• Title/Summary/Keyword: 철근물량산출

Search Result 27, Processing Time 0.038 seconds

Developing An Automatic System for Quantity Taking-off Cut and Bent Re-Bar and Making a Placing Drawing (가공철근 물량산출 및 배근시공상세도 작성시스템 개발)

  • Park, Hyeon-Yong;Lee, Seung-Hyun;Kang, Tai-Kyung;Lee, Yoo-Sub
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.358-363
    • /
    • 2007
  • Reinforcing steel work plays an important role in terms of its structural performance or weight of construction cost for reinforced concrete structures. Precise estimation of re-bar quantity gives a basis for managing the reinforcing steel work effectively. However, the estimation process is still performed ineffectively based upon the expert's experience or manpower in spite of the advanced technology or improvement efforts. Therefore, the purpose of this research is to develop a prototype system for taking-off the quantity of reinforcing steel bars quickly and accurately in an order consistent with the specific members identified on the drawings. An estimate algorithm considering the connection, settlement and coating thickness of re-bars was suggested regarding to their replacement conditions which places more emphasis on constructibility. Also, this system produces the shop drawings automatically with the calculation results.

  • PDF

An Effect Analysis of Subtracting Rebar Volumes in Reinforced Concrete Members on Quantity Take-off (콘크리트 내 철근 부피 공제가 물량산출에 미치는 영향)

  • Kang, Jong-Min;Kim, Seong-Ah;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.24-32
    • /
    • 2012
  • Reinforced Concrete is the most dominant structure type for buildings in South Korea. Reinforced Concrete is one of materials having the most cost and quantity at construction projects. It is important to manage concrete quantity so that the total project cost is not affected due to underestimate or overestimate of its quantity. Generally the concrete quantity is taken-off based on the volume of the space inside forms without subtracting volumes of rebar embedded, which cannot be considered to make quite accurate results. Resource waste and extra cost due to over or under estimate of quantity occur since they cannot estimate accurate quantity at practices. Therefore, the objective of this paper is to analyze the effect of the volume for rebars embedded in reinforced concrete members. By comparing the quantity based on the existing method with the one from BIM data, it was found that about 1~2% of quantity discrepancy was observed while the typical concrete waste rate is 1 % at the current practice.

Design and Implementation of the Quantity Surveying and Shop Drawing System for Structures (BIM 기반 골조 물량산출 및 도면생성 모듈의 설계와 구현)

  • Lee, Byung-Kwon;Kim, Chee-Kyeong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.132-135
    • /
    • 2011
  • 최근 설계 단계에서 설계품질 향상과 시공 단계에서 비용 절감을 효과를 기대하며 3차원 BIM 관련 기술에 대한 관심이 높아가고 있으며, 또한 부분적으로 기술 도입 효과가 나타나고 있다. BIM 기술은 크게 BIM 도구를 활용하여 설계정보를 디지털화하는 모델링 단계 기술과 BIM 모델로부터 설계 정보를 추출하여 업무 진행에 필요한 형태로 가공, 변환하는 정보 활용 기술로 구분하여 생각할 수 있다. BIM 기술에 대한 근자의 높은 관심에도 불구하고 실제 현장에 적용되어 가시적인 성과를 내는 데에 한계를 보이고 있는 이유 중 하나로 후자의 정보 추출 및 활용 기술의 범위와 완성도의 한계를 들 수 있다. 즉 많은 노력을 통하여 BIM 모델을 구축하더라도 이를 기반으로 물량산출, 도면 생성 등 가장 기본적인 업무조차도 현장에서 바로 사용할 수 있는 수준의 기능이 제공되고 있지 않다. 본 연구에서는 건축 골조를 대상으로 3차원 골조 모델을 이용하여 골조 물량, 특히 정확한 물량산출이 상대적으로 어려운 철근에 대하여 철근의 이음, 정착 등이 고려된 실행물량을 산출할 수 있는 시스템을 설계하고 구현하였다. 또한 3차원 모델을 기반으로 철근 배근시공도와 가공일람표를 관련 기준에 따라 정확히 자동 작성함으로써 골조공사가 효율적으로 수행되고, 특히 정확한 이음 및 정착과 가공 계획을 통하여 철근 손실율을 최소화함이 기대된다. 본 논문에서는 이러한 BIM 기반 골조 물량산출 및 도면생성 시스템과 관련하여 주요 시스템 설계 내용과 구현 결과에 대하여 기술한다.

  • PDF

A Study on the Algorithm for Framework Materials Calculation of the Reinforced Concrete (철근콘크리트조의 골조물량산출 알고리즘에 관한 연구)

  • Hong Chae-Gon;Kim Tae-Hui;Kim Sun-Kuk;Han Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.359-362
    • /
    • 2002
  • The construction industry from the research about materials calculate automation became accomplished plentifully. Material price calculate with application in the CAD plan is more quicker and accurate than with existing handy work. It gives a many effect in development of the research and estimation program against material calculate production automation with application of the CAD. But material calculate production uses an estimate program from generally a framework construction and the material calculate production work becomes accomplished. A thesis of the material calculate production methodology about a part of materials boundary condition from material calculate production work of framework construction is the actual condition which is insufficient. From the dissertation which it sees standardize the concrete, a concrete form a each part of materials calculate method from framework construction material calculate production. It standardize a part of materials agree with a condition of material calculate methodology which from a each part of materials boundary condition.

  • PDF

Implementation of Quantity Estimation Database based on Efficiency Analysis of Quantity Information about BIM(Building Information Modeling) of Reinforced Concrete Structure through the Case Study (사례연구를 통한 RC구조 BIM에서의 물량정보 효율성 분석기반 물량산출 데이터베이스 구축)

  • Cho, Young-Sang;Bae, Jun-Seo;Kim, Yu-Ri
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2009.04a
    • /
    • pp.513-516
    • /
    • 2009
  • 본 논문에서는 사례연구를 통하여 RC구조 BIM에서의 물량정보 획득의 효율성을 분석하고 이를 기반으로 BIM 프로세스 환경에서의 철근 및 콘크리트 물량산출을 위한 데이터베이스를 구축하여 현장 시공단계에서의 공정 및 물량관리의 협업단계를 가능하도록 하는 철근 Sorting 시스템에 대한 연구를 목적으로 한다. 기존의 건설, 건축분야에서의 정보는 기호적 언어와 2차원 기반의 도면 정보체계를 통해 표현되었지만, BIM 기술을 통해 건물의 실제 형상과 정보를 가지는 3차원 기반의 정보체계로의 변화와 함께 컴퓨터 데이터베이스 내에서 프로젝트에 포함된 모든 정보를 저장하고, 다양한 형태로 필요에 따라 정보를 표현할 수 있게 변화하고 있다. 견적 및 시공을 위한 RC구조설계단계에서의 배근 모델은 협업을 위한 객체 정보의 획득 및 추출이 중요하지만 현재 상용되고 있는 BIM도구에서는 현재까지 미흡한 체계를 이루고 있다. 본 논문에서는 구조설계를 기반으로 배근된 BIM 구조모델 사례를 통하여 기존 BIM도구에서의 물량 정보획득 효율성 분석을 기반으로 객체들의 데이터베이스 구축을 통한 철근 Sorting 시스템 구축 연구를 통하여 협업단계에서의 체계적 물량정보 관리를 가능하도록 하였다.

  • PDF

Design and Implementation of ConiForm for the Construction Management of Structures (골조공사 관리시스템 ConiForm의 설계와 구현)

  • Lee, Joon-Seok;Kim, Hyeon-Jeong;Kim, Chee-Kyeong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.101-104
    • /
    • 2010
  • 본 논문에서는 구조설계, 철근배근시공도 작성, 골조 물량 산출, 3D BIM 모델 생성 등 기존에 독립된 업무로 수행되던 골조공사 관련 엔지니어링 업무를 통합 수행하는 골조공사 관리시스템 ConiForm을 개발하여 2차원 CAD로부터 3D 골조모델 생성하고, 3D 모델로부터 철근의 이음/정착/철근길이 등을 반영한 철근배근시공도 및 가공도 작성과 골조물량을 산출하여, 3D BIM 도구와의 연동함으로써 정밀 물량 및 견적을 자동 산출하고 건축모델과 구조모델 간 정보공유 및 통합 BIM 실현 등을 제시하고자한다.

  • PDF

Establishment of Rebar Quantity Estimation in BIM-based Initial Design Phase (BIM기반 초기 설계 단계 철근 물량 산출 프로세스 구축)

  • Song, Chi-Ho;Kim, Chee-Kyeong;Lee, Si Eun;Choi, Hyunchul
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.29 no.5
    • /
    • pp.447-454
    • /
    • 2016
  • In the meantime, looking at the present status of how to estimationte the quantity of rebar based on 3D BIM getting the limelight in these days, commercial BIM tools provide rebar modeling functions however it takes a vast amount of modeling time for modeling of rebar in use of that function hence there is no BIM software at present for practical use. Therefore, in this study, we organized and presented a practical rebar quantity estimationtion process in BIM-based design work-site and intended to develop a program named Rebar Automatic Arrangement Program - hereinafter called RAAP - which enables automatic rebar arrangement based on much more precise cross-sectional information of bars in column, beam, slab and wall than the one from existing 2D method under the conditions without any cross-sectional information in the initial design phase. In addition, we intended to establish rebar quantity estimationtion process in the initial design phase through interworking of modeling & quantity estimationtion functions in consideration of joint, anchoring length of BuilderHUB as a BIM software with RAAP. The results from this study are practical in developing a technology that is able to estimationte quantity with more improved reliability than the one from existing 2D-based methods with less effort when the quantity of framework is estimationted in the uncompleted state of cross-sectional design for structural members in the initial design phase of a construction project. And it is expected that it could be utilized as a basic study from which a reasonable quantity estimationtion program can be established in the initial design phase.

Automatic Algorithms of Rebar Quantity Take-Off of Green Frame by Composite Precast Concrete Members (합성 PC부재에 의한 그린 프레임의 철근물량 산출 자동화 알고리즘)

  • Lee, Sung-Ho;Kim, Seon-Hyung;Lee, Goon-Jae;Kim, Sun-Kuk;Joo, Jin-Kyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.118-128
    • /
    • 2012
  • As the bearing wall structure, which has been widely applied to domestic apartment buildings since the 1980s, cause many problems during remodeling of buildings, the government encourages constructors to adopt flat plate or rahmen structure through legal incentives. In line with such a trend, the green frame, an eco-friendly rahmen structure that has removed the shortcomings of previous structures, was developed to enhance structural safety, constructability, and eco-friendliness. The construction of green frame can reduce the labor cost and facilitate the composition of iron bars to reduce rebar loss through calculating the quality and establishing the bar bending schedule automatically on the precast concrete member data collected over the design phase. Therefore, the purpose of this study is to develop the algorithm to automate the calculation of iron bar volume for the green frame designed on composite precast concrete members. Automated algorithm to calculate concrete structural design information and design information. Practices through the application site should prove efficacy. The database established by the developed algorithm will automate the establishment of iron bar processing map and bar cutting list and the calculation of optimal composition and order volume to minimize the rebar loss. This will also reduce the expenses on management staff and overall construction cost through the minimization of rebar loss.

Developing an Automatic System for Making a Placing Drawing and Quantity taking-off Cut and Bent Re Bar with Work Zone Information (설치 위치 정보를 포함한 배근시공상세도 작성 및 가공철근 자동 물량산출 시스템 개발)

  • Park, Hyeon-Yong;Lee, Seung-Hyun;Kang, Tai-Kyoung;Lee, Yoo-Sub
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.2
    • /
    • pp.63-70
    • /
    • 2008
  • Reinforcing steel work plays an important role in terms of its structural performance or weight of construction cost for reinforced concrete structures. Precise estimation of re-bar quantity gives a basis for managing the reinforcing steel work effectively. However, the estimation process is still performed ineffectively based upon the expert's experience or manpower in spite of the advanced technology or improvement efforts. Therefore, the purpose of this research is to develop a prototype system for taking-off the quantity of reinforcing steel bars quickly and accurately in an order consistent with the specific members identified on the drawings. An estimate algorithm considering the connection, settlement and coating thickness of re-bars was suggested regarding to their replacement conditions which places more emphasis on constructibility. Also, this system produces the shop drawings automatically with the calculation results with work zone information.

Algorithm for the Reinforced Concrete Framework Materials Take-off (철근콘크리트조의 골조물량산출 알고리즘)

  • Kim Tae-Hui;Hong Chae-Gon;Kim Sun-Kuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.1 s.13
    • /
    • pp.114-121
    • /
    • 2003
  • The precise quantity of materials is not yet taken off by the CAD system although it has Influenced in design productivity and automatic estimate. And various estimate systems developed so far deal with the quantity take-off of building members separately, which caused to over-estimate the part of each member. Therefore, the purpose of this paper is to develop algorithms of more precise estimate than that of current estimate by solving boundary conditions of the connection parts of building members, such as column, girder, beam, wall and slab. The algorithms are proposed to take off the quantity of concrete and form work and they will be used for the estimate of building structure more precisely and automatically than ever.