Developing an Automatic System for Making a Placing Drawing and Quantity taking-off Cut and Bent Re Bar with Work Zone Information (설치 위치 정보를 포함한 배근시공상세도 작성 및 가공철근 자동 물량산출 시스템 개발)

  • Park, Hyeon-Yong;Lee, Seung-Hyun;Kang, Tai-Kyoung;Lee, Yoo-Sub
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.2
    • /
    • pp.63-70
    • /
    • 2008
  • Reinforcing steel work plays an important role in terms of its structural performance or weight of construction cost for reinforced concrete structures. Precise estimation of re-bar quantity gives a basis for managing the reinforcing steel work effectively. However, the estimation process is still performed ineffectively based upon the expert's experience or manpower in spite of the advanced technology or improvement efforts. Therefore, the purpose of this research is to develop a prototype system for taking-off the quantity of reinforcing steel bars quickly and accurately in an order consistent with the specific members identified on the drawings. An estimate algorithm considering the connection, settlement and coating thickness of re-bars was suggested regarding to their replacement conditions which places more emphasis on constructibility. Also, this system produces the shop drawings automatically with the calculation results with work zone information.

Development of the Rebar Auto Placing System Using 3D Structural Information Model (3차원 골조정보모델을 이용한 철근배근 자동생성 시스템)

  • Lee, Byeong-Kwun;Kim, Chee-Kyeong;Kim, Gye-Joong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2009.04a
    • /
    • pp.72-75
    • /
    • 2009
  • 본 논문에서는 현재 국내에서 구축되어 있지 않은 3차원 BIM 기반 설계 및 시공 환경으로의 패러다임 전환에 대비하여 3차원 BIM 지향적 구조설계 프로그램인 SDP 제품군을 사용하여 BIM 프로그램들을 연동한 3차원 BIM 철근배근 자동생성 시스템을 개발하고자 한다. 현재 국내 건설업계의 치열한 수주경쟁으로 수익률저하/철근 등 자제가 폭등/인건비 상승/배근시공도 작성 인력 부족 및 신뢰성 저하 및 납기 지연 등의 기존 현황의 문제점 등을 SDP 제품군을 이용하여 구조설계/배근시공도 작성/정밀 골조물량 산출을 통합 지원하는 엔지니어링 컨설팅 환경을 구축하여 구조설계 시 V/E 동시 수행, 골조공사비 10% 절감, 배근시공도 및 물량산출 납기 최소로 단축, 배근시공도 정확성 향상/설계 및 시공 변경에 신속 대응, 공정 대비 발주 물량 관리 기능을 제공함으로써 고수익, 고효율, 고품질 의 엔지니어링 컨설팅 수행이 가능하다. 3차원 BIM 을 기반으로 철근현장가공에서 공장가공 전환 가속화로 국가적 물량 절감을 기대할 수 있고, 3차원 BIM 구조설계 및 골조공사 환경 구축 및 기술 자립을 통해 건설시공 분야의 기술력 향상을 기대할 수 있다.

  • PDF

A Comparison of Quantity Take-Offs of RC Structures based on BIM (BIM기반 철근콘크리트구조의 물량산출 비교)

  • Yoon, Jong Deok;Cho, Hyun Sik;Lee, Jae Hong;Shin, Jae Yong;Kim, Eun Suk
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.33 no.1
    • /
    • pp.35-44
    • /
    • 2020
  • In the construction industry, there is a growing demand for the accurate calculation of the quantity take-off and construction budget at the design stage, and it is likewise important to grasp changes in the construction budget and quantity take-off if design alterations are made. In addition, lawsuits related to the quantity take-off and cost of construction are frequent; therefore, the calculation of these factors using building information modeling (BIM) has emerged as an alternative. However, existing 2D-based methods are still used more frequently than BIM-based methods for quantity take-offs and construction budgets. This is because of the lack of BIM experience of estimation workers and the absence of a national standard. However, from a designer's point of view, it is necessary to understand the quantity take-off and construction cost based on BIM and accurately create the design according to the budget. In this study, the quantity take-offs of concrete, rebar, and reinforced concrete structures (apartments) in Seoul and Yeongjong were compared with the quantity take-offs based on 2D and BIM methods. From the viewpoint of the designer, we aim to increase the accuracy of BIM-based quantity take-offs.

3D Rebar Placing and Drawing System (3차원 배근 설계 및 배근시공도 작성 시스템)

  • Lee, Byeong-Kwun;Kim, Chee-Kyeong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.529-532
    • /
    • 2010
  • 본 연구에서는 철근가격 급등과 배근시공도 작성 인력 부족에 대비하여 SDM# 제품군을 사용하여 이음/정착을 고려한 3차원 철근 배근 자동화 기술(RAP)로 철근 배근 자동생성 및 배근시공도 작성 시스템을 개발하였다. 최근 철근가격 급등으로 인한 공사원가상승/인건비 상승/배근시공도 작성 인력 부족 등의 기존현황의 문제점 등을 SDM# 제품군의 철근 배근 자동화 기술(RAP)을 이용하여 자동 철근배근/배근시공도 작성/정밀 골조물량 산출/인력절감/시공 정밀도 향상/골조 공사비 절감 등의 효과와 기존의 현장가공으로 인한 철근 손실률 8%를 공장가공을 적용함으로써 3% 수준으로 낮출 수 있어 5% 내외의 절감효과를 얻을 수 있다. 철근현장가공에서 공장가공 전환으로 골조물량 절감을 기대할 수 있고, 이음/정착/응력분포가 고려된 3차원 철근 배근 자동화 기술(RAP)을 이용하여 자동배근 알고리즘에 의한 배근시공도/가공도 작성 효율을 높이고, 기술 자립을 통해 건설시공 분야의 기술력 향상을 기대할 수 있다.

  • PDF

Estimating System for Concrete Bridge using 3D Bridge Information Models (3차원 교량정보모델에 기반한 콘크리트 교량의 견적 시스템)

  • Shim, Chang-Su;Kim, Deok-Won;Lee, Kwang-Myong
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2009.05a
    • /
    • pp.43-44
    • /
    • 2009
  • 3D bridge information models for a concrete box-girder bridge were built and a typical application example for the estimation linked with the 3D models was proposed. 3D geometry objects with PBS (product breakdown structure) were constructed using standard classification codes and 2D drawings. Information on the amount of materials according to the classification codes was utilized for the estimation system. A process for the estimation of concrete and rebars was developed and verified through the pilot test. Optimization of rebar fabrication was suggested as an additional function and was utilized for the cost reduction and standard fabrication.

  • PDF

Verification Method for Quantity Takeoff Results of Concrete Works using Design Drawing Information (도면정보 기반 건축공사 콘크리트 물량산출 성과물 검증방안 개발)

  • Lim, Haejin;Choi, Chang-Hoon;Han, Choong-Hee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.5
    • /
    • pp.20-28
    • /
    • 2020
  • In construction project, an error in quantity information immediately leads to an error in the quotation, highly reliable quantity calculation is required for successful performance of a project. But there is a difficulty in the current situation for the person in charge to review all calculation sheets for quantity review as the quotation work has to be performed in a short period of time. Accordingly, it is thought that a review plan is required to secure reliability on calculated results and the review plan should be able to be carried out within insufficient quotation periods. In the present paper, it is intended to present a plan that enables quantity to be reviewed with the minimum number of persons within the shortest period of time through an algorithm of calculating a verification quantity. The suggested algorithm allows the result of quantity calculation work carried out earlier based on 2-dimensional drawing to be compared, not with an accurate quantity, but within an error range.

Study on the Critical Threshold Chloride Content for Steel Corrosion in Concrete with Various Cement Contents (단위시멘트량이 다른 콘크리트 중에서의 철근부식 임계염화물량에 관한 연구)

  • Yang, Seung-Kyu;Kim, Dong-Suck;Um, Tai-Sun;Lee, Jong-Ryul;Kono, Katsuya
    • Journal of the Korea Concrete Institute
    • /
    • v.20 no.4
    • /
    • pp.415-421
    • /
    • 2008
  • Reinforced concrete starts to corrode when the chloride ion concentration which is the sum of included in concrete and penetrated from environments exceeds a certain level of critical chloride concentration. Therefore each country regulates the upper bounds of chloride amount in concrete and the regulations are different for each country due to its circumstances. In this study, the critical threshold chloride content according to unit cement amount is empirically calculated to propose a reasonable regulation method on the chloride amount. As a result, the critical threshold chloride content increases considerably according to cement content and it agrees with the established theories. The present regulations on total chloride amount 0.3 or 0.6 kg chloride ions per $1\;m^3$ of concrete does not reflect the influences of mix design, environmental conditions and etc. So it can be said that it is more reasonable to regulate the critical threshold chloride content by the ratio of chloride amount per unit cement content than by the total chloride content in $1\;m^3$ of concrete.

A Study on the Effective Calculation of Rebar QTO in the Early Design Phase through the Application of BIM Model (BIM 모델 활용을 통한 초기설계단계에서의 효율적인 철근물량 산출 방안 연구)

  • Lee, Jae-Cheol
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.5
    • /
    • pp.145-152
    • /
    • 2019
  • In this study, rebar QTO(Quantity Take-Off) was quickly produced from the BIM model prepared by Revit in the early design phase, and the available premium rates were quantitatively presented. For this purpose, the amount of rebar calculated using the BuilderHub, which specializes in calculating rebar QTO, was analyzed according to various factors such as member type, rebar diameter, building size, item type, and order length, and the effect of each factor on the rebar QTO was determined. In addition, the BIM model generated on Revit was used to establish parameters and processes required to produce rebar QTO, and proposed a rebar premium rate and a stirrup/hoop premium rate based on the BuilderHub output results. Through this study, it is expected that a rapid and efficient comparative evaluation of rebar QTO will be possible according to various structural design alternatives in the early design phase.

Basic study about Automatic Rebar Quantity Estimation Integrated with Structural Design Information (구조설계정보 통합 관리에 의한 철근 물량 산출 자동화 기초 연구)

  • Sung, Soojin;Lim, Chaeyeon;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.109-110
    • /
    • 2015
  • Estimation of rebar quantity may be used as an index to evaluate the economic feasibility of structural designs. However, when using the software to estimate the rebar quantity, there may be some limitations such as data loss caused by human errors and estimation delays caused by increased input time, since the information on arrangement of rebar is inserted manually. To solve the problems of such quantity estimation software, it is necessary to develop a method on automatic input/output of structural design information for quantity estimation and an algorithm for accurate estimation of rebar quantity. The purpose of this study is to improve the existing rebar quantity estimation by connecting with the database on information related to rebar estimation and the algorithm for rebar estimation, in order to develop an algorithm to estimate an accurate, net rebar quantity. The study result can be used as basic data for development of software for efficient structural designs and automatic framework estimation of buildings.

  • PDF

A Study on the Application of BIM for Reinforcement Concrete Structural Work (철근 콘크리트 공사에서의 BIM 적용 연구)

  • Ahn, Jae-Hong;Lim, Nam-Gi
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.1
    • /
    • pp.158-166
    • /
    • 2018
  • The application of the BIM for architectural and structural work accompanied many trials-and-errors on project based on BIM by this time Ten years have passed since BIM issued, but it is not activated. This study suggests ways to activate BIM for architectural and structural work. The reason for choosing the structure construction is as follows. Construction cost is a high proportion of structural construction cost. On the other hand, the number of related materials is small, and the first in the 3D modeling process is structure modeling. And build BIM-based Structural Database by quantity take-off. This study shows the applicability of BIM through practical cases. This study is expected to provide suggestion for the successful implementation of BIM-based projects.