• Title/Summary/Keyword: 투자타당성

Search Result 322, Processing Time 0.038 seconds

Cost-benefit analysis of public investment on aircraft design assurance infrastructure (중형항공기 설계검증·인프라구축과 인증기개발의 경제적 타당성 분석)

  • Yi, Jae-Kyung;Kim, Myeong-Kyun;Kim, Yong-Min;Lee, Tae-Hee;Kim, Do-Hyeon
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.38 no.9
    • /
    • pp.900-906
    • /
    • 2010
  • We analyse benefits and costs of investment on the assurance of aircraft design and development of related infrastructure. Although the discounted cash flow from the sales of aircrafts is found to be smaller than the amount of required investment, the net present value considering the effects of export increase, import substitution, and the accident cost reduction is very high. This justifies governmental investment, for the effects are not easily appropriated by private investors.

A study of real estate investment value and analytic technique -mainly by case study of real estate development projects- (부동산 투자가치와 사업타당성 분석기법 연구 -개발사업 사업타당성 분석 사례연구를 중심으로-)

  • Lee, Taek-Soo;Lee, Joo-Hyung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.12
    • /
    • pp.6128-6134
    • /
    • 2012
  • In so many real estate development projects, there were strong needs to have a powerful tool to check feasibility of those projects. But there were not enough tool and measure to cover risk of real estate development and construction. Therefore I tried to find a real tool to measure investment value of development properly and efficiently, by means of case studies of many real estate development projects. Finally I found a fact that no tools of investment value analysis are perfect and efficient to hedge all kinds of risks in projects. Especially NPV(Net Present Value) and IRR(Internal Rate of Return) were not sufficient by themselves to measure investment value. So I found out that MIRR(Modified IRR), XIRR(X-IRR), ARR(Average Rate of Return), PP(Payback Period) and so on, would be supplementaries of proper and efficient investment value analysis.

The future Progressing strategy of the private investment project of the construction corporations to prepare for the SOC market change. (SOC시장변화에 대비한 건설사의 민간투자사업 향후 추진전략)

  • 정철원;김원근;이성호;이주헌
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.67-72
    • /
    • 2004
  • 최근 건설산업은 공공 및 민간부문의 발주물량 감소가 가시화되고 있으며, 최저가입제에 의한 사업수익율 하락 추세는 향후 건설업 붕괴위기, 건설산업 사양산업화라는 비관적 견해가 떠돌 만큼 건설업 전반이 심각한 위기를 맞고 있다. 정부는 재정 부족으로 인하여 SOC사업의 축소조정이 불가피하지만 국가경제의 악영향 해소와 신속한 경쟁력 회복을 위해 SOC사업에 대한 투자확대와 푹소범위 최소화의 필요성을 인식하고 있으며, 이에 재정부족과 SOC 확충이라는 두가지 문제를 해격하기 위해 민간투자사업이 활성화되고 있는 실정이다. 현재, 정부에 의해 주도되고 있는 민간투자사업의 제도 및 법률의 개정방향은 피간 건설업체가 주도하던 민자사업에 대하여 연기금 및 금융권으로의 전환을 예고하고 있으나, 현실적으로 금융권이 자체적으로 SOC 사업에 대한 투자를 위한 사업 타당성 분석이 어려운 실정이므로 이에 대한 대안으로 SOC 민간투자사업에 대한 노하우를 축적한 건설업체의 SOC 민간투자사업 분야에 아웃소싱 개닐념 도입, 특화하여 효율성을 극대화 시킴으로써 사업의 안정성 확보와 동시에 투자 수익 실현을 통하여 SOC 민간투자 활성화에 견인차 역학을 할 수 있는 전문운영회사의 도입에 대하여 논하고자 한다.

  • PDF

A Feasibility Study of the Industrialization of Citrus's Functional Materials (감귤 기능성 물질 산업화 타당성 조사)

  • Ko, Seong-Bo
    • Proceedings of the KAIS Fall Conference
    • /
    • 2010.11b
    • /
    • pp.568-571
    • /
    • 2010
  • 본 연구의 목적은 감귤 기능성물질의 산업화 타당성 분석을 하는 것이다. 구체적인 경제성 분석방법은 순현가와 투자수익률(내부수익률)을 이용한 기본적인 경제성분석과 손익분기점분석, 그리고 주요변수들의 변화에 따른 순현가의 변화를 파악하기위한 민감도분석이고, 정책적 분석은 감귤기능성 물질산업화가 감귤산업 전체에 미치는 파급효과를 계량적, 정성적으로 분석하였다. 감귤 기능성물질의 산업화 타당성 분석결과에 따르면, 미숙과 감귤 2만톤과, 감귤박 2만톤을 처리한다고 가정했을 경우 감귤산업에 미치는 경제적 효과는 연간 5백억원으로 나타났다. 이러한 막대한 경제적 효과는 본 사업에 투자되는 전체비용 약 1백억원, 10년 사업기간을 가정하면 연간 10억원의 설비투자비로 그의 50배의 경제적 파급효과를 나타날 수 있기 때문에 감귤기능성물질의 산업화효과는 매우 큰 것으로 나타났다.

  • PDF

Study on Judgement and Improvement of R&D Overlap Analysis during National R&D Pre-feasibility Study : Analysis based on Survey Response of Pre-feasibility Studying Team (예비타당성조사 R&D 중복성 검토의 판단 및 개선 방안에 대한 연구 : 조사 담당자의 설문 응답 기반 분석)

  • Park, Chang-hyun
    • Proceedings of the Korea Technology Innovation Society Conference
    • /
    • 2017.11a
    • /
    • pp.535-546
    • /
    • 2017
  • 국가 R&D 사업에 대한 예비타당성조사 시 R&D 중복성에 대한 검토는 중복된 투자를 방지하여 재정 투자의 효율성을 높이는데 중요하다. 본 연구에서는 예비타당성조사 담당자들을 대상으로 중복성 검토에 대한 중요요인, 개선사항, 판단기준, 판단주체에 대한 설문조사 분석을 진행하였고, 외부 전문가 그룹의 인식차이와 비교하였다. 설문조사 결과에 대한 통계 분석을 통해 중복성 검토에서 가장 중요한 요인은 '중복성 판단기준, 시스템의 데이터베이스 및 검색 알고리즘'으로 확인되었고, 3가지 요인에 대한 개선이 중복성 검토를 개선하는데 가장 중요함을 확인하였다. 또한 다중회귀분석을 통해 주요 요인들이 중복성 검토결과의 정확성에 미치는 영향성을 분석하여 요인들의 유의성에 대해 확인하였다. 본 연구를 통해 예비타당성 조사 시 R&D 중복성에 대한 검토가 향후 어떤 방향으로 개선되어야하는지에 대해 시사점이 제시된다.

  • PDF

Risk Management Process through a Phase of $Economic{\cdot}Financial$ Feasibility Study (경제적${\cdot}$재무적 타당성분석 단계에서의 리스크 관리절차 연구)

  • Park Young-Min;Kim Soo-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.454-459
    • /
    • 2003
  • Feasibility study on large scale projects like an investment on infrastructure development is very important because it provides fundamental data which determine the total investment size and duration. However, previous feasibility studies have a few problems of ambiguous estimation standards, unsystematical estimation methods, and so on. Accordingly, this study intends to regulate tile problems on economic feasibility as well as financial feasibility study which have been considered more critical in recent time, subsequently presents a reform measure. Also, this study identifies predictable risks during the feasibility study, presents a scheme which lets investor and owner control the risk themselves through a process which uses theoretical and political management plans.

  • PDF

Study on Standard Framework for Analyzing Government R&D Program: the case of Preliminary Feasibility Study on R&D Program (국가연구개발사업의 사전 분석틀 표준화 연구: 연구개발 부문 예비타당성조사 표준지침을 중심으로)

  • Ahn, Sang-Jin;Kim, Hye-Won;Lee, Yoon Been
    • Journal of Korea Technology Innovation Society
    • /
    • v.16 no.1
    • /
    • pp.176-198
    • /
    • 2013
  • Preliminary feasibility study(PFS) was introduced in 1999 by financial authority to encourage a cautious approach to new large-scale public investment project. As it applied cost-benefit analysis as prime measure for decision-making, various issues have been arisen concerning feasibility analysis on R&D programs. This work is intended to suggest standard approaches to be established in PFS on R&D program as follows: 1. The issue questions can be induced in a standard way by 15 representative questions and their correlation with evaluation criteria. 2. The analyzing strategy can be standardized by establishing standards for classification of R&D effects and R&D logic analysis.

  • PDF

Evaluating Information Security Investment using TCO-based Security ROI (TCO기반 Security ROI를 활용한 정보보호 투자성과 평가방법)

  • Lee, Jong-Sun;Lee, Hee-Jo
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2007.05a
    • /
    • pp.1125-1128
    • /
    • 2007
  • 보안 취약성이 끊임없이 보고되고 있다. 이는 보안솔루션의 초기 효과수준을 유지하기 위해서는, 새로운 취약성이 보고되면 즉시 대처하는 지속적 관리활동이 필요함을 뜻한다. 한편 기업성과 개선을 위한 IT투자성과관리가 강조되는 가운데, 정보보호 솔루션 도입 시 재무적 타당성 증명이 요구되고 있다. 이를 위해 여러 형태의 ROSI(Security ROI)가 제시되었으나, 지속적 보호활동에 따른 관리비용이 중요하게 다루어져야 함에도 불구하고 비용에 대한 고려가 적고 효과산정에만 치우쳐, 경영자의 의사 결정을 지원하는 실제적인 재무 성과지표로 활용될 수 없었다. 이에 본 논문은 조직수준의 비용효과 최적화를 추구하는 정보보호 관리체계에 기반을 두어 효과를 산정하고, 비용 산정은 지속적 관리활동이라는 특징을 반영하여 TCO에 기반을 둔 개선된 ROSI를 제안한다. 또한, 제안한 ROSI를 활용한 보안솔루션 평가사례를 제시한다. 증명이 어려운 정보보호 분야 투자타당성 증명은 물론 보안솔루션 선택 시 실제적인 의사결정 판단근거로서 활용될 수 있다.

  • PDF

Role of Capital Expenditure in the Economic Evaluation of National R&D Investment Project for Cooperative Research of University-industry-research Institute: Cases of Woodchip Power Plant Construction (국가 R&D 산학연협동연구 투자계획안의 경제성 평가에서 자본적 지출의 역할: 목재칩을 이용한 발전소 건설의 경우를 중심으로)

  • YEO, Heejung
    • Journal of Korea Technology Innovation Society
    • /
    • v.18 no.4
    • /
    • pp.621-640
    • /
    • 2015
  • The aim of this study is to provide evidence of how a change in the process of calculating the economic valuation of a project can affect the decision regarding national R&D investment. The paper examines a R&D project of cooperative research program of university-industry-research institute for the construction of a woodchip power plant to explore the role of capital expenditure in the economic evaluation of an investment project. The paper finds that the simple introduction of capital expenditure in the profitability analysis affects the perspectives on the construction plan. The results of this study indicate that standardization of the calculation process that takes different characteristics of industries into account is needed in the preliminary feasibility study of national R&D projects.