Jo, Myoung-Hwan;Kim, Nak-Seok;Cho, Gyu-Tae;Jin, Jung-Hoon
한국방재학회:학술대회논문집
/
2007.02a
/
pp.475-478
/
2007
The major distresses in asphalt concrete pavement are rutting and fatigue cracking. Once the distresses are observed on pavement surface, an appropriate rehabilitation method should be found. Usually, asphalt patching or overlay methods are used to improve the pavement performance. The research presents the fundamental study on effective longitudinal rehabilitation methods for asphalt concrete pavements. The rehabilitation method will be applied to rutting that is occurred asphalt Pavement surface course and longitudinal cracking or fatigue cracking with light to moderate distress levels.
Kim, Wan-Sang;Lee, Suck-Hong;Kwon, Mun-Hyun;Choi, Do-Sun
한국방재학회:학술대회논문집
/
2007.02a
/
pp.117-120
/
2007
The main purpose of this paper is to introduce the early traffic opening-capable continuous multi-layer asphalt pavement maintenance method using electric arc furnace slag aggregate and emulsified asphalt to the actual construction sites. As well known, the previous surface treatment method of emulsified asphalt mixture have various shortcomings such as long work-time, traffic congestions, plastic deformation and poor evenness. Thus, the proposed method has enabled tile early traffic opening by utilizing the optimized emulsified asphalt after consideration of the climate and road conditions in Korea. The application of the electric furnace slag with $6\;{\sim}\;18\;mm$ thickness is helpful to become a environment-friendly construction method. And also, it has been improved enough to accommodate night-time works of mechanized construction activities for wearing course and control course.
Water retaining pavement is a pavement to lower the surface temperature by using evaporation of the water that the pavement contains when the pavement is heated by the sun in the daytime. The objective of this study is to develop water retaining materials. In this study we evaluated the practical application of a sepiolite and a charcoal as a water retaining material. We produced dense grade asphalt pavement, porous asphalt pavement, semi-rigid Pavement, semi-rigid pavement included a charcoal and semi-rigid pavement included a sepiolite, and then tested surface temperature characteristics. The test result says that water retaining pavements using a sepiolite and a charcoal lower surface temperature more than $10^{\circ}C$ compared to dense grade asphalt pavement. We confirm the practical application of a sepiolite and a charcoal as a water retaining material according to the test results.
PURPOSES : This study focuses on conducting pavement rehabilitation for more deteriorated roads given a limited government budget. METHODS : Therefore, we apply a optimization programming model of the permutation algorithm used for rehabilitating more deteriorated pavement areas, which is subjected to the limited budget. RESULTS : The permutation algorithm was evaluated in terms of determining the maximized rehabilitation of deteriorated pavement areas, using the newly developed performance models such as fatigue cracking, rutting, international roughness index(IRI) through the surveying data from 2006 to 2012. When compared with a traditional model of the so-called worst-first sequence(WFS) method, the permutation algorithm worked better than the WFS method, resulting in covering more deteriorated pavement areas given the limited government budget. CONCLUSIONS : Through a case study, it could be concluded that the permutation algorithm provides more reliable results in terms of rehabilitating more deteriorated pavement areas given the limited budget.
Asphalt pavements have to perform under the conditions of heavily-loaded vehicles due to the industrialization and large temperature variance between the summer and the winter. Due to these factors, a characteristics change of early permanent deformation becomes a big issue, and to remedy this problem many research to use modified asphalt are being widely conducted. However, most of the modified asphalt is being paved after milling the surface course and applying tackcoating, and it is being used mostly for the repair and maintenance purpose rather than pavement of new national road. The purpose of this investigation is to obtain some fundamental data for the evaluation of the performance and long-term performance of the construction material mixtures by the laboratory test and field experiments. For the field experiment, 200m of two-lanes national road, that is being paved for the new national road under the direction of Pusan Regional Construction Management Office, was paved with SBS PMA and PSMA asphalt mixtures, which are an modified asphalt mixtures used for the surface course, on top of the base course paved with other modified asphalt mixtures. The remaining section of the new national road was paved with dense grade mixture. The laboratory tests assessed and analyzed the mixture characteristics by Marshall's stability test, strength tests and wheel-tracking test. On the basis of the evaluation result of the temperature control and roughness of the newly constructed road at the field experiment site, it is desired to evaluate and identify the most economic modified asphalt mixtures by long-term performance evaluation and LCC(Life Cycle Cost) analysis in order to apply the test result to the design of new road construction in the future.
Kim, Hyo-Sung;Nam, Jeong-Hee;Eum, Ju-Yong;Cho, Yoon-Ho
International Journal of Highway Engineering
/
v.11
no.1
/
pp.13-24
/
2009
This study developed a high strength and performance concrete pavement material with low shrinkage and reflection of sunlight. Based on the literature review, a new mix-design of applying flash ash to improve the strength and performance of the concrete as well as to reduce the dry shrinkage is suggested. In addition, adding black pigment to reduce the reflection and technique of applying OAG (Optimized Aggregate Gradation) is also included. The result of the laboratory experiment indicates that the brightness and the reflection, which depends on the ratio of black pigment addition, did not deviate from the normal range. When OAG is considered for the mix-design, the strength and performance of the concrete improved greatly. In addition, the mix-design using fly ash reduced the dry shrinkage of concrete and improved the resistance to the permeation of chloride ion. Furthermore, the mix-design, which uses fly ash (25% replacement) and black pigment (3% addition) with the application of OAG, is found to be the most effective mix to reduce the shrinkage and reflection as well as improving the strength and performance of the concrete. The result of an economic analysis indicates that the initial construction cost of this proposed mix is more expensive than that of normal concrete pavement material. However, it can be more economic in the long run because the normal concrete pavement material is likely to cost more due to higher probability of maintenance and repair and higher social cost due to traffic accident, etc.
At Otani University in Kyoto, Japan, there is a rubbed copy of Tripitaka Koreana, presumably printed in 1381. According to the postscript of the copy, written by Saek Lee himself, the rubbed copy was made at Haeinsa temple in 1381 and was kept at Sinluksa temple in Yeuju. The copy was delivered as a gift to Japan in 1414 and now is kept at the Library of Otani University. Although an approximate summary of the content of the copy was reported in the early 2000s after a basic survey, details of the copy, including the concrete format and packaging paper, are not known yet. In this paper a detailed survey of the copy is conducted on the 109 pages. The copy is divided into two parts: the wrapping and the inner pages. The wrapping paper is divided into yellow and brown colors depending on the material of the paper. The yellow colorwrapping paper was possibly made in 1381 at the time of the rubbed printing, and the brown wrapping paper was repaired after being moved to Japan. Using funds collected in February 1380, the copy of Gyeong(經), Yul(律), and Ron(論) chapters was printed in April 1381. Binding of the copy was completed in September, and the wrapping paper with the title in gold was made in October 1380. The box for keeping Buddhist scriptures was manufactured in November 1380. The copy was moved to Sinluksa temple in April 1382 and delivered to Japan in 1414. At Otani University, the copy is stored in separate rectangular boxes 32.1×25.3cm in size with a height of 23.6cm. The rectangular plate on the four sides is red in external color but black colorinside. The box for keeping Buddhist scriptures was probably made in 1381, but a partial repair was made later. Because of the difficulty of executing a detailed survey of the box for Buddhist scriptures, it is hard to find out its nation and period of production. We look forward to studying the copy as well as the box for Buddhist scriptures in future.
Journal of the Korean Institute of Traditional Landscape Architecture
/
v.37
no.2
/
pp.66-73
/
2019
The Royal Tomb of the Joseon Dynasty, which was listed as a UNESCO World Heritage site in 2009, is a cultural resource recognized for its 'outstanding universal value' around the world. The royal tomb of Joseon has been managed with an emphasis on the preservation of cultural assets since it was designated as a historical site in the 1970s, but it has received many visitors as a valuable historical and cultural resource and haven that connects the past and the present in today's bustling city. In order to investigate and analyze the current status of pavements in the royal palace in terms of quality and quantity, and to suggest the direction of improvement, this study conducted a complete survey of 53 royal palace viewing roads in 18 regions, and the results are as follows. First of all, problems are found in both the early Masato pavement of the creation, which was introduced with an emphasis on the preservation and protection of cultural assets, and the hardening pavement(KAP), which began to be used in the 1990s for the convenience of maintenance. In other words, the Masato pavement used to create a more environmentally friendly atmosphere of the Joseon royal tombs is showing a high percentage of use, but it lacks support for walking activities, such as the slippage of the pavement and water pooling during the rainy season or during the ice season. Also, hardening pavement introduced for convenience of maintenance, such as the movement of repair vehicles, is not functioning properly as it is damaged by physical deformation after construction. In addition, in awe zones such as parking lots, although the first image of the Joseon royal tombs is determined, the formation of the functional landscape centered on the carriageway does not harmonize with the traditional landscape, and, because of its lack of walking and environment-friendly features, there is a need for improvement, such as the experimental introduction of relevant pavement materials developed afterwards and continuous monitoring.
Lee, Yong Hyeon;Kim, Hyun Seok;Jung, Won Kyong;Oh, Han Jin;Kim, Hyung Bae
International Journal of Highway Engineering
/
v.19
no.5
/
pp.33-42
/
2017
PURPOSES : The purpose of this study is to suggest the construction and quality control method for the re-repair of a deteriorated partial depth repair for sections of Portland cement concrete pavement. METHODS : An experimental construction was conducted to extend the repair width for removing an existing repair section. A removal method was used to ensure early performance for a deteriorated partial depth repair section. Bond strength and split tensile strength were measured at the near vertical interface layer between the existing pavement and repair material. The area was analyzed for various conditions such as the extended repair area and the removing method of the existing repair section. RESULTS : As a result of analysis of bond strength and split tensile strength, the bonding performance of a milling removed section was improved over a cutting and hand breaker removed section. The bond strength was analyzed to increase slightly as the extended repair width for removing the existing repair section increased. The split tensile strength did not show a clear relationship to an increased extended repair width of an existing removed repair section. CONCLUSIONS : The milling removal method should be applied in the removal of existing deteriorated partial depth repair sections. The extended repair width for a re-repair section should be wider than the existing partial depth repair with at least a 75-mm length and width for the bond strength and the split tensile strength.
Manure compost is a main product from animal wastes in Korea. Solid manure is usually treated by aerobic composting at manure composting facilities for land reinforcement. Agricultural use of manure compost as organic fertilizer resources, mainly manure compost, is now recommended in Korea. This study investigated the evaluation of durability about the manure composting machinery and structures which was controlled by aeration and periodic agitating. The questionnaire addressed three main topics as follows: operating practices, machinery and maintenance of the manure composting facilities are being operated. A total of the 22 manure composting facilities in an agricultural cooperative were surveyed. The results obtained in this survey were summarized as follow: The major causes of manure composting apparatus trouble were corrosion and wear, overloading and foreign matter etc. The highly trouble frequency of the agitator, packer and conveyor were chain, agitating blade and shaft, motor and screw vane, respectively. These analytical results can be used as basic information to establish the maintenance control methods and durability standard of manure composting facility.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.