A Case Study about the Slope Collapse and Reinforcement Method on the Infinite Slope

무한사면에서의 사면붕괴와 보강대책 사례연구

  • Published : 2006.04.01

Abstract

The target slope of this study, formed during the construction of highway, is the very high infinite slope where sliding began along the discontinuity. Although an attempt was made to stabilize the upper part of the slope by installing the rock anchors, large scale failure was occurred at the lower part if the reinforced area. Afterwards, subsequent failures were observed two times. To investigate the cause of the failure, residual shear strength was measured by performing the direct shear test of rock specimen of the site. The anchor design was based on the pull-out test. Considering the slope surface where the undulation was severe and the variation of strength was very large, buttressing was used to obtain the required anchoring capacity.

연구지역은 고속도로 신설구간에 형성된 대절토 무한사면으로 불연속면을 따라 사면파괴활동이 시작되었다. 보강은 락앵커 공법을 시공하여 상부구간 안정화를 시도하였다. 그러나 앵커보강 하부구간에 대규모 붕괴가 추가 발생하였고 이후 2차례 더 진행되었다. 붕괴원인을 분석하기 위하여 시료를 채취하고 직접전단시험을 실시하여 잔류전단강도를 확인하였다. 그리고 붕괴지반의 앵커력 확보를 화인하기 위하여 앵커인발시험을 실시하고 앵커설계에 반영하였다. 앵커는 붕괴면의 굴곡이 심하고 연경의 변화가 심한 지반상태를 고려하여 계단식 옹벽과 조합하여 앵커력을 확보하도록 하였다.

Keywords

References

  1. AASHTO(l990), 'Tieback specifications', AASHTOAGC-ARTBATF27
  2. Nicholson, P. J., Uranowski, D. D., and Wycliffe-Jones, P. T. (1982), 'Permanent Ground Anchors: Nicholson design criteria', Rep. FHWA/RD-81-151, Federal Highway Administration, Washington, D.C
  3. Otta, L., Pantueck, M., and Goughnour, R. R. (1982), 'Permanent Ground Anchors: Stump design criteria', Rep. FHWA/RD-81-152, Federal Highway Administration, Washington, D.C
  4. Pfister, P., Evers, G., Guillaud, M., and Davidson, R. (1982), 'Permanent Ground Anchors: Stump design criteria', Rep. FHWA/RD-81-150, Federal Highway Administration, Washing, D.C
  5. Weatherby, D. E. (1982), 'Tiebacks', Report FHWA/RD-82-047, U.S. Dept. of Transportation, Fed. Hwy. Admin., Washington, D.C
  6. Cheney, R. S. (1988), 'Permanent Ground Anchors', Rep. FHW A/DP-68-IR, Federal Highway Administration, Washington, D.C
  7. Long, J. H., Weatherby, D. E., and Cording, E. J. (1997), 'Summary Report of Research on Permanent Ground Anchor Walls', Vol.1, Current Practice and Limiting Equilibrium Analyses, Report FHW A-RD-98-065, FHW A, McLean, VA
  8. Muller, C. G., Long, J. H., Weatherby, D. E., Cording, E. J., Powers, W. F., and Briaud, J-L. (1998), 'Summary Report of Research on Permanat Ground Anchor Walls', Vol. 3, Model-Scale Wall and Ground Anchor Test, Report-RD-98-067, FHWA, McLean, VA
  9. 김낙경, 박완서(2000).'Loda Transfer of Ground Anchors in Clay', 한국지반공학회논문집, VOL. 16, NO3, pp145-155
  10. 김낙경, 김성규(2001), '압축형 앵커의 개발 및 성능 평가', 한국지반공학회 2001 봄 학술발표회 논문집, pp 339-346
  11. Ground Anchor 기술협회(日)(1996), '그라운드앵커공법설계시공지침', 그라운드앵커기술협회(日)편, pp258-282
  12. 이상덕(1997), '토질시험-원리와 방법-', 새론, pp. 476-487