A Study on the installation time and method of soundproofing facilities according to a Tunnel blasting work. (터널발파작업에 따른 방음시설의 설치시기와 방법에 대한 고찰.)

  • Won, Yeon-Ho;Son, Young-Bok;Jeong, Jai-Hyung
    • Proceedings of the KSEE Conference
    • /
    • 2006.10a
    • /
    • pp.119-140
    • /
    • 2006
  • The rock excavation work by doing blasting breaks the rock by using a shock pressure and gas pressure produced when explosive explodes and the shock wave by shock pressure propagated three-dimensionally from the exploding center is on the decrease notably to the distance, however, $0.5{\sim}20%$ of energy produced by blasting propagates into the ground outside a crack zone by the shape of an elastic wave, on the ground it appears as a ground vibration with a seismic amplitude and a seismic cycle, it is called a blasting vibration. on the other side, what propagated in the air is called a blasting sound. The blasting sound of both means the things which the shock sound within the range the audible frequency($20{\sim}20000Hz$) of the elastic wave in the air influences the response system of a human body, it doesn't harm physically to any structures but influences unreasonably a work accomplishment, such as a work discontinuance due to the outbreak of a public complaint by a mental pain, reduction of a blasting scale, etc.. So, this study is examined at about 20 sites on the installation time and method of soundproofing facilities for reduction of the sound accompanied with a tunnel blasting work.

  • PDF

A Review of In-Situ Characterization and Quality Control of EDZ During Construction of Final Disposal Facility for Spent Nuclear Fuel (사용후핵연료 최종처분장 건설과정에서의 굴착손상영역(EDZ)의 현장평가 방법 및 시공품질관리 체계에 관한 사례검토)

  • Kim, Hyung-Mok;Nam, Myung Jin;Park, Eui-Seob
    • Tunnel and Underground Space
    • /
    • v.32 no.2
    • /
    • pp.107-119
    • /
    • 2022
  • Excavation-Disturbed Zone (EDZ) is an important design factor in constructing final disposal facilities for spent nuclear fuel, since EDZ affects mechanical stability including a spacing between disposal holes, and the hydraulic properties within EDZ plays a significant role in estimating in-flow rate of groundwater as well as a subsequent corrosion rate of a canister. Thus, it is highly required to characterize in-situ EDZ with precision and control the EDZ occurrence while excavating disposal facilities and constructing relevant underground research facilities. In this report, we not only reviewed EDZ-related researches carried out in the ONKALO facility of Finland but also examined appropriate methods for field inspection and quality control of EDZ occurrence. From the review, GPR can be the most efficient method for in-situ characterization of EDZ since it does not demand drilling a borehole that may disturb a surrounding environment of caverns. And the EDZ occurrence was dominant at a cavern floor and it ranged from 0 to 70 cm. These can provide useful information in developing necessary EDZ-related regulations for domestic disposal facilities.

A Case Study about the Slope Collapse and Reinforcement Method on the Infinite Slope (무한사면에서의 사면붕괴와 보강대책 사례연구)

  • You Byung-Ok;Hong Jung-Pyo;Jun Jong-Hern;Lee Tae-Sun;Min Kyoung-Nam
    • Tunnel and Underground Space
    • /
    • v.16 no.2 s.61
    • /
    • pp.146-155
    • /
    • 2006
  • The target slope of this study, formed during the construction of highway, is the very high infinite slope where sliding began along the discontinuity. Although an attempt was made to stabilize the upper part of the slope by installing the rock anchors, large scale failure was occurred at the lower part if the reinforced area. Afterwards, subsequent failures were observed two times. To investigate the cause of the failure, residual shear strength was measured by performing the direct shear test of rock specimen of the site. The anchor design was based on the pull-out test. Considering the slope surface where the undulation was severe and the variation of strength was very large, buttressing was used to obtain the required anchoring capacity.

Field Measurements with the Construction of Cut and Cover Tunnel (복개 터널구조물의 현장 시공에 따른 계측 분석 사례)

  • 박시현;이석원;이규필;배규진;전오성;이종성
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.03a
    • /
    • pp.149-156
    • /
    • 2002
  • Field measurements were carried out in this study to investigate the behavior of cut and cover tunnel such as the distribution and the magnitude of the earth pressure during back fill process of the ground material. Three kinds of measuring instruments, such as the earth pressure load cell, the concrete strain gauge and the reinforcing bar meter of embedded type in concrete structure were installed and measured. Earth pressure load cells, installed after construction of the tunnel lining, measure the outside forces acting on the tunnel lining with radial directions. Three load cells were installed at the crown, the right and the left shoulder of the tunnel, respectively. Three sets of reinforcing bar meter were installed in the double reinforcements of the tunnel lining and their locations were the same with the position of the earth pressure load cells. Concrete strain gauge was installed only one site of the upper compressive part at the tunnel crown. Based on the measuring results in the field, the deformation and the earth pressure acting on the tunnel lining were investigated with the back fill process of the ground material. Considerations on the validity of the measuring results were paid. For the analysis of measurements, after dividing back fill process into three steps, various factors which affect on the behavior of tunnel lining were investigated at each step.

  • PDF

Monitoring Result of Rock Mass Behavior during Excavation of Deep Cavern (대심도 지하 공간 굴착시의 암반거동 - 일본 SUPER KAMIOKANDE의 사례 -)

  • Lee Hong-Gyu
    • Tunnel and Underground Space
    • /
    • v.16 no.1 s.60
    • /
    • pp.11-25
    • /
    • 2006
  • The world's largest nucleon decay experiment facility is constructed at a depth of approximately 1,000 meters, in the Kamio Mine, Japan. The excavated cavern is consisted of a cylinder of 42.4 m high and a semi elliptical dome of 15.2 m high, with a bottom diameter of 40 m. The total excavation volume is approximately $69,000\;m^3$. Because of the character as a large cavern excavation in deep underground, there is many unknown factors in rock mechanics. Based on the results of rock test and numerical analysis, the monitoring of rock mass behavior accompanying progress of construction was performed by various instruments installed in the rock mass surrounding the cavern. The monitoring data was used in the study of measures for cavern stability.

Estimation of Water Leak Rate in the Underground Oil Storage Cavern (지하 원유 저장공동에서의 누수량 산정에 대한 연구)

  • Shim, Hyun-Jin;Park, Tae-Jun;Jeong, Woo-Cheol;Kim, Ho-Yeong;Choi, Young-Tae
    • Tunnel and Underground Space
    • /
    • v.20 no.4
    • /
    • pp.233-240
    • /
    • 2010
  • Double Plug is constructed for preventing mixing of two different oils between two compartments in the underground oil storage cavern. And the gas and oil tightness of double plug is tested from the measurement of water leakage from double plug after the completion of double plug water filling. If water leakage is underestimated, it can increase construction cost and if water leakage is overestimated, it can increase operating cost. Therefore, optimum water leakage should be estimated to cut down the cost. In this study, hydraulic stability analysis was conducted to consider permeable properties of rock mass around double plugs and a water leak rate from double plug was estimated from the hydraulic stability analysis and case study. Finally, the reliability of estimation of water leak rate was proven by comparing estimated water leak rate with measured data.

Safety Evaluation Method for Ground Ammunition and Explosive Storage Facilities due to Underground Tunnel Blast (지하시설 굴착공사에 따른 탄약저장시설 안전성 평가방법 연구)

  • Park, Sangwoo;Kim, Kuk-Joo;Park, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.4
    • /
    • pp.331-339
    • /
    • 2019
  • Recently, expansion of urban and social infrastructures is planned to go through the transfer of military facilities or crossing the infrastructures via underground tunnels. However, when crossing facilities such as ammunition and explosive storages, a high level of safety assessment is required to prevent an accidental explosion of ground ammunition. In this study, a case study was conducted to evaluate the effect of blasting for the construction of tunnel on the ground ammunition facilities. The design section of Sinansan train operated by the Korea Railroad Authority with agreement of the Ministry of National Defense was selected. For the purpose of this study, the vibration velocity due to explosion was predicted by using GTS-NX, a numerical analysis program. Through literature review, it was confirmed that the vibration velocity of 0.2cm/sec can be a safety evaluation standard. These safety evaluation indicators and procedures used in this study can be utilized as an index of safety evaluation in the planning of social infrastructures that cross the ammunition facilities in the future.

A Study on Advance Rate under the Operating Conditions of EPB Shield TBM Based on TBM Operation Data (현장 굴진자료 분석에 의한 토압식 쉴드 TBM의 운전조건과 굴진속도 연구)

  • An, Man Sun;Lim, Kwang-Su;Kim, Kyong Ju
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.6D
    • /
    • pp.839-848
    • /
    • 2011
  • TBM (Tunnel Boring Machine) tunnel should be carry out with the adopted machine until the end of excavation because of impossibility of replacement or modification of machine. Observation of the face of the tunnel is difficult, especially in EPB(Earth Pressure Balance) shield TBM, predict changes in the ground condition with analyzing data, collected during the excavation, and it should be reflected in construction. Until recently, subjects of studies on TBM are mainly the determination of machine and the development of advance rate prediction model, according to the characteristics of ground which is the target of excavation. However, study focused on the estimation of ground conditions and the improvement in operational methods using excavation data of TBM equipment, the principal of the excavation, has been done not so much. This study examine the variances in advance rate depending on changes in operating conditions and evaluate the optimal operating conditions of adopt machine, using working data obtained from EPB shield TBM project. The result of this study is suggested as follows. First, cutter head RPM and total thrust force are biggest influences on advance rate, Second, it is recommended for proper advance rate that total thrust force is controlled while optimum cutter head RPM is kept, Third, according to the increasing trend of total thrust force, the changes in ground conditions can be predicted, the appropriate operating conditions can be determined.

Implementing Last Planner : Tunnel Construction Project (라스트 플래너 적용 사례연구 : 터널 프로젝트)

  • Kim, Yong-Woo;Jang, Jin-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.4 s.32
    • /
    • pp.146-153
    • /
    • 2006
  • The Last Planner(LP), of which the goal is to improve work-flow reliability, has recently been introduced in Korea. It is found that some contractors have made efforts on applying the Last Planner to their projects. However, they face difficulties for a variety of reasons. This paper presents the case study results on Korean heavy civil projects, along with descriptions of the ways that the Last Planner was applied, and how the work flow reliability was improved. It also discusses the prerequisites and barriers to implementation of the Last Planner in applying heavy civil construction projects in Korea. The results can be used as a reference for companies to improve their work flow reliability for future projects.

The Case Study of Rock Treatment Method for the Fractured Rock Foundation of Underground Roadway Structure (기반암의 파쇄대 특성을 고려한 지하차도 기초 보강사례)

  • Yoon, Ji-Nam;Yang, Sung-Don;Lee, Geun-Ha;Park, Sa-Won;Jung, Hun-Chul
    • Tunnel and Underground Space
    • /
    • v.18 no.2
    • /
    • pp.125-133
    • /
    • 2008
  • The rock treatment methods for improving bearing capacity and reducing settlement of the underground roadway structure foundation on fractured rock was studied in this paper. Also, effective reinforcement scheme was evaluated by numerical analysis for the application to the practical construction. Various in-situ and laboratory tests were executed systematically at Yeongi-goon, Ohoongchungnam-do, Korea, for the purpose of defining the physical and mechanical properties of rock. Consequently the effective treatment methods insuring the bearing capacity of fractured rock were proposed. In addition, the adequate reinforcing depth of the comparatives measure, such as double rod, triple rod injection methods and micropile, were investigated from the case study. Finally, the most effective construction scheme with the consideration of safety and economical aspects were proposed by using numerical analysis(Plaxis ver. 8.2).