Browse > Article

The Improvement of Curtain Wall Design Process using Value Stream Mapping Tools  

Kim, Chang-Duk (광운대학교 건축공학과)
Lee, Sang-Hyuk (광운대학교 건축공학과)
Publication Information
Korean Journal of Construction Engineering and Management / v.7, no.5, 2006 , pp. 128-137 More about this Journal
Abstract
This paper is to develop curtain wall process life-cycle system in high-rise buildings in order to establish effective cooperation communication channels among the diverse constituents. This paper is to provide a base toward a curtain wall life-cycle management system to support decision making and the effective flow in light of information and materials. The four objectives of the research are 1) the analysis of the current curtain wall life-cycle process, 2) the analysis and development of the curtain wall design process As-Is model, and 3) the Muda analysis of the design process As-Is model and the suggestion of the improvements, 4) the development of curtain wall design To-Be model and comparative analysis of the improvement in terms of value streams. This research indicates the wastes decrease (or the values increase) from 6.7% up to 100% in different decision criteria through the improvement by the comparative analysis between the As-ls and To-Be curtain wall design process. This research suggests the potential improvement by VSM and a curtain wall life-cycle management system in curtain wall construction for diverse constituents be significant.
Keywords
Value Stream Mapping(VSM); Curtain Wall Process; Muda; Wastes; Curtain Wall Design Process;
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 신봉수(2003), '건설공사의 적시생산(Just-In-Time)을 위한 양중시스템 개발', 한국건설관리학회논문집, pp182-191
2 Lindfors(1999), 'Value Chain Management in Construction', IGLC-7
3 Mike Rother and John Shook(1999), 'Learning to See', version 1.2, Lean Enterprise Institute, June
4 김창덕(2000),' 건설생산시스템의 새지평', 건축 3월호, 대한건축학회
5 김예상외(2005). '초고층 빌딩 Curtain Wall의 SCM 기반 Automated Life-Cycle Management System 구축'2차년도 연구결과 보고서, 한국건설관리학회 (과제번호 R&D/03-산학연 A01-01)
6 송영석외 2인(2001), '건설자재의 적시생산을 위한 관리 Point 운용 모델구축 방안', 대한건축학회 추계학술발표대회 논문집 구조계, 대한건축학회, 제 21권 제 2호
7 Arbulu and Tommelein(2002), 'Value Stream Analysis of Construction Supply Chains: Case Study on Pipe Supports used in Power Plants', IGLC-10
8 De la Garza JM(1994). 'Value of concurrent engineering for A/E/Ci Industry', Journal of Management in engineering, May/June
9 문정문외 2인(2002), '건설공정의 낭비제거를 통한 생산성 향상방안', 건설관리학회논문집
10 Womack and Jones(1996), 'Lean Thinking: Banish Waste and Create Wealth in Your Corporation', Simon & Schuster, New York, NY
11 이형수(2004), '건설공사의 자재관리 효율화를 위한 조달 및 양중시스템 기반구축에 관한 연구', 한국건설관리학회논문집, pp 133-139
12 김대영 외 1인(2003), '린 건설의 실무현장 적용 및 사례연구', 대한건축학회 논문집 구조계, 대한건축학회, 제19권 제4호
13 송상훈(2002), '건설현장 공사관리 프로세스 재설계', 서울대학교 건축공학과 석사학위논문
14 임형철(2003), '현장 공정 커뮤니케이션을 통한 공장생산자재의 공급 및 생산관리 방안에 관한 연구', 대한건축학회논문집, pp 144-152
15 김창덕(2000), 'A New Construction Production Paradigm', 광운대학교 건설관리연구실