The Improvement Plan of Design Process by Case Study of Steel Structural Work (현장조사를 통한 철골공사 설계프로세스 개선방안)

  • Bang, Sung-Won;Kim, Jin-Ho;Lim, Nam-Gi
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.2
    • /
    • pp.111-118
    • /
    • 2003
  • Steel frame construction is divided into subsidiary materials with column, beam, girder and bracing. After these are processed in factory for using installing in construction field. These prefabricated furniture is very important in accordance with design drawing about processing and prefabricating. In the case of design process using information transmission in blueprint, omission of material number, processing measure and finishing material, or discordance of each structure drawing and selecting incongruent structural material generated an error in the process of design. These error caused delaying time and increasing cost and increasing safety accident in the steel-structure work operating process. therefore, design process should consider problem of operating process.

The Improvement Plan of Design Process by Case Study of Steel Structural Work (철골공사 현장조사를 통한 설계프로세스 개선방안)

  • 방성원;오승준;김진호;임남기
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.05a
    • /
    • pp.121-126
    • /
    • 2003
  • Steel frame construction is divided into subsidiary materials with column, beam, girder and bracing. After these are processed in factory for using installing in construction field. These prefabricated furniture is very important in accordance with design drawing about processing and prefabricating. In the case of design process using information transmission in blueprint, omission of material number, processing measure and finishing material, or discordance of each structure drawing and selecting incongruent structural material generated an error in the process of design. These error caused delaying tine and increasing cost and increasing safety accident in the steel-structure work operating process. therefore, design process should consider problem of operating process.

  • PDF

A case study on the resource management of the steel structure construction project using RFID technology (RFID 기술을 이용한 철골공사 자재관리 사례분석 및 개선방안제시)

  • Park, Chang-Wook;Kwon, O-Cheol;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.04a
    • /
    • pp.93-96
    • /
    • 2007
  • Steel structure construction is the construction method which is plentifully used with reason of air shortening or the earthquake-proof efficiency improvement back. It is caused by with the feature which is a shop fabrication, it is more accurate than ferroconcrete construction when is a possibility of doing a materials supply and a crane work. From the research which it sees The instance analysis which uses the RFID it leads, A study is proposed an improvement plan of the RFID technology and an application plan of GPS.

  • PDF

Design and Implementation of Real-Time Progress Management System Using UML (Unified Modeling Language) - The Focus on Steel Structural Construction - (UML을 이용한 실시간 진도관리 시스템의 설계 및 구현 - 로봇 크레인 기반 철골공사를 중심으로 -)

  • Park, Jung-Lo;Kim, Kyung-Hwan;Kim, Jael-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.163-166
    • /
    • 2009
  • All sorts of technique for schedule progress management is being developed recently, These can change and develop the abstractive concept model to a detailed model that describes the visual 3D image about a schedule plan. but, this technique is troublesome, because this requires the handwork by means of connection between 3D-CAD and scheduling Program. In this study, the process of real-time schedule progress control system using the integrated database by 3D-CAD object information system and schedule module is presented. This study present the process of a schedule progress management using UML, and the process of real-time schedule progress management using RFID system. Through this study, we want to realize the rapid generation of estimated schedule information and to simulate and analyze actual schedule information by real-time.

  • PDF

A Case Study on Controlled Explosive Demolition of Steel Frame Structure Using Charge Containers (장약용기를 이용한 철골구조물 발파해체 사례)

  • Park, Hoon;Nam, Sung-Woo;Suk, Chul-Gi
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2023.11a
    • /
    • pp.91-92
    • /
    • 2023
  • 본 논문에서는 노후화된 화력발전소를 해체하고 원래의 자연환경으로 복원하는 공사가 진행되는 가운데 화력발전소 내 대형 철골구조물 중 하나인 터빈동을 발파해체공법을 적용하여 해체한 사례이다. 두께 30mm의 철골 부재를 절단하기 위해 금속제트가 발생되는 전용 장약용기를 제작하였으며, 철골 부재의 두께가 30mm 이상인 일부 철골 부재의 경우에는 가우징을 이용하여 사전취약화를 실시하였다. 또한 구조물 내부에 있는 일부 철골 부재에 대해 kicker charge를 사용하여 붕괴거동에 영향을 미치지 않도록 하였다. 발파에 사용한 전체 장약량은 175kg, 전자뇌관 165개, 장약용기 124개를 사용하여 계획된 방향으로 점진붕괴되었으며, 주변 시설물에 피해 없이 발파해체를 완료하였다.

  • PDF

A Study on the Establishment of Construction Cost Estimation Standard of Underground Steel Construction through Field Survey (지하철골공사 공사비산정기준 마련을 위한 현장조사 연구)

  • Song, Taeseok;Han, Sangjun;An, Bangyul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.339-340
    • /
    • 2023
  • Steel construction is one of the commonly used methods in building construction due to its efficiency in terms of time and cost. In particular, the top-down method using steel frames is widely used in the construction of underground structures in urban areas to shorten the construction period. However, there is currently no standardized cost estimation for subway steel frame construction in Korea, causing difficulties in determining the expected cost. In this study, we aim to provide basic data for establishing a cost estimation standard for subway steel frame construction through on-site surveys of subway steel frame construction commonly used in urban areas.

  • PDF

Process Analysis & Evaluation for Steel Frame Fabrication Automation (철골조립공사 자동화를 위한 프로세스 분석 및 평가)

  • Kim, Baek-Joong;Cho, Hun-Hee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.04a
    • /
    • pp.155-158
    • /
    • 2007
  • The construction industry kept lower level of the technology and productivity improvement than any other kinds of industry. But in most analysis of previous construction work which promoted the productivity of construction, the analysis process has only developed by the economical efficiency or the time studies through work sampling in construction field, So We suggest motion analysis as a tool to solve these problems. Spacially, this study find out productivity improvement method of steel frame fabrication works with using motion analysis. If the result of this study were to be applied to the actual construction field, it will be of great help for Building Construction Automation.

  • PDF

A Study on the Process of Tower Crane Construction Planning in Steel Structure (철골공사에서의 타워크레인 양중계획 프로세스에 관한 연구)

  • Jung, Deok-Gi;Park, Jung-Lo;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.145-146
    • /
    • 2011
  • Lifting plan in conjunction with the overall construction plan will be established. It is being created by executive director of the Corporation and other such as an experienced site manager. But, written lifting plan based on the limited information and experience is causing some problems such as decreasing productivity, workability loss, delay. The reasons for the problems are lack of prediction of construction execution, inappropriate materials on the past performance, individual experience, limits of knowledge, lack of technical materials, shortage of advisor. Therefore, to solve the problems, we have to overcome the situation in which we depends on lifting planner's experience and intuition, limited information by accumulating objective and reliable materials. Because unorganized lifting plan will lower efficiency of lifting equipment and make reducing construction period difficult. In this study, influence factors on lifting plans will be derived through reviewing literatures and lifting plan cases. Derived influence factors will be classified as components and classes, classified influence factors are assessed suitability. Also, Decision making items are derived from the factors. Finally, tower crane lifting plan process will be suggested from the result.

  • PDF

A Study on the Priority Analysis of Work Delay Factors in Steal-frame Work using FMEA (FMEA를 활용한 철골공사 작업지연요인의 중요도에 관한 연구)

  • Lee, Hyun-Chul;Lee, Jae-Hong;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.91-101
    • /
    • 2009
  • The factors of uncertainty such as work delay could cause many problems, for example, increase of construction cost and terms of work, and the deterioration of quality. Because of these, the uncertainty risk is regarded as an important management factor to obtain the success of construction project. So, the systematic management plan about the uncertainty factors is needed because it plays an important role in the completion of entire project. And also analysis of some factors which can cause the work delay can be one way of improving construction project's certainty and making it competitive. In this reason, we have to make an effort to set a priority based on analysis of quantitatively numerical value about work delay factors to manage them effectively. Thus, this study aims to suggest the basic data for the effective management and prevention of work delay in steel-frame work which is progressive actively now, along with increasing of demand of high-rise buildings by analyzing each reasons of work delay factors and also by suggesting important management factors that are coded according to each construction work using FMEA method which could give a data about the importance of work delay factors through quantitatively numerical value.