• Title/Summary/Keyword: 타워크레인

Search Result 93, Processing Time 0.025 seconds

A study on risk factors having effect on perception of tower crane incident risk (타워크레인 사고 위험 지각에 영향을 미치는 위험 요인에 관한 연구(타워크레인 업무유형의 조절효과를 중심으로))

  • Eun, Nam-Gwon;Kim, Chang-Eun
    • Journal of the Korea Safety Management & Science
    • /
    • v.18 no.3
    • /
    • pp.33-45
    • /
    • 2016
  • Construction sites have gradually become bigger and bigger according to Korea economic growth. Also use of tower crane and other heavy equipment has been increased. The increased use of heavy equipment like tower crane is leading to fatality incident. This study will verify hazards to influence tower crane incident through structural and positive verification and find which hazard influence incident risk. The result of this study is as follows. First, while there is a significant difference between safety managers and tower crane operators for working environment, safety management, personal manage among risk factors, we can not find any evidence on the difference in perception of tower crane incident risk between them. Second, task manage risk and personal manage risk has a significant positive effect on perception of tower crane incident risk. Third, while site environment risk has a significant positive moderating effect of task type between risk factors and perception of tower crane incident risk, personal environment risk has a significant negative moderating effect between them.

Tower Crane Foundation Design and Stability Review Model (타워크레인 기초설계 및 안정성 검토 모델)

  • Ho, Jong-Kwan;Han, Kap-Kyu;Kim, Sun-Kuk
    • KIEAE Journal
    • /
    • v.7 no.6
    • /
    • pp.99-106
    • /
    • 2007
  • Tower crane is a large construction equipment which is extremely tall for its section when it is erected, with its high slenderness ratio, and it has a heavy load by itself due to large lifting stuff to handle. In line with the construction projects in these days which increasingly tend to become higher, larger and complex, the stuff and height subject to lifting are also getting larger and higher, which has also increased the risk of disastrous accidents. A stable foundation design thus to deal with the increasing self load becomes more important. When a typhoon Maemi swept the nation in 2003, as many as 43 tower cranes fell down or collapsed, causing a severe damage to the people and the properties. Considering such fatal damages, a technical evaluation of the stability to prevent the safety accident with the tower crane must be very crucial. Tower cranes operation in domestic construction sites, in fact, have been simply dependent on personal experience and intuition of the engineers. Particularly when it comes to the foundation design, it mostly depends on manufacturer's recommendation. The study hence was intended to develop the fundamental measures for granting the objective stability, instead of following the individual's experience only. The simulation model recommended in the study is expected to make a good commitment to achieving an effective lifting work as well as preventing the safety accident.

Development of a Real-time Lifting-path Tracking System of a Tower-crane for Steel Members based on an Integrated Wireless RF Modem and GPS System (무선 RF모뎀과 GPS를 통합한 타워크레인의 철골부재의 실시간 양중위치 추적시스템 개발)

  • Yun, Seok-Heon;Lee, Ghang
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.3
    • /
    • pp.65-70
    • /
    • 2010
  • Steel frame construction in high places entails many risk factors. In order to improve the safety and productivity of steel frame construction, a project to develop a robotic tower-crane has been undertaken. As the first step, a real-time lifting-path tracking system is being developed. In a previous study, a laser-based tracking system was proposed. While a laser-based tracking system requires at least three laser sensors to detect the x, y, z coordinates of a lifted steel member, a GPS-based system has an advantage over the laser-based system, in that the x, y, z coordinates of a lifted steel member can be detected by a single GPS sensor. To improve the accuracy, arelative positioning method using two GPS sensors was proposed in a previous study. This paper reports an improved GPS-based lifting-path tracking system of a tower crane based on an integrated RF modem and GPS system. The results showedthat the RF modem could successfully send the identifier information to a server a maximum distance of 1 km away from the lifted steel beam, and the lifting path information of each beam captured by the GPS-based tracking system was successfully saved together. Also, byusing an improved algorithm for the GPS relative positioning method, the deviation was reduced to 0.61 m on average.

A Preliminary Study on Active Learning Process in Construction Engineering (건설엔지니어링 대학교육의 능동적 학습방식 도입 기초 연구)

  • Cho Chang-Yeon;Lee Jun-Bok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.610-613
    • /
    • 2003
  • Ensuring technical ability is essential in the construction industry to increase competitiveness in the global market. A new paradigm is coming up in academic education system to cultivate the competent engineers. The major objective of this research is to suggest a positive learning pattern In order to overcome the limitations of the passive learning style. A case study, technical upgrading with a tower crane, us explained in terms of active learning process, results, and evaluation of students' performance.

  • PDF

An Analysis of Factors Affecting the Safety of Tower Crane in Construction Site (건설현장 타워크레인의 안전성에 영향을 미치는 요인 분석)

  • Ahn, Sungjin;Kim, Tae-Hui;Kim, Ji-Myong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.44-45
    • /
    • 2019
  • Tower cranes are essential equipments that play a key role in the overall process of large-scale construction projects, as well as high-rise apartments construction projects. Tower cranes hoist various loads near and over people, working in crowded environments, sometimes in overlapping work areas, and often under the constraints of time, budget, and labor. This work system further increases the safety risks of sites with inherently hazardous workplaces. The methodology of this research was based on a comprehensive inquiry of a team of experts, including safety managers and equipment managers of major construction companies and previous literature search. Due to the limited resources available to improve safety and prevent accidents, more attention should be paid to all parties involved in factors that have been evaluated to have a significant impact on site safety due to tower crane operations.

  • PDF

A Study on The Development of Safety Estimation Program for Tower Crane (타워크레인 안전성 평가 프로그램 개발에 관한 연구)

  • 김창은;이원근;윤산하
    • Journal of the Korea Safety Management & Science
    • /
    • v.4 no.2
    • /
    • pp.43-56
    • /
    • 2002
  • This Study is proposed solutions about operating and release of safety constructions and is researched about software safety estimation than hardware safety estimation. Also, preventing safety problems of Tower Crane operator and Construction workers as applying safety estimation program that developed at setup, operating, release stage after analyze problem patterns and causes.

A study on the accident prevention by a survey of people related to construction machinery (건설기계 관계자 실태조사를 통한 사고 예방에 관한 연구)

  • Banseok Lee;Youngsu Lee;Taekeun Oh
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.4
    • /
    • pp.557-562
    • /
    • 2023
  • Although various policies have been conducted on safety work of construction equipment such as lifts, tower cranes, and mobile cranes, institutional and managerial problems, and improvement measures, accidents are still not decreasing. This study tried to identify differences in the viewpoints of supervisors, safety managers, and construction machinery operators and to obtain survey data on the awareness and necessity of related safety education. In conclusion, accidents would be reduced when workers received effective training on accurate work methods, safety rules, and recognition and removal of risk factors.

Physical Modeling for Enhancement of the Functionality of Construction Graphical Simulation System (건설 그래픽 시뮬레이션 시스템의 기능 개선을 위한 물리적 모델링)

  • Kim, Yeong-Hwan;Jung, Pyung-Ki;Seo, Jong-Won
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.80-88
    • /
    • 2006
  • Construction graphical simulations usually do not reflect physical properties of construction equipment and material because there are restricted to the geometric model. The complete description of construction operations is difficult for graphical simulation without a physical modeling. The object of this research is to enhance the functionality of restricted simulation system to geometric model. And research is conducted to overcome the limitation of current construction graphical simulation system through the connection geometric model and physical model with the physical properties of construction equipment and material such as crane's cable oscillation. The motion equations for the oscillation of crane cable as a result of the trolley's movement and the boom's rotation were derived. The equations were solved through numerical analysis and the results were simulated visually. The realistic description with physical modeling of construction operations will contribute for ensuring preliminary against risks and improving constructability as well as the application of various fields.

Safety Assessment for Installation of Deck Crane by Lifting (데크 크레인의 리프팅 설치 작업에 대한 안전성 평가)

  • Ryu, Hyun-Su
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.6
    • /
    • pp.3680-3684
    • /
    • 2015
  • A deck crane is installed on the deck of a ship by lifting method using tower crane or floating crane. The safety assessment for two points lifting method should be preceded to ensure a safe installation of deck crane. In this study, finite element models of deck crane and fixing jig are generated for the structural analysis which can evaluate a safety of lifting method. Also, reaction forces and boundary conditions considering lifting state are applied to the structural analysis. The proposed safety assessment method can be useful as an analytic tool that can provide a safer procedure for installation of deck crane by lifting method.