Browse > Article

Tower Crane Foundation Design and Stability Review Model  

Ho, Jong-Kwan (삼성물산 건설부문 기술본부 TA팀)
Han, Kap-Kyu (경희대학교 건축공학과)
Kim, Sun-Kuk (경희대학교 건축공학과)
Publication Information
KIEAE Journal / v.7, no.6, 2007 , pp. 99-106 More about this Journal
Abstract
Tower crane is a large construction equipment which is extremely tall for its section when it is erected, with its high slenderness ratio, and it has a heavy load by itself due to large lifting stuff to handle. In line with the construction projects in these days which increasingly tend to become higher, larger and complex, the stuff and height subject to lifting are also getting larger and higher, which has also increased the risk of disastrous accidents. A stable foundation design thus to deal with the increasing self load becomes more important. When a typhoon Maemi swept the nation in 2003, as many as 43 tower cranes fell down or collapsed, causing a severe damage to the people and the properties. Considering such fatal damages, a technical evaluation of the stability to prevent the safety accident with the tower crane must be very crucial. Tower cranes operation in domestic construction sites, in fact, have been simply dependent on personal experience and intuition of the engineers. Particularly when it comes to the foundation design, it mostly depends on manufacturer's recommendation. The study hence was intended to develop the fundamental measures for granting the objective stability, instead of following the individual's experience only. The simulation model recommended in the study is expected to make a good commitment to achieving an effective lifting work as well as preventing the safety accident.
Keywords
Tower Crane; Stability Examination; Vertical Lift Planning;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 이명구, 노민래 (2001). "타워크레인 붕괴사고의 구조적 분석." 한국산업안전학회 논문집, 제16권 제4호, 한국산업안전학회, pp. 147-152
2 구문희 (2006). "한국의 타워크레인 기술동향 및 안전대책." 제5회 한중일 국제 크레인 심포지엄 발표자료
3 Kuo-Liang Lin, Carl T. Haas (1996). "An Interactive Planning Environment for Critical Operations." J. of Construction Engineering and Management, V.122 N.3, ASCE, pp. 212-222   DOI   ScienceOn
4 Colin Gray, James Little (1985). "A Systematic Approach to the Selection of an Appropriate Crane for a Construction Site." Construction Management and Economics, 3, pp. 121-144   DOI
5 김정진, 최인성 (2005). "초고층 건축공사의 양중계획 시스템에 관한 연구." 한국건축시공학회 논문집, 제5권 제4호, 한국건축시공학회, pp. 121-129
6 손상현 (2003). "초고층 양중계획." 한국 초고층 건축 포럼 발표자료
7 Shuzo Furusaka, Colin Gray (1984). "A Model for the Selection of the Optimum Crane for Construction Sites." Construction Management and Economics, 2, pp. 157-176   DOI
8 김홍현, 이강(2007). "FMEA 기법을 활용한 크레인 관련 중대 재해의 정량적 분석에 관한 연구." 한국건축시공학회 논문집, 제7권 제3호, 한국건축시공학회, pp. 115-123   과학기술학회마을   DOI
9 이현수 외 2인 (2002). "고층건축공사의 타워크레인 계획 프로세스 개발." 대한건축학회 논문집(구조계), 제18권 제6호, 대한건축학회, pp. 119-126
10 이병구, 설종협 (2002). "Tower Crane 설치계획 및 구조보강 방법 소개." 건설기술, 제23권, 쌍용건설 기술연구소, pp. 33-37