competition of standard (dominant design). Based on the theoretical analysis, I presented exploratory research hypotheses. Ultimately, this study examined the proposed hypotheses by conducting case studies on the technology innovation strategy of two leading knowledge-based companies in the semiconductor IP industry: ARM and INTEL. First, knowledge-based companies entering in the early stage of the technology cycle select the vertically-integrated technology strategy because of lower access to complementary knowledge assets, and maintain the vertically-integrated technology strategy despite the environmental change-driven differentiation of industry's value chain. Second, knowledge-based companies entering in the later stage of the technology cycle prefer the contract-based technology strategy because of its increased accessibility to complementary knowledge assets, and choose a different path of innovation strategies depending on whether their asset has the feature of discontinuity or not.

  • PDF

Comparative Analysis on Unit Price based on Historical Cost Data Estimating for Large and Small-scale Civil Engineering Works (대·소규모 토목공사의 실적공사비 비교 분석)

  • Hong, Sung Ho;Shin, Juyeoul;Kim, Chang Hak;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • 제33권4호
    • /
    • pp.1707-1718
    • /
    • 2013
  • Historical cost data estimating system has been introduced since 2004 in the construction industry. Based on contract prices of past projects, this estimating system estimates construction cost according to work types. The Korea Institute of Construction Technology (KICT) announces the historical cost data twice a year annually. The unit price of a small construction project is higher than large construction project due to the increase on production cost per work unit, equipment and labor cost, etc. However, the historical cost data estimating system is applied to project estimation uniformly regardless the construction project's size. This study compared and analyzed the historical cost data of large and small construction project to indicate the problem of historical cost date estimating system. The study derived that the unit price of a small construction project is 21.8% higher than that of large construction project.