Criteria for the Float Distribution (여유시간 분배기준에 관한 연구)

  • Lee Gul-Chan;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.509-512
    • /
    • 2003
  • The Critical Path Method(CPM) is an effective tool used for planning and scheduling. One of strong point in the CPM is what can calculate float. Float is able to prolong without having an effect on overall schedule of project, however concept and scope about ownership is not definite, because it is a by-product of project. Thus participants have had many dispute in using float because of their interests. In recent years, a few theories have evolved in an attempt to solve this problem. But the prior research did not make a reasonable distribution of float because their criteria of distribution was based on ratio for total project time. Actually, an application of float is achieved by participant's delay risk. Therefore. this paper proposes criteria for float distribution using delay risks, and the framework for the assessment of the delay risks.

  • PDF

The Sensitivity Analysis for LRV Opening Pressure in CANDU (중수로 원전에서 액체방출밸브의 개방압력에 대한 민감도평가)

  • Kim, S.M.;Kho, D.W.;You, S.C.;Kim, J.H.
    • Journal of Energy Engineering
    • /
    • v.24 no.2
    • /
    • pp.40-44
    • /
    • 2015
  • Sensitivity on the reactor safety was evaluated for the safety margin and time delay applied to the opening pressure of liquid relief valve(LRV) of the primary heat transport system(PHTS) in the pressurized heavy water reactor(PHWR) type nuclear power plant. Since the LRV is the pressure boundary for the PHTS in the safety analysis, the operating of LRV has a significant effect on the safety analysis results. Therefore it is required during the regulatory review of Wolsong Unit 1 safety analysis to find the safety effect of the application of safety margin and time delay to the LRV opening pressure for the safety analysis of PHTS pressurizing events.

A Study on the Delay Adaptive Traffic Scheduling for QoS of Traffic Type (트래픽 유형에 따른 QoS 보장을 위한 지연 적응적인 스케줄링에 관한 연구)

  • 이상호;오영환
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.25 no.12B
    • /
    • pp.1988-1995
    • /
    • 2000
  • ATM 망에서 제공되고 있는 음성, 영상, 데이터와 같은 다양한 서비스는 사용자의 만족도를 수용할 수 있어야 한다는 것을 전제조건으로 한다. 이러한 기본적인 요구사항을 충족시키기 위해서는 노드대 노드간의 자원관리와 오류제어 및 다양한 트래픽의 특성을 고려한 전송 순서의 결정에 해당하는 스케줄링 방법이 요구되어 진다. 본 논문에서는 이러한 기술 요소 중에서 트래픽 설정 단계에서 제공되는 트래픽 특성 및 QoS(Quality of Service) 정보를 바탕으로 교환 노드에서 발생되는 전달 지연 시간에 적응적인 스케줄링 방식을 제시하였다. 이 방식은 멀티미디어 서비스와 같이 혼합된 트래픽 특성을 갖는 구조에서 트래픽 구성비율에 따라 적용되는 지연 여유치를 매우 융통성 있고 효과적으로 조절할 수 있다. 성능분석을 위하여 기존의 스케줄링 방식인 WFQ (Weighted Fair Queueing) 방식과 제안한 스케줄링 방식의 수학적인 분석을 수행하였으며 이 두 방식의 결과식을 비교하여 교환노드에서의 평균 지연과 셀 처리에 관한 성능을 분석하였다. 그리고 수학적 분석에 대한 검증으로는 Simulation tool ARENA 3.0을 이용하여 제안한 알고리즘의 Worst case와 기존의 알고리즘의 성능을 비교하였다.

  • PDF

An Offloading Decision Scheme Considering the Scheduling Latency of the Cloud in Real-time Applications (실시간 응용에서 클라우드의 스케줄링 지연 시간을 고려한 오프로딩 결정 기법)

  • Min, Hong;Jung, Jinman;Kim, Bongjae;Heo, Junyoung
    • KIISE Transactions on Computing Practices
    • /
    • v.23 no.6
    • /
    • pp.392-396
    • /
    • 2017
  • Although mobile device-related technologies have developed rapidly, many problems arising from resource constraints have not been solved. Computation offloading that uses resources of cloud servers over the Internet was proposed to overcome physical limitations, and many studies have been conducted in terms of energy saving. However, completing tasks within their deadlines is more important than saving energy in real-time applications. In this paper, we proposed an offloading decision scheme considering the scheduling latency in the cloud to support real-time applications. The proposed scheme can improve the reliability of real-time tasks by comparing the estimated laxity of offloading a task with the estimated laxity of executing a task in a mobile device and selecting a more effective way to satisfy the task's deadline.

Look-Angle-Control Homing Loop Design with a Strapdown Seeker and Single Gyroscope (스트랩다운탐색기와 1축 각속도계를 이용한 관측각제어 호밍루프설계)

  • Hong, Ju-Hyeon;Park, Kuk-Kwon;Park, Sang-Sup;Ryoo, Chang-Kyung;Cho, Han-Jin;Cho, Young-Ki
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.44 no.4
    • /
    • pp.324-332
    • /
    • 2016
  • In this paper, the terminal homing loop with a IIR-type strapdown seeker and a roll rate gyroscope is proposed. Basically, the proposed homing loop is based on the look-angle-control guidance. Since the range of the seeker is strictly limited, the missile is delivered to a point to lock the target on the seeker via non-guided flight during the midcourse guidance. The non-standard firing table is developed to compensate the wind and the target movement. To secure the delay margin is very important to prevent the instability of the homing loop when the time delay of the seeker is included. To validate the proposed homing loop, the 6-DOF nonlinear simulation is performed, and the Monte-Carlo simulation is also done for checking the robustness for the various kinds of uncertainty.

The Characteristics of Ground Improvement by Thixotropy in the Ground Surrounding by Sand Piles (Sand Pile 설치지반에서 틱소트로피에 의한 지반개량특성)

  • 천병식;여유현
    • Journal of the Korean Geotechnical Society
    • /
    • v.17 no.1
    • /
    • pp.99-107
    • /
    • 2001
  • 일반적으로 샌드파일 설치로 인해 파일주변지반은 교란되어 스미어 영향과 배수저항에 의해 압밀지연 현상이 발생하는 것으로 알려져 있다. 특히 예민한 점성토 지반일 경우 교란정도가 크며, 틱소트로피현상이 지연될 경우 지지력 및 압축특성은 불리하게 된다. 본 연구에서는 원지반 특성이 파악된 채취시료를 이용하여 완전 교란조건에서의 실내모형시험과, 염분농도변화에 의한 실내역학시험을 실시하였다. 실내모형시험 결과 낮은 하중단계에서의 압밀계수는 비교란 시료의 특성과 유사하게 나타났으며, 염분농도 증가에 따라 일축압출강도가 증가하고 강도회복은 빠르며 압축지수는 작게 나타났다. 결과적으로 점성토지반 간극수중 염분농도는 강도증대와 압축특성 변화에 영향을 주며, 틱소트로피 증대의 영향요소가 적은 담수지반에서 샌드파일을 시공할 경우 발생하는 과다침하의 한 원인으로 여겨지는바, 이와 같은 요인은 측방유동에 의한 침하거동과 함께 고려하여야 할 영향요소로 파악되어야 할 것으로 판단된다.

  • PDF

Critical Chain Project Management as a New Paradigm for Reducing the Project Delivery Time (프로젝트 일정 단축을 위한 새로운 경영 패러다임 Critical Chain Project Management(CCPM))

  • Jang, Seong-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.68-74
    • /
    • 2007
  • Critical Chain Project Management(CCPM) is a new project management system paradigm which maintains the advantages of PERT/CPM and improves the shortcomings of it. In CCPM the task durations are determined as 50% time estimates, ie average time discarding the their contingency. CCPM determines the critical chain the constraint of a projects considering the logical precedence relationship and resource conflict resolution. Project buffer is located at the end of critical chain to absorb the variations of critical chain. The size of project buffer is usually calculated as the half of the sum of critical chain length. Also feeding buffer is inserted after each non-critical chain which feeding into the critical chain to prevent the time delay of critical chain from uncertainties of non-critical chains. Resource buffer can be utilized to improve the availability of resources of critical chain. Buffer management is a project execution and control mechanism. Buffers are classified into 3 zones. They are OK zone, Watch and Plan zone and Expediting zone. If the project status is within Watch and Plan zone, contingency plan is established. And if it changes into Expediting zone, the preplanned contingency plan are executed to recover the time delay. In CCPM the workers are asked to work with relay runner work mechanism that they work fast if possible and report their completion to project manager for the succeeding task to start as soon as possible. The task durations are not considered as the promised time schedule. The multi-tasking is prohibited.

  • PDF

Buffered Routing Tree Construction under Buffer Location and Wiring Constraints (버퍼 삽입 위치 및 배선 제한을 고려한 Buffered 배선 트리 구성)

  • 정동식;김덕환;임종석
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.40 no.11
    • /
    • pp.73-82
    • /
    • 2003
  • In this paper, a simultaneous buffer insertion and routing method is proposed under the constraints of wire and buffer locations by macro or IP blocks. A new grid graph is proposed to describe the regions in which buffers(or both wires and buffers) are not available. Under this grid we describe a method of constructing a buffeted tree that minimize the maximum source to sink delay. The method is based on the dynamic programming with pruning unnecessary partial solutions. The proposed method improved the slack time of the delay by 19% on the average while using less buffers and similar wire length.

Attitude SCAS Design for 40% Scaled Smart UAV (40% 축소형 스마트 무인기 비행제어기 설계)

  • Lee, Jang-Ho;Hwang, Tai-Won;Choi, Ji-Young;Kim, Eung-Tai
    • Aerospace Engineering and Technology
    • /
    • v.6 no.2
    • /
    • pp.1-7
    • /
    • 2007
  • The control design for attitude and yaw rate of 40 % scaled SMART UA Vhas been performed. Analytic selection method for a control gain is proposed to meet the design specification of desired time response considering stability margin. The sliding mode attitude controller is also proposed and compared with the simulation results of a linear controller. Additionally, a velocity and height tracking controller is devised to prepar for the flight test.

  • PDF