Preliminary Study on the Factors Analysis of Change Order-Claim in Design-Build Project (설계시공일괄입찰공사의 설계변경 클레임요인 분석에 관한 기초 연구)

  • Ryu, Hyeok-Jun;Park, Byung-Ju;Yoo, Seung-Kyu;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.129-130
    • /
    • 2012
  • Although the order of Design-Build is being expanded by increasing construction scale and demanding hybrid function, the suitable regulation of the contracts is not settled. Design-Build is way by government because there are big construction of much government leading in contract relation high position occupy. So, case that prebendary's claim institution develops by litigation is very rare. But, recently Design-Build is magnified. So, these dispute factors is becoming visualization gradually. The contract system is needed to be consistent by international standard to deal with the problem. This study suggests the useful solutions in detail concerned with the main factor of change order claim by each Design-Build phases through practical sorting and analysis of the causes of Change Order-Claim.

  • PDF

Risk Mitigation Methodology of the General Conditions of Contract (공사계약일반조건의 위험요인 감소방안)

  • Yoon, Chul-Sung;Kwon, Soon-O;Kim, Seon-Gyoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.5 s.27
    • /
    • pp.177-185
    • /
    • 2005
  • Construction uncertainties are frequently exposed to the claims. In most cases, an interpretation of the claims is based on the construction contract. Therefore, the key points of contract negotiation are how to fairly distribute the contract risks to the client and contractor. For these, a FIDIC that is considered as an international standard contract form would be a good reference to decide reasonable contract risk distribution. In order to find out any unreasonable and unfair contract clauses at the general conditions of contract applying generally to public construction project in Korea, this study surveys, analyses and evaluates the general conditions of contract based on a FIDIC, and then proposes a risk mitigation methodology to response those clauses' risk factors reasonably.

Identification of Claim Elements for Design Build Projects using FMEA Method (FMEA 기법을 이용한 설계시공일괄방식 주요 클레임 요인 도출)

  • Yoon, Seokmin;Hyun, Changtaek;Han, Sangwon;Cha, Yongwoon
    • Journal of KIBIM
    • /
    • v.5 no.2
    • /
    • pp.26-33
    • /
    • 2015
  • Design-build projects were devised to enhance the design technologies of the domestic construction industry and the efficiency of public works, contributing greatly to the development of construction technologies. However, as various stages of the process, such as formulation of basic plans and design documents, and deliberations proceed, claims, including changes in the requirements of clients, and design changes occur. These claims result in the delay in construction and an increase in construction costs. In this regard, this study attempted to identify main claims that delay construction and increase the costs of design-build projects, prevent claims in the future, and improve the efficiency of project implementation.

A Study on Analyzing Effect of Claim Factoy to Prevent Claim in Early Stage for Construction Project - Focusing on Turn-Key Project - (건설 프로젝트 초기단계에서의 클레임 방지를 위한 클레임 요인 영향도 분석에 관한 연구 - 턴키공사 사레 중심으로 -)

  • Yoon Jun-Seon;Seo Choon-Taek
    • Journal of Arbitration Studies
    • /
    • v.15 no.1
    • /
    • pp.95-112
    • /
    • 2005
  • In the inner turn key constructions the problems of uniform types are repeatedly occurred, and, especially, many problems happen up to the stage of pre-construction(from a bid to a contract) owing to the specialties of the turn key constructions. So the claim factors of the Korean turn key constructions were abstracted in antecedent paper. When the technicians meeting the interior turn key constructions for the first time and working here now are well acquainted with only these factors, many claims will be prevented. By analysing the degree of claims by claims factors through the questionnaires to the experts about the abstracted factors and surveying the amount of the claims through the case studies, what factors exerted how much of influence on the claims was tested and analyzed. Studying and Managing the factors affecting the claims much led the technicians in charge of internal turn key constructions to the prevention and the proper solution of the site claims.

  • PDF

Deduction or Importance Analysis for Pre-dispute Factors in the Constructions (건설공사 사전분쟁요인 도출 및 중요도 분석)

  • Park, Sung-Yong;Ko, Dae-Jun;Ha, Bong-Gyun;Yang, Jin-Kook;Lee, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.505-508
    • /
    • 2008
  • It's hard to express a lot of information within the drawings and the specifications as construction projects have gradually become large-size and complex. So, disputes are caused by that and reason that the usual practice(culture) of contract of the constructions in Korea is based on unfair rather than the fair principle between clients and contractors. However, the contractors don't try to solve this kind of things because they are worried about at their disadvantage situation. Therefore, this paper deduced the factors in the pre-dispute phase by analysing the cases of the civic counseling in the office of supply and the pre-dispute factors, and conduct analysis on the factors' importance by using AHP. The results will be used for a check-list to prevent the disputes.

  • PDF

A Study on Selecting Factors of Container Shuttle Carrier by Logistics Companies in the Port Hinterland (항만배후단지 셔틀 운송사 선정요인의 중요도에 관한 연구)

  • Choi, Boyoung;Kim, Sangyoul;Park, Ho
    • Journal of Korea Port Economic Association
    • /
    • v.37 no.2
    • /
    • pp.107-118
    • /
    • 2021
  • This study investigates the strategies that are important for selecting shuttle carriers and logistics warehouses. In container transportation, competitive pricing has become an order qualifier due to the establishment of the standard freight rate system. As a result of this study, it can be seen that both logistics warehouses and shuttle carriers place greater importance on the partnerships with companies and employee education. Besides those two factors, the punctuality of delivery is found to be important for the quality of transportation. Therefore, companies must continue to increase their competitiveness. As customer service of the shuttle carrier, resolving the loss or damage and claim handling part is evaluated more importantly in the logistics warehouse than the ablity to resolve unexpected event. The future strategy should focus on resolving the loss/damage and claim handling factors so that companies can be competitve in the future. Based on research results, logistics warehouses and shuttle carriers can establish different marketing strategies to maintain a firm position on the market by securing competitive advantage within port hinterland.

A Liquidated Damages Calculation Method Based on Owner's Substantial Loss (발주자 손실기반 지체상금 산정 개선방안)

  • Jang, Bong-Jo;Shim, Jae-Young;Koo, Jeong-San;Jung, Dae-Won;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.150-158
    • /
    • 2007
  • The delay of construction is one of the most frequent and complicated elements of the claim. And the liquidated damages cause many disputes during the judgement. The liquidated damages should be a compensation for owner's substantial loss, but actually be applied as a damage for breach of contract. These damages are different from owner's loss and give constructors a excessive burden. So we need a more reasonable system than a lump application system. In this study, we make a Improvement System, that based on owner's substantial loss, and suggest the new liquidated damages calculation method.

Construction Conflict Risk Factors based on the Conflict Cost (분쟁청구비용을 고려한 건설 분쟁의 위험요인)

  • Shin Han-Woo;Soe Jang-Woo;Cho Hun-Hee;Kang Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.05a
    • /
    • pp.125-128
    • /
    • 2006
  • Since the diversification, complication of the construction industry, construction conflicts have been increased these days. Expansion of scale of construction has brought conflict treatment cost increase. Thus, needs of the study on construction conflict risk factors and its management is getting important. But the existing studies about construction conflicts and risk factors that need to be cared to decrease construction cost are almost focused on analysis of number of conflict proposed. It means those studies can be helpful when want to know how many conflict have been instituted, however, they do not contain a close examination between types of conflict and cost of conflict treatment. The purpose of this study, therefore, is an extraction of conflict causes based on the conflict treatment cost and the choice of significant risk factors to be managed to prevent conflict and its treatment cost, which enables reducing the conflict treatment colt on control the risk factors.

  • PDF

A Study on the Operational Way of Freight Forwarding Company: Focusing on Residental Moving Company (화물운송주선업체의 운영방안에 관한 연구 - 이사화물운송주선업체를 중심으로 -)

  • Moon, Jong-Ryoung;Jung, Hyun-Jae;Lee, Tae-Hwee;Kim, Young-Hwan;Yeo, Gi-Tae
    • Journal of Korea Port Economic Association
    • /
    • v.26 no.3
    • /
    • pp.221-239
    • /
    • 2010
  • This study aims to provide solutions concerned with to residential moving companies about their operational problems. In order to shed light on these problem, factor analysis and fuzzy AHP method are adopted. Selected factors are low quality of workers and equipments, weak condition of business, policy and form of a contract, and excessive competition. The results of survey show that excessive competition is the most urgent problem compared with other problems. In the twelve-measured variables, The problem of non-certificated firms, low service quality caused by excessive competition, and claims caused by lack of service instruction are chosen as the urgent matters. As a result of the analyses, the study would propose policy directions how to solve these problems. Firstly, the government should make the legal basis of operating the industry because there is too competitive in the field. Secondly, the government should regulate firms which have not a certificate because they are the cause of low service quality in the field. Thirdly, in order to improve the service quality, the study would suggest that the managers should instruct the workers of residential moving companies. Lastly, the paper would suggest that customers check the certificate of the firm allowed by the government authorities.