• Title/Summary/Keyword: 터널시공관리

Search Result 213, Processing Time 0.027 seconds

Engineering interpretation of critical strains in the ground based on the tunnel engineering (터널공학을 중심으로 한 한계변형률의 공학적 적용성)

  • Shin, Yong-Suk;Park, Si-Hyun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.4
    • /
    • pp.403-410
    • /
    • 2009
  • This paper discusses an application method of critical strains concept for tunnels' safety by using the values of measured displacements which are obtained in the field. The aim of this paper is to: (1) study on the engineering meanings of critical strains concept by reviewing the previous researches and application examples with measured displacement values; (2) study on the engineering reasonability of critical strains concept with the view point of a tunnel engineering and a geotechnical engineering; (3) study on the features of ground deformation due to tunneling and reciprocal relation between total displacement and measured displacement; (4) evaluate a tunnel safety by using domestic measurements collected in the field; and (5) re-evaluate the control criteria which were previously used in the field, with the view point of critical strains concept. Consequently, it was confirmed that critical strains in the ground has a reasonability and a possibility of unified or common concept with the view point of a tunnel engineering.

라이닝콘크리트의 양생시스템 개선

  • Yu, Yeong-Seon;Kim, Yong-Ha;Mun, Byeong-Tak;Lee, Hyeon-Gu;Gwon, Gi-Hwal;Im, Ju-Yeong
    • Magazine of korean Tunnelling and Underground Space Association
    • /
    • v.13 no.2
    • /
    • pp.41-49
    • /
    • 2011
  • 양북터널은 굴착과 동시에 라이닝콘크리트를 타설하였다. 터널굴착과 라이닝콘크리트의 동시시공을 위한 적정시공 Cycle을 결정하고, 이에 따른 양생기간과 양생온도를 설정하는 순으로 시험하였다. 라이닝콘크리트는 품질관리를 위해 보온장치를 탑재한 Sliding form과 양생대차를 운영하고, 균열을 최소화하기 위해 양생온도와 양생시간 및 탈형강도 등을 시험에 의해 결정하였다. 시험과정은 터널내부와 라이닝콘크리트 내부온도를 계절별로 측정하고, 양생온도별로 콘크리트의 강도를 측정하였다. 거푸집 탈형시 콘크리트 온도가 터널내부의 온도로 수렴하기까지는 $15{\sim}20^{\circ}C$의 차이로 측정되었고, 거푸집 탈형을 위한 콘크리트 초기강도 4MPa을 발현하는데는 양생온도에 따라 차이가 발생하지만 시공 Cycle에 적합한 양생시간은 약 20시간이고, 이 때의 양생온도는 $23^{\circ}C$ 이상이었다. 위의 시험결과대로 현장에서 라이닝콘크리트를 양생한 결과 시공 Cycle과 압축강도 및 콘크리트면의 외관 등이 만족한 결과를 나타내었다.

  • PDF

The Behaviours of Existing Tunnels in response to Multiple side-by-side Tunnel Construction in Soft Ground (연약지반 다수의 터널 병렬시공 시 기존터널의 거동)

  • Ahn, Sung Kwon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.12 no.6
    • /
    • pp.193-204
    • /
    • 2008
  • This paper describes laboratory experiments modelling multiple tunnel construction in soft ground. A series of small-scale model tests have been conducted at approximately 1/50 scale in order to investigate the behaviours of existing tunnels in response to the construction of new tunnels in close proximity. The model tunnels were constructed in a consolidated Speswhite Kaolin clay using a tunnelling device involving an auger type cutter within a shield. Strain gauges and LVDTs were used for instrumenting the existing tunnels. The findings obtained from the analyses of these tests were compared to the field measurements involving the reconstruction of the Northern Line London Underground Ltd. tunnels at Old street, United Kingdom. The results were also compared to the ground movement measurements obtained from a separate set of tests undertaken using the same apparatus and experimental procedures.

Structural and Functional Measurements of a Space Truss Frame for Maintenance Works in Tunnels (터널의 유지보수공사 개선을 위한 가설 스페이스 트러스 프레임의 사용성 및 안정성 평가)

  • Lee, Dong Kyu;Kim, Do Hwan;Kim, Jin Ho
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.16 no.3
    • /
    • pp.92-98
    • /
    • 2012
  • This study shows details of a specific space truss frame structure devised to carry out maintenance and repair temporary works in tunnels. The purpose of this study is to verify structural safety and function of the innovative truss structure through an analysis tool, i.e.. ABAQUS, which is a suite of software application for finite element analysis and computer aided engineering. And then optimized size, i.e., thickness and diameter of truss members is evaluated in practice. In this study, construction methods in the temporary works are additionally represented by using the new space truss frame structure.

A Study on the Mechanized Construction for Common Ducts in a Road Tunnel (도로터널 공동구의 기계화 시공에 관한 연구)

  • Moon, Kyoung-Sic;Kim, Sung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.6
    • /
    • pp.1937-1944
    • /
    • 2014
  • In recent years, common ducts have been installed and operated in the sidewalls of tunnels to prepare for emergencies in tunnel construction and maintenance. The installation of common ducts is done mainly by humans. Problems with cost increases are inherent in tunnel construction by humans due to the safety risks and the economic inefficiency of humans performing construction activities. Among the problems that arise are poor illumination due to the use of temporarily installed electricity, the risk of accidents due to the confined workspaces, and workers avoiding work tasks because of the poor environment in tunnel. Ideas for solving these problems were developed using a value engineering (VE) process, and mechanized construction was identified as a promising solution. To verify the effectiveness of mechanized construction of a common duct in tunnels, experimental construction work was carried out, and mechanized construction was proven to directly improve the constructability and economic efficiency of common duct construction. In addition, reducing human involvement in common duct construction in tunnels is expected to improve safety, and because of the continuous concrete placement technique used, the finish and appearance of the ductwork are improved.

A Study for Tunnel Management System Development Using a Tunnel Scanner (터널 스캐너를 이용한 터널 유지관리시스템 개발에 관한 연구)

  • Yoon, Tae-Gook;Lee, Song
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.12 no.3
    • /
    • pp.183-190
    • /
    • 2008
  • The maintenance and management of each tunnel has been individually performed in depending on service, management agency, and tunnel size. The maintenance and management system for the existing tunnel consists of simple tunnel card and the computerization of basic tunnel data, now. There is not the systemic maintenance and management system for tunnel. Therefore, it has been impossible the systemic maintenance and management for tunnel due to loss of data obtained from each step, such as, plan, design, construction, or maintenance, with time. The objective of this study is to build the database system in combing the results of tunnel scanning with all data obtained from plan, design, construction, or maintenance step.

Analysis of cause and deterioration about using 3-Arch tunnel (공용중인 3-Arch터널의 열화조사 및 원인분석)

  • Lee, Yu-Seok;Park, Sung-Woo;Whang, In-Baek;Shin, Yong-Suk;Kim, Sun-Gon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.1
    • /
    • pp.97-105
    • /
    • 2009
  • This paper studied the cause of the deterioration of the four 3-Arch tunnels built in mid-1990. The common deteriorations of the four 3-Arch tunnels were longitudinal cracks, leakage and efflorescence at the same parts of lining concrete. Three fourths of 3-Arch tunnels, there was high percentage longitudinal cracks and a quarter was low frequency about longitudinal cracks. So the material reviewed to find out the differences between two groups in construction process and analysis was conducted such as non-destructive testing, precise visual survey and safety evaluation of one tunnel which had bad ground condition As the result, the tunnels were safety condition and the primary deterioration occurred during the construction process, namely, problems arrangement of rebar and the effects of the blast at middle tunnel.

Measurement of Tunnel Arch Settlements Ahead of and Behind the Tunnel Face Using a Horizontal Inclinometer and Settlement Pins (수평경사계와 천단침하계에 의한 터널막장 전후방의 천단침하 계측)

  • Kim, Cheehwan
    • Tunnel and Underground Space
    • /
    • v.23 no.2
    • /
    • pp.120-129
    • /
    • 2013
  • It is important to measure the displacement behind and ahead of a tunnel face during construction for evaluating mechanical stability by comparing it to a displacement criteria set by tunnel designers. The 30 m long horizontal inclinometer was installed frontward from the tunnel face and the displacement occurred ahead of a tunnel face during excavation was measured by using it. Tunnel arch settlements behind tunnel face were surveyed using a settlement pins on the arch. So total settlement and longitudinal displacement curve were obtained combining settlement measured by both the horizontal inclinometer ahead of tunnel face and the settlement pins behind the tunnel face.