A Case Study about the Slope Collapse and Reinforcement Method on the Infinite Slope  

You Byung-Ok (한국도로공사 도로교통기술원)
Hong Jung-Pyo (한국도로공사 익산-장수 건설사업소)
Jun Jong-Hern (두산중공업)
Lee Tae-Sun (대원토질)
Min Kyoung-Nam (대원토질 엔지니어링사업본부)
Publication Information
Tunnel and Underground Space / v.16, no.2, 2006 , pp. 146-155 More about this Journal
Abstract
The target slope of this study, formed during the construction of highway, is the very high infinite slope where sliding began along the discontinuity. Although an attempt was made to stabilize the upper part of the slope by installing the rock anchors, large scale failure was occurred at the lower part if the reinforced area. Afterwards, subsequent failures were observed two times. To investigate the cause of the failure, residual shear strength was measured by performing the direct shear test of rock specimen of the site. The anchor design was based on the pull-out test. Considering the slope surface where the undulation was severe and the variation of strength was very large, buttressing was used to obtain the required anchoring capacity.
Keywords
infinite slope; rock anchor; anchor pull-out test; buttress;
Citations & Related Records
연도 인용수 순위
  • Reference
1 AASHTO(l990), 'Tieback specifications', AASHTOAGC-ARTBATF27
2 Ground Anchor 기술협회(日)(1996), '그라운드앵커공법설계시공지침', 그라운드앵커기술협회(日)편, pp258-282
3 이상덕(1997), '토질시험-원리와 방법-', 새론, pp. 476-487
4 김낙경, 박완서(2000).'Loda Transfer of Ground Anchors in Clay', 한국지반공학회논문집, VOL. 16, NO3, pp145-155
5 Otta, L., Pantueck, M., and Goughnour, R. R. (1982), 'Permanent Ground Anchors: Stump design criteria', Rep. FHWA/RD-81-152, Federal Highway Administration, Washington, D.C
6 Weatherby, D. E. (1982), 'Tiebacks', Report FHWA/RD-82-047, U.S. Dept. of Transportation, Fed. Hwy. Admin., Washington, D.C
7 Long, J. H., Weatherby, D. E., and Cording, E. J. (1997), 'Summary Report of Research on Permanent Ground Anchor Walls', Vol.1, Current Practice and Limiting Equilibrium Analyses, Report FHW A-RD-98-065, FHW A, McLean, VA
8 Nicholson, P. J., Uranowski, D. D., and Wycliffe-Jones, P. T. (1982), 'Permanent Ground Anchors: Nicholson design criteria', Rep. FHWA/RD-81-151, Federal Highway Administration, Washington, D.C
9 김낙경, 김성규(2001), '압축형 앵커의 개발 및 성능 평가', 한국지반공학회 2001 봄 학술발표회 논문집, pp 339-346
10 Cheney, R. S. (1988), 'Permanent Ground Anchors', Rep. FHW A/DP-68-IR, Federal Highway Administration, Washington, D.C
11 Muller, C. G., Long, J. H., Weatherby, D. E., Cording, E. J., Powers, W. F., and Briaud, J-L. (1998), 'Summary Report of Research on Permanat Ground Anchor Walls', Vol. 3, Model-Scale Wall and Ground Anchor Test, Report-RD-98-067, FHWA, McLean, VA
12 Pfister, P., Evers, G., Guillaud, M., and Davidson, R. (1982), 'Permanent Ground Anchors: Stump design criteria', Rep. FHWA/RD-81-150, Federal Highway Administration, Washing, D.C