A Study on Considering Non-Working Days for Determination Normal Project Duration in the Railway Bridgework Construction (철도 교량공사의 적정공사기간 산정을 위한 비작업일 산정에 관한 연구)

  • Chae, Su Min;Lee, Sang Hyuck;Park, Hyung Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.5
    • /
    • pp.601-608
    • /
    • 2021
  • Recently, despite a decrease in the number of working days and an increase in the number of non-working days due to an increase in the abnormal climate and the revision of the Labor Standards Act, a standard construction period reflecting this has not been established. For this reason, even if the appropriate construction period is calculated at the site, there is a situation where delays occur due to unexpected circumstances. Therefore, this study proposes a method of calculating the number of non-working days for railway bridgework construction that reflects changes in construction conditions and climate change and reflects this to railway bridgework construction, and the number of working days was calculated. As a result, the number of non-working days by region and month in Korea was derived, and through this, the necessity of regulations and standards for appropriate construction periods reflecting regional characteristics and characteristics of each construction type was presented.

교량용 건설기계의 운용 문제점

  • 최용호;손기상
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 2002.11a
    • /
    • pp.185-190
    • /
    • 2002
  • 교량 공사는 우선 한강다리 건설공사만 해도 그간 많은 완성과 실패를 뉴스매체를 통해 보고 있다. 고속철도 공단주도의 경부고속철도 건설을 위한 교량은 수상, 육상 등 모든 부분에 적용되어 있다. 기존 교량에 대한 교통량 증가로 확장공사가 이루어지고 있기도 하다. 교량은 산업기반 시설이 되므로 규모가 크고 인력보다는 대형 건설기계가 소요된다 한국산업안전공단의 조사보고서(2002. 6)에 의하면 토목공사에서 18.7%의 사고율을 점하고 있고, 이중도로 9.9, 교량터널 1.1%을 점유하고 있다.(중략)

  • PDF

Comparison of Girder Height and Construction Cost by Span in Various Types of Railway Bridge (철도교량형식의 경간에 따른 형고 및 공사비 비교연구)

  • Lee, Tae-Gyu;Oa, Seong-Wook
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.5
    • /
    • pp.471-476
    • /
    • 2008
  • The superstructure type of the railway bridge in our country, is mainly classified into the box girder and the I-type girder. The box girder is widely used in the high speed railway bridge because of the safety due to dynamic behavior. The I-type girder is used in the conventional railway bridge, and is also divided into the general type and the composite type, and the newly modified types have been developed. According to the current railway bridge design code, the girder design by the span length in various types of railway bridge is performed in is study. The suitable girder height and the construction cost by the span length are analyzed, and the comparative analysis of the structural efficiency and the economical efficiency is carried out. From this study, the composite type girder is appeared the good result in respect of the structural efficiency. However, in the economical aspect, the general I-type girder is required less cost than the other types.

고속철도 PC Box교량 잭업을 위한 교각코핑부 안정성 검토

  • 강진욱;이명섭;김진욱
    • Journal of the Korean Society for Railway
    • /
    • v.7 no.1
    • /
    • pp.51-56
    • /
    • 2004
  • 경부고속철도 제7-2공구 현장은 충청북도 영동군 심천면 초강리에서 영동읍 화신리에 이르는 총연장 10km의(182k800∼199k800) 고속철도 노반공사 현장으로서 총 연장 중 교량공은 3.6km, NATM터널 2.6km, 그리고 토공 3.8km로 구성되어 있다. 이중 교량공은 PC Box 연속교(2@40m, 2@25m, 3@25m 등)가 주를 이루고 있으며 가설공법으로는 현장타설공법인 FSM(Full Staging Method) 공법을 채택하였다. 교량의 받침 형식으로는 고정단에는 포트받침 그리고 가동단에는 탄성받침이 적용되었다(참조 : www.ktx7-2.wo.to). (중략)

A Study on Improvement of Maintenance System for Timber Sleepers of Ballast-less track on Railway Bridge (무도상 강철도 교량상 목침목 유지관리체계 개선방안에 관한 연구)

  • Choi, Jung-Youl;Shin, Tae-Hyoung;Kim, Sang-Jin;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.5 no.1
    • /
    • pp.389-394
    • /
    • 2019
  • In case of damaged timber sleepers, maintenance is carried out according to the track inspection standard. However, it is difficult to detect the extent of damage on the bridge, and maintenance is depended on inspector's judgment. In this study, we propose to improve the evaluation criterion of timber sleepers for the ballast-less tracks on serviced urban railway bridge. The timber sleepers on railway bridge was classified according to degree of damage, and damage scores were calculated for each damage grade. Also we have improved the maintenance system of the timber sleepers through the history management system of the individual timber sleepers on railway bridge. As a results, it was judged that systematic management of timber sleepers could be possible during maintenance.

Erection Method for Marine Section of Double Deck Warren Truss in Young Jong Grand Bridge (영종대교 복층 Warren Truss 해상구간 가설공법)

  • Kim Jeong-Woong;Seo Jea-Hwa;Yang Mu-Seok;Yuk Il -Dong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.232-239
    • /
    • 2001
  • Young Jong Grand Bridge is approach traffic road of New Inchon International Airport which covers hub airport function in northeast asia. The total span length of this bridge is $4,420{\cal}m$ and this main bridge type is, the first in the world, Double Deck Self Anchored Suspension Bridge, designed as double deck systems to be arranged by road and railroad. Approach bridges to be connected with main span also are composed double deck steel truss and steel box girder to consider a continuity with this span. Our company erected $1,375{\cal}m$(about 60,000tons) of double deck steel truss bridge type which is composed by 6 traffic lane on upper deck and 4 traffic lane and Double track railroad on lower deck. The original installation method of this bridge was planed to install about 75 meters bridge blocks to use floating crane, after temporary bent was constructed between permanent piers. But this method which had to construct many temporary bents in the sea had the matter that construction periods can become lengthen and construction cost can be risen. To overcome the uncertainty to ensure high qualify of bridge and economic project execution, our company developed new bridge erection method to assure both quality control and economic construction work. The new erection method which was developed by us was one that could transport and install long bridge block, $120{\cal}m$ unit at a time and that temporary bent was not required. We hope that this paper is used as technical data which will erect bridge in the western sea and others marine region.

  • PDF

A Study on the Dynamic Effect Influencing to Urban Railway Structures by Vibration from Near-field Excavating Work (근접장 굴착진동이 도시철도 구조물에 미치는 동적영향 연구)

  • Woo-Jin, Han;Seung-Ju, Jang;Sang-Soo, Bae;Seung-Yup, Jang;Myung-Seok, Bang
    • Journal of the Korean Geosynthetics Society
    • /
    • v.21 no.4
    • /
    • pp.41-53
    • /
    • 2022
  • In the excavation work like blasting/excavator work bordering on the urban railway, the dynamic safety of railway structures like tunnel, open-cut box structure and elevated bridge was investigated by numerical analysis in this study. The practically presented criteria on influential zones at the blasting work in the construction industry was numerically checked in cases of the precise vibration-controlled blasting (type II) and the small scale vibration-controlled blasting (type III) and it was shown that the criteria on blasting work methods needed to be supplemented through continuous field tests and numerical analyses. The influence of excavation vibration by mechanical excavators was especially investigated in case of earth auger and breaker. The numerical analysis of tunnel shows that the criteria on vibration velocities from the regression analysis of field test values was conservative. The amplification phenomenon of excavating vibration velocity was shown passing through the backfilling soil between the earth auger and the open-cut box structure. It was shown that the added-vibration on the superstructure of elevated bridge was occurred at the bottom of pile like earthquake when the excavator vibration was arriving at the pile toe. The systematic and continuous research on the vibration effect from excavating works was needed for the safety of urban railway structures and nearby facilities.

Planning and Design of Monorail Bridges (모노레일 교량의 계획 및 설계)

  • Han, Nock-Hee;Yoo, Je-Nam;Lee, Sumg-Min
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1174-1187
    • /
    • 2007
  • Monorail System has many advantages compared with other Urban Lightweight Transit Systems, such as the friendliness of the vehicle's appearance, slenderness of the bridge structures, it's low construction cost and short construction period. So, lots of city governments have reviewed or proposed the Monorail System as the attractive alternative system. And recently, Daegu Metropolitan City Government have chosen the Monorail System for the Urban Railroad Line 3. According to these trends on Urban Lightweight Transit Systems, this paper has introduced the outline of the planning and design of Monorail Bridges. At first, trends of overseas Monorail Bridges have been reviewed and the principal design criteria adopted in the basic design of the Urban Railroad Line 3 for Daegu have been introduced. And next, the methods of planning, design, fabrication of the guideway beams which are made of PSC Beam or Steel Beam have been explained. We hope this paper be helpful for the Engineers who are interested in the Monorail Bridges.

  • PDF

Analysis on the Current Status of Maintenance and Monitoring of the Bridge Across Seokdaecheon, Busan Metro Line 4 (부산도시철도 4호선 석대천 횡단 교량의 유지관리계측 현황분석)

  • Woo, Jong-Tae
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2022.10a
    • /
    • pp.349-351
    • /
    • 2022
  • 1차 안전기준은 안전한 공사관리를 위한 목표치이며, 2차 주의기준은 주변구조물이나 주민에게 안전에 영향을 미칠 수 있는 범위 값이며, 3차 정밀분석기준은 공사장 자체의 위험에 대비하는 기준을 의미 하므로 향후에는 계측항목별로 계측관리기준을 세분하여 적용하는 것이 필요하다.

  • PDF

The Evaluation of GHG Emissions in Railroad Construction Sector (철도건설의 온실가스 배출량 산정평가)

  • Lee, Jae-Young;Jung, Woo-Sung;Hwang, In-Hwan;Kim, Yong-Ki
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.3
    • /
    • pp.271-275
    • /
    • 2011
  • According to governmental policies for green growth, the increase in the traffic volume of railroad is a representative method to reduce total greenhouse gas (GHG) emitted from transport. Comprehensive assessment for the GHG emission of railroad has been studied to compare the difference of transport modes just in the operating step excluded the construction step. The purpose of this study was to evaluate GHG emissions in railroad construction sector. The targets were some construction works for civil, track, building, and electric system in A line. The GHG emission source of constructing railroad infrastructure was mainly the energy consumption of heavy equipments. As a result, the civil construction sector showed more than 96% of total GHG emissions and its specific GHG emission was 2.191 ton $CO_2e/m$. Also, the specific GHG emissions of civil construction works were of the order: earthworks > tunnels > bridges > station. In future, it will be required to calculate the overall GHG emission of railroad through life cycle approaches including operation, maintenance and disposal step.