Development of hydro-mechanical-damage coupled model for low to intermediate radioactive waste disposal concrete silos (방사성폐기물 처분 사일로의 손상연동 수리-역학 복합거동 해석모델 개발)

  • Ji-Won Kim;Chang-Ho Hong;Jin-Seop Kim;Sinhang Kang
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.26 no.3
    • /
    • pp.191-208
    • /
    • 2024
  • In this study, a hydro-mechanical-damage coupled analysis model was developed to evaluate the structural safety of radioactive waste disposal structures. The Mazars damage model, widely used to model the fracture behavior of brittle materials such as rocks or concrete, was coupled with conventional hydro-mechanical analysis and the developed model was verified via theoretical solutions from literature. To derive the numerical input values for damage-coupled analysis, uniaxial compressive strength and Brazilian tensile strength tests were performed on concrete samples made using the mix ratio of the disposal concrete silo cured under dry and saturated conditions. The input factors derived from the laboratory-scale experiments were applied to a two-dimensional finite element model of the concrete silos at the Wolseong Nuclear Environmental Management Center in Gyeongju and numerical analysis was conducted to analyze the effects of damage consideration, analysis technique, and waste loading conditions. The hydro-mechanical-damage coupled model developed in this study will be applied to the long-term behavior and stability analysis of deep geological repositories for high-level radioactive waste disposal.

Stability Analysis of Concrete Plugs Using a 3-D Failure Criterion (3차원 파괴조건식을 이용한 콘크리트 플러그의 안전도 평가)

  • Lee, Youn-Kyou;Song, Won-Kyoung;Park, Chul-Whan;Choi, Byung-Hee
    • Tunnel and Underground Space
    • /
    • v.21 no.6
    • /
    • pp.526-535
    • /
    • 2011
  • A new failure criterion for concrete, which takes into account the effect of the intermediate principal stress, is proposed. The new criterion, which takes the advantages from both the Mohr-Coulomb and the Willam-Warnke criteria, is linear in the meridian section, while its octahedral section is always smooth and convex. Fitting the triaxial compression data with the proposed criterion shows the high performance of the new criterion. A new formula for the factor of safety of concrete is defined based on the new failure criterion and it is employed in the stability analysis of the concrete plugs installed in the pilot plant. The new formula for the factor of safety measures the degree of closeness of a stress state to the failure surface in the octahedral plane. Finally, 3-D finite element analyses of pilot plant were carried out to obtain the stress distributions in the plugs. Then, the stress distributions are converted to those of factor of safety by use of the proposed formula. Based on the distribution of factor of safety in the concrete plugs, the stability of the tapered and wedge-shaped plugs is evaluated.

Execution Case Study on the Explosive Demolition of a Large-Section RC Special Structure (대단면 철근콘크리트 특수구조물 발파해체 시공 사례)

  • Park, Hoon;Suk, Chul-Gi
    • Tunnel and Underground Space
    • /
    • v.19 no.5
    • /
    • pp.397-406
    • /
    • 2009
  • Recently, the number of industrial structures that must be demolished due to structural deterioration and unsatisfactory functional conditions has been increased. To minimize environmental hazardous factors created during the process of demolition, the explosive demolition method has been applied increasingly. This execution case was intended to describe an application of the explosive demolition method to the demolition of a Crusher & Screen structure, which was a large-section reinforced concrete special structure. It was deemed necessary due to its structural deterioration and unsatisfactory functional condition. Various pre-weakening processes and blasting patterns were applied to the large-section reinforced concrete members, and to reduce blasting vibration and impact vibration, time intervals were established for blasting in the same column and for blasting between blasting blocks. By applying the explosive demolition method to the demolition of a large-section reinforced concrete special structure, the explosive demolition was completed safely and efficiently, without causing any damage to surrounding facilities.

Reliability based durability assessment of marine concrete structures (해양 콘크리트 구조물의 신뢰성 기반한 내구성 평가)

  • Song, Ha-Won;Lim, Dong-Woo;Pack, Seung-Woo;Lee, Chang-Hong
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.497-500
    • /
    • 2008
  • In order to prevent deterioration of reinforced concrete structures exposed to marine environment, performance based durability design than the design by conventional deemed-to-satisfy rule should be concerned. For example, even though chloride threshold level, which is a major parameter for durability design, is defined as a 1.2 $kg/m^3$ in the Korean concrete specification, it shows that the chloride threshold level leads to over design in its real application so that realistic value should be determined for the performance design. In this paper, not only the probabilistic properties of chloride threshold level obtained from published data are taken into account, but also the experimental results of the probabilistic properties using surface chloride content, diffusion coefficient, cover depth are considered in the assessment utilizing the concept of performance based durability design. In computation, the Monte Carlo Simulation (MCS) is used to perform an assessment due to chloride attack for a target submerged tunnel box. This study found that the specification on current chloride threshold level should be modified for more rational and accurate assessment and design.

  • PDF

Introduction of the Best Practices in the Pakistan Gulpur HEPP (파키스탄 Gulpur 수력발전 현장의 Best Practices 소개)

  • JANG, Ock Jae;HONG, Won Pyo;CHAE, Hee Moon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.216-217
    • /
    • 2022
  • Gulpur 수력발전 프로젝트는 전력난을 겪고 있는 파키스탄에 102 MW 규모의 수력발전소를 건설하여 30년 동안 운영 관리한 후 파키스탄 정부로 양도하는 IPP(Independent Power Producing) 형식의 투자사업이다. 남동발전과 DL E&C, 롯데건설이 Sponsor로서 출자한 자본금과, ADB, IFC, K-EXIM 등의 대주단로부터의 차입금을 재원으로 하여 소요 사업비를 조달하고 사업을 개발하였다. DL E&C와 롯데건설이 EPC(Engineering, Procurement, Construction)를 수행하였고, 이산이 Design consultant의 역할을 수행하였다. Gulpur 수력발전 프로젝트의 발전형식은 수로식(run-of-river)으로 201 m3/s의 발전유량과 102 MW의 발전 시설용량을 이용하여 연평균예상발전량은 398 GWh이다. 주요 구조물로는 설계 재현빈도 1년의 유수전환시설(가물막이댐 & 가배수터널)과 콘크리트 중력식댐(H 67 m, L 205 m), 도수터널(D 6.7 m, L 215 m, 2기), 옥외형 발전소 (H 51 m, W 60 m, L 38 m, Kaplan 2기)가 있으며, 2015년 10월 착공하여 2020년 3월 상업발전을 시작하였다. 본 프로젝트는 DL E&C의 첫 번째 EPC 해외수력발전 프로젝트이다. 따라서 프로젝트의 성공적 수행을 위한 경제적 설계, 시공의 효율성 및 안정성 확보 등을 위하여 많은 연구를 수행하는 과정에서 다양한 기술 개선을 이룰 수 있었다. 본고에서는 Gulpur 프로젝트를 통하여 도출된 성공 사례들을 소개 및 공유하고자 한다. 첫 번째로 콘크리트 중력식댐 시공을 위한 유수전환시설의 최적 설계빈도를 산정하였다. 일반적으로 유수전환시설의 규모는 설계기준에 제시된 설계 재현빈도를 이용하는데, 해외 설계기준에서는 10년, 국내 설계기준에서는 1~2년으로 다르게 제시되어 있는 문제점이 있다. 유수전환시설의 규모는 프로젝트의 경제성에 큰 영향을 미치기 때문에 최적 설계빈도의 결정이 필요하며, 위험도분석기법(Risk Analysis)과 기대화폐가치법(Expected Monetary Value)을 이용하여 유수전환시설의 최적 설계 재현빈도와 이에 영향을 미치는 인자를 분석하였다. 위험도는 몬테카를로 시뮬레이션으로 산정된 가물막이댐 파괴확률과 재현빈도를 이용하여 산정된 가물막이댐 월류확률을 고려하였으며, 비용 및 피해액으로는 유수전환시설의 공사비, 가물막이댐 파괴시의 재건설비용과 지체보상금, 가물막이댐 월류시의 복구비용을 고려하였다. 이에 대한 연구결과로, 유수전환시설의 사용기간과 월류시의 복구비용이 유수전환시설의 설계 재현기간 결정에 가장 큰 영향을 미치는 것으로 나타났고, 특히 월류시의 복구비용이 작을수록 낮은 설계 재현빈도를 선택하는 것이 타당한 것으로 나타났다. 예를 들어, 유수전환시설의 사용기간이 3 ~ 5년, 복구비용이 0.5 ~ 1.0 mil USD 이하인 조건에서 가물막이시설의 최적 설계빈도는 1년 ~ 2년인 것으로 나타났다. 또한, 유수전환시설의 사용기간은 본댐의 규모와 시공기간 등을 고려하여 결정되는 사항으로 설계자가 임의 조정할 수 없지만, 복구비용은 시공 관리자에 따라 결정되는 부분으로, 적극적 홍수 피해 저감 및 복구방안을 마련하는 것이 프로젝트의 경제성을 향상시킬 수 있다는 것을 알 수 있었다. 두 번째로 프로젝트의 경제성 향상, 홍수기 댐 시공시의 안전성 확보를 위하여 홍수 조기경보시스템(Early Warning System)을 개발 및 활용하였다. 수로식(Run-of-river) 수력발전댐은 대부분 산악지역에 위치하기 때문에 국지성 강우 및 급한 지형 경사로 인하여 돌발홍수(flash flood)의 발생 가능성이 높다. 따라서 시공 중 홍수(월류) 발생을 미리 감지하고 현장에 전파할 수 있는, 수로식(Run-of-river) 수력발전댐 현장을 위한 홍수 조기경보시스템이 필요하며, 이를 리스크 인식, 모니터링 및 경보, 전파 및 연락, 반응 능력 향상의 4가지 부분으로 나누어 구축하였다. 리스크 인식 부분에서는 가물막이댐 월류 발생 상황에 대한 위험도, 취약성, 리스크를 제시하였으며, 모니터링 및 경보 부분에서는 상류 측정수위에서 유도된 현장 예상수위와 실제 현장 측정 수위를 대상으로 경보홍수위와 위험홍수위로 나누어 관리하였다. 전파 및 연락 부분에서는 현장 시공 조직을 활용하여 홍수시를 대비한 비상연락체계도(Emergency communication flow chart)를 운영하였으며, 반응 능력 향상을 위해 비상연락체계도의 팀별 Action plan을 상세화 하였다. 세 번째로 현장의 지질특성과 50여 차례 발파시험으로 현장 고유의 발파진동감쇄곡선을 도출하였으며, 이를 통해 현장의 시공성과 콘크리트 품질 확보를 동시에 달성할 수 있는 방안을 제시하였다. 콘크리트댐 공사에서는 제한된 공기 내에 공사를 완료하기 위해 사면부 굴착과 콘크리트 타설이 동시에 수행될 수밖에 없는 문제점을 가지고 있다. 그러나 신규 콘크리트 타설면 근처에서 발파를 수행하는 경우 발파로 발생되는 탄성파가 일정 수준을 초과하게 되면, 콘크리트 양생에 영향을 주게 된다. 따라서 다수의 현장 발파시험을 통해 발파거리와 최대진동속도의 상관관계 즉, 발파진동감쇄곡선을 도출함으로써 현장의 발파진동특성을 도출할 수 있었다. 또한, 기존 연구 논문들을 통해 콘크리트 재령기간 별 안전진동속도를 선정하고, 해당 안전진동속도를 초과하지 않는 범위에서 콘크리트 타설면과 발파위치의 거리에 따라 1회 발파 가능한 장약량을 산정하여 적용하였다. 이와 같은 체계적인 접근을 통해 콘크리트 타설과 발파 작업 동시 수행에 대한 논란을 해소할 수 있었다.

  • PDF

Case Study of the Stability of a Large Cut-Slope at a Tunnel Portal (터널 입구부 대절토 사면 안정성 사례 연구)

  • Park, Dong Soon;Bae, Jong-Soem
    • The Journal of Engineering Geology
    • /
    • v.25 no.1
    • /
    • pp.115-129
    • /
    • 2015
  • The cut-slope of a large-sectional tunnel portal is recognized as a potential area of weakness due to unstable stress distribution and possible permanent displacement. This paper presents a case study of a slope failure and remediation for a large-scale cut-slope at a tunnel portal. Extensive rock-slope brittle failure occurred along discontinuities in the rock mass after 46 mm of rainfall, which caused instability of the upper part of the cut-slope. Based on a geological survey and face mapping, the reason for failure is believed to be the presence of thin clay fill in discontinuities in the weathered rock mass and consequent saturationinduced joint weakening. The granite-gneiss rock mass has a high content of alkali-feldspar, indicating a vulnerability to weathering. Immediately before the slope failure, a sharp increase in displacement rate was indicated by settlement-time histories, and this observation can contribute to the safety management criteria for slope stability. In this case study, emergency remediation was performed to prevent further hazard and to facilitate reconstruction, and counterweight fill and concrete filling of voids were successfully applied. For ultimate remediation, the grid anchor-blocks were used for slope stabilization, and additional rock bolts and grouting were applied inside the tunnel. Limit-equilibrium slope stability analysis and analyses of strereographic projections confirmed the instability of the original slope and the effectiveness of reinforcing methods. After the application of reinforcing measures, instrumental monitoring indicated that the slope and the tunnel remained stable. This case study is expected to serve as a valuable reference for similar engineering cases of large-sectional slope stability.

A numerical comparison study on the estimation of relaxed rock mass height around subsea tunnels with the existing suggested methods (해저터널의 이완하중고 산정을 위한 제안식들과의 수치해석적 비교 연구)

  • You, Kwang-Ho;Lee, Dong-Hoon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.10 no.1
    • /
    • pp.25-36
    • /
    • 2008
  • When constructing subsea underground structures, the influence of high water and seepage pressure acting on the structures can not be neglected. Thus hydro-mechanical coupled analysis should be performed to estimate the behavior of the structures precisely In practice, relaxed rock load is generally used for the design of tunnel concrete lining. A method based on the distribution of local safety factor around a tunnel was proposed for the estimation of a height of relaxed rock mass ($H_{relaxed}$). In this study, the validation of the suggested method is investigated in the framework of hydro-mechanical coupled analyses. It was suggested that inducing inflow by pumping through a drainage well gave more reliable results than inducing inflow with shotcrete hydraulic characteristics in case of rock condition of Class III. In this study, therefore, inducing inflow by pumping through a drainage well are adopted in estimating $H_{relaxed}$ due to a tunnel excavation with the rock condition of Class I, III, and V. Also the estimated $H_{relaxed}$ results are compared with those of the existing suggested methods. As the result of this study, it is confirmed that estimating $H_{relaxed}$ based on the distribution of local safety factor around a tunnel can be effectively used even for the case of hydro-mechanical coupled analysis. It is also found that inducing inflow pumping through a drainage well gives more precise and consistent Hrelaxed of a subsea structure.

  • PDF

Experimental evaluation of fire protection measures for the segment joint of an immersed tunnel (침매터널 세그먼트조인트의 내화 대책에 대한 실험적 평가)

  • Choi, Soon-Wook;Chang, Soo-Ho;Kim, Heung-Youl;Jo, Bong-Hyun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.3
    • /
    • pp.177-197
    • /
    • 2011
  • In this study, a series of fire experiments under $HC_{inc}$ and ISO834 (duration of 4 hour) fire scenarios were carried out for three different types of fire protection measures for the segment joint to evaluate their applicabilities to an immersed tunnel. The experimental results revealed that an expansion joint installed to allow relative movements between concrete element ends in an segment joint is the most vulnerable to a severe fire. For the fire protection measure where the originally designed steel plates at an expansion joint arc replaced by fire-resistant boards, the experiments showed that they cannot achieve good fireproofing performance under both $HC_{inc}$ fire scenario and ISO834 (4 hour) fire scenarios since the installation of fire-resistant boards results in the reduction of the sprayed fire insulation thickness. On the other hand, the application of modified bent steel plates replacing the original steel plates was proved to be very successful in fireproofing of the expansion joint due to more sprayed materials filled in bent steel plate than in the original design concept as well as higher adhesion between the steel plate and the sprayed fire insulation layer.

Development of Crack Detection System for Highway Tunnels using Imaging Device and Deep Learning (영상장비와 딥러닝을 이용한 고속도로 터널 균열 탐지 시스템 개발)

  • Kim, Byung-Hyun;Cho, Soo-Jin;Chae, Hong-Je;Kim, Hong-Ki;Kang, Jong-Ha
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.25 no.4
    • /
    • pp.65-74
    • /
    • 2021
  • In order to efficiently inspect rapidly increasing old tunnels in many well-developed countries, many inspection methodologies have been proposed using imaging equipment and image processing. However, most of the existing methodologies evaluated their performance on a clean concrete surface with a limited area where other objects do not exist. Therefore, this paper proposes a 6-step framework for tunnel crack detection deep learning model development. The proposed method is mainly based on negative sample (non-crack object) training and Cascade Mask R-CNN. The proposed framework consists of six steps: searching for cracks in images captured from real tunnels, labeling cracks in pixel level, training a deep learning model, collecting non-crack objects, retraining the deep learning model with the collected non-crack objects, and constructing final training dataset. To implement the proposed framework, Cascade Mask R-CNN, an instance segmentation model, was trained with 1561 general crack images and 206 non-crack images. In order to examine the applicability of the trained model to the real-world tunnel crack detection, field testing is conducted on tunnel spans with a length of about 200m where electric wires and lights are prevalent. In the experimental result, the trained model showed 99% precision and 92% recall, which shows the excellent field applicability of the proposed framework.

Mechanical Characteristics of Cementing Plane in Concrete Repair under Various Cementing Conditions (접합조건에 따른 콘크리트 접합부의 역학적 특성)

  • 김재동;정요훈
    • Tunnel and Underground Space
    • /
    • v.13 no.5
    • /
    • pp.362-372
    • /
    • 2003
  • Since the occurrence of Portland cement, a great number of concrete structures were constructed. But the concrete structures have their own life times, which inevitably demand repairing treatments, especially on their surface parts. Currently many various methods have been developed and are being applied fer this purpose. In this study, a newly developed method using pneumatic chipping machine and anchor pin was adopted far repair of old concrete structure and the mechanical characteristics of cementing plane between existing and new concrete were tested. Comparing the removal methods for the decrepit part of existing concrete using pneumatic chipping machine and hydraulic breaker, the peak cohesion was higher when using chipping machine at the cementing plane. On the other hand, the residual cohesion was higher for the case of breaker. Step shaped chipping on the cementing plane was effective in increasing peak cohesion, which results 14% increase in the case of 30 mm step height and 22% in 50 mm height when compared with planar chipping plane. The use of anchor pin increased the residual cohesion, which restricted shear slip on the cementing plane after peak shear stress and the tensile strength of 32% compared with that of non-anchored case. According to the combined effect of step shaped chipping of 30 mm and anchor pin with an interval of 15 cm, the peak cohesion reached up to 77% and the residual cohesion showed 180% of the ones of the fresh concrete, respectively.