The Improvement of Curtain Wall Design Process using Value Stream Mapping Tools (VSM기법을 활용한 커튼월 공사의 설계 프로세스 개선)

  • Kim, Chang-Duk;Lee, Sang-Hyuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.128-137
    • /
    • 2006
  • This paper is to develop curtain wall process life-cycle system in high-rise buildings in order to establish effective cooperation communication channels among the diverse constituents. This paper is to provide a base toward a curtain wall life-cycle management system to support decision making and the effective flow in light of information and materials. The four objectives of the research are 1) the analysis of the current curtain wall life-cycle process, 2) the analysis and development of the curtain wall design process As-Is model, and 3) the Muda analysis of the design process As-Is model and the suggestion of the improvements, 4) the development of curtain wall design To-Be model and comparative analysis of the improvement in terms of value streams. This research indicates the wastes decrease (or the values increase) from 6.7% up to 100% in different decision criteria through the improvement by the comparative analysis between the As-ls and To-Be curtain wall design process. This research suggests the potential improvement by VSM and a curtain wall life-cycle management system in curtain wall construction for diverse constituents be significant.

A Study on the Development of the Structural Performance Evaluation Manual of the Skyscrapers Curtain Wall Systems for Construction Managers (초고층건축 알루미늄커튼월 구조설계검토 프로세스와 매뉴얼 개발에 관한 연구: 멀리언과 트랜섬을 중심으로)

  • Cho, Ye-Won;Lee, Min-Cheol;Ock, Jong-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.3
    • /
    • pp.92-101
    • /
    • 2009
  • The purpose of this study was to develop the curtain-wall structure design evaluation manual that can easily examine the curtain-wall structural members (Mullion and Transom) stability from the position of the construction managers. Through analyzing the structural design reports in the previous studies and interview with industry experts, the curtain-wall structural member design process was elicited. The manual, which consists of Microsoft Excel-based work sheet and its manual, was applied to a real curtain-wall design project to make sure its usability. A workshop with three curtain-wall experts and three construction managers was conducted to identify pros and cons of the manual, thereby enhancing its applicability in the future.

Application of Supply Chain Management Concept to the Various Types of Curtain Wall Construction (커튼월의 공법 및 조달 유형에 따른 SCM 적용방안)

  • Moon Woo-Kyoung;Yun Soo-Won;Kim Yea-Sang;Chin Sangyoon;Park Ji-Hoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.612-615
    • /
    • 2004
  • Today, the curtain wall is used in many construction projects because of excellent economical efficiency and constructability. The life-cycle process of curtain wall construction consists of the architectural design, curtain wall design, manufacturing, const겨ction, and maintenance phase which has become one of the most important objects that have to be managed. Since the general management method focused on each separated phase, it has accompanied many problems such as increases of the cost and duration, and loss of productivity. To solve these problems, it is necessa교 to have a new management method based on supply chain management. Thus this research analysed the processes of stick system, semi-unit system, unit system, and panel system classified by the type of the curtain wall, and suggested proper methods of application of SCM concept to each type of curtain wall construction.

  • PDF

A Study on the Safety Standard of Architectural Glass and Curtain Wall (국내외 건축용 유리 및 커튼월의 안전 기준에 관한 연구)

  • Kim, Ji-Yeong;Kim, Nam-Hyuk;Kim, Dong-Eun;Seo, Dong-Goo;Kwon, Young-Jin
    • Proceedings of the Korea Institute of Fire Science and Engineering Conference
    • /
    • 2010.04a
    • /
    • pp.163-167
    • /
    • 2010
  • 최근 건축물의 초고층화에 따른 커튼월 시공에 따라 유리의 비중이 증가하고 있다. 커튼월 구조는 바람, 지진 등에 취약하며, 화재 안전성에 있어서도 취약할 것이라 판단되므로, 국내외 건축용 유리 및 커튼월의 안전기준에 대한 조사를 실시하였다. 그 결과 국내의 유리 기준은 단열 및 내풍압 성능에만 집중되어있으며, 화재 및 지진, 안전성능에 대한 기준이 미비하며, 커튼월에 대한 안전대책은 전무한 실정이다. 따라서 외국의 사례와 같이 초고층에서 커튼월의 안전성능을 고려한 설계프로세스나 안전 기준의 세부화가 필요하다고 판단된다.

  • PDF

A Study on the Condensation Performance of The Curtain-walls (커튼월 결로 성능평가에 관한 연구)

  • Lee, Sang-Jin;Ock, Jong-Ho;Kim, Sung-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.808-812
    • /
    • 2008
  • Recently, the buildings have been likely to shape Super Tall trend. Therefore, the exterior parts of the buildings come to be changed. Instead of early heavy wall structure, it is changed to light wall concept of curtain wall system. However, the curtain wall system causes lots of loads due to the external surrounding factors of building. In particular, due to the densely built-up condition in Korea, the generation of dew condensation is getting severer Since there has been no standardized process that reviews this generation of dew condensation, it is very urgent for us to prepare the reviewing process for the dew condensation for construction business managers. The purpose of this study is to assess dew condensation function of the curtain wall and provide the basic data for the provision of the future dew condensation review process by comparing and analyzing the range of generation of dew condensation as well as temperature distribution according to the change of relative humidity at the identical temperature by selecting the Unitized system and Stick system which are the representative types of curtain wall system.

  • PDF

An Extraction of Inefficient Factors and Weight for Improving Efficiency of the Curtain wall Life Cycle Process (커튼월 Life Cycle Process의 효율성 향상을 위한 비효율 요인 밑 중요도 도출)

  • Jung Soon-Oh;Kim Yea-Sang;Yoon Su-Won;Chin Sangyoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.101-112
    • /
    • 2005
  • Recently, a curtain wall construction is a exterior finishing components which is most used for shortening time in high-rise building as well as the class of key management factors in cost and schedule control. Also, it is recognized that an effective management for curtain wall process is a major subject to accomplish the project successfully. However, as the current management for curtain wall construction is focused on the construction stage, it makes problems such as errors in business performance, rework by mistakes and duplications, errors and omissions by ineffective information management and there has never been any efficient management from a view of the entire Curtain Wall Life-cycle process. Therefore, the aim of this study is to suggest a stage check point for process improvement in the curtain wall Life-cycle process through current curtain wall process analysis, and then to investigate the cause of waste factors using the Muda method from the Toyota Production System and extract the weighted effects of the waste factors using the analytical hierarchy process method. According to the result, Most of the inefficient factors happened in architectural design stage of the entire curtain wall Life-cycle process and my research identified that detail factors of them are a delay of decision making and an approval in changes, a deficit of engineering capacity and a delay of approval in architectural design drawings by owner, etc.

The Approach Methods of Improvement of Safety Standard for Architectural Glass and Curtain Wall (국내 건축용 유리 및 커튼월의 안전 기준 개선 방향에 관한 연구(II))

  • Seo, Yoon-Jeong;Seo, Dong-Goo;Shin, Yi-Chul;Kim, Dong-Eun;Kwon, Young-Jin
    • Proceedings of the Korea Institute of Fire Science and Engineering Conference
    • /
    • 2010.10a
    • /
    • pp.25-28
    • /
    • 2010
  • 최근 건축물의 초고층화에 따른 커튼월 시공에 따라 유리의 비중이 증가하고 있으나 커튼월 구조는 바람, 지진, 화재에 있어서 취약할 것이라 판단되어 국내외 건축용 유리 및 커튼월의 안전기준에 대한 조사를 실시하였다. 그 결과, 국내의 유리 기준은 단열 및 내풍압 성능에만 집중되어있으며 화재 및 지진, 안전 성능에 대한 기준이 미비한 실정이다. 따라서 국내에 적합한 유리 안전성 평가 프로세스를 구축하기 위한 기초 데이터를 마련하기 위해 유리 내화 실험을 시행하였다. 실험 결과, 일반유리, 복층유리, 강화유리, 접합유리 순의 파열 시간을 가지는 것을 알 수 있었으나 시험체 4개가 화재 초기에 파열되는 것으로 나타나 상층부로의 수직 화재 확대 위험성이 높을 것으로 판단된다.

  • PDF

A Study on the Application of Supply Chain Management in Curtain Wall Engineering (커튼월 공사에서의 공급사슬관리 적용에 관한 연구)

  • Park Sang-Woo;Park Sang-Jun;Kwon Won;Kim Chang-Duk;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.301-304
    • /
    • 2004
  • The curtain wall engineering of local high-rise buildings consists of many phases such as design, curtain wail design, manufacture, procurement, construction and facility management, each of which also involves many' actors such as architect, curtain wall consultants, manufacturers, contractors, and facility managers. Moreover, the method for controlling the C/W process of each participant is needed. Eliminating wastes and problems existed in the C/W process can be more effective. What is more, it is necessary to improve the efficiency of the current process and to strengthen the competence through application of SCM to the C/W life-cycle. In addition, it is important that a ]ot of information transfer smoothly and share through information system. Therefore, this study aimed to propose the scope of application and the improvement directions in applying Supply Chain Management concept.

  • PDF

Automated Life-Cycle Management System Based on SCM for Super High-rise Buildings Construction (SCM기반 Automated Life-Cycle Management System 구축방안 - 초고층 빌딩 커튼월을 중심으로 -)

  • Yoon Jeong-Hwan;Kim Yea-Sang;Chin Sang-Yoon;Kim Chang-Duk;Choi Yoon-Ki;Chun Jae-Youl;Lim Hyung-Chul
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.430-433
    • /
    • 2003
  • Cost, schedule, quality are the essential parts of success of every construction project. It is especially true in high-rise building construction. Among the construction components in high-rise building construction, curtain walls are very important elements for the project success because they take large portion of cost and schedule. However, curtain wall construction process are very complicated, where many entities including designers, suppliers, contractors and even maintenance contractors are involved. Therefore, control and management of their relationships and production process are critical. It is suggested that this can be solved by the concept of Supply Chain Management which is supported by the automated information technology with Radio Frequency Identification. Such concept is defined as 'Automated Life-Cycle Management System Based On SCM' and this study suggests rode map to establish the system.

  • PDF

A Productivity Analysis Method of Curtain Wall Works Using Construction Simulation (건설 시뮬레이션을 활용한 커튼월 적층공법의 생산성 분석방안)

  • Park, Dong-Geun;Lee, Kyung-Suk;Yu, Byung-In;Kim, Young-Suk;Han, Seung-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.256-261
    • /
    • 2008
  • The curtain-wall work has been more frequently applied in the construction industry since demand of high-rise buildings has been increased. The curtain-wall work is usually performed with the frame work simultaneously for reducing construction period, but it might be delayed because of several problems caused by interference of process. However, there is not an appropriate tool which can be used by a work manager for adjusting quantity of the construction equipments or the workers when the curtain-wall work was delayed. To resolve this problem a construction simulation anticipating and analyzing potential problems before starting the work can be applied in the curtain wall work. This research suggests a general model for the curtain-wall work by using construction simulation and produces a combination of construction equipments and workers which can estimate optimum work productivity.

  • PDF