• Title/Summary/Keyword: 지수조정율

Search Result 39, Processing Time 0.025 seconds

Improvement of contract sum adjustment method caused by price fluctuation using construction cost index (건설공사비지수를 활용한 물가변동에 의한 계약금액 조정방안 개선)

  • Cho Hun-Hee;Doe Geun-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.162-168
    • /
    • 2005
  • Index adjusted ratio method has been widely utilized in public construction sector for contract sum adjustment by price fluctuation. In this method, the Production Price Index are used for the base ratio, but the PPI can't reflect the character of construction project in respect of the selected items and weight. In this research we prove the problem of using the index adjusted ration method in contact sum adjustment by price fluctuation, and improve it by using the construction cost index, which has the property of construction project. And we figure out the efficiency of the proposed method by case study.

A Study on the Escalation Method for Contract Adjustment Public Construction Project (물가변동에 따른 계약금액 조정방식의 지수조정율 산출에 관한 연구)

  • Bae Kyoung-Tae;Choi Dong-Soo;Hwang Chi Won
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.11a
    • /
    • pp.117-120
    • /
    • 2005
  • The business market of architecture has got a system that controls a deposit according to the price function. This system is written on a law of contract about countries. So the main body of construction has to make a reasonable contract. This study is written about a rate of numerical index on controling a deposit. We tried to fine problems and solutions of labor expenses, instrument costs and material costs which is so big and changable on the construction market Labor expenses are expressed according to the rate of construction scale between direct and indirect cost that applies ability of works. Instrument costs are expressed according to an output method of a unit price annually and a weight allowance of local instrument conditions and use frequence. The last material costs expressed according to a local weight allowance make a decision of the material cost index. They applies locally relative index more than absolute one on what uses the price rate of producers and importations. This solutions are not enough to apply to the real market, so it needs to exam and to be on the market after a feasibility study.

  • PDF

A Study on the introduction of the outpatient and inpatient conversion factors in the 2020 Physician Fee Contract (외래⦁입원 환산지수에 기초한 2020년도 환산지수 산출 연구)

  • O, Dongil
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.4
    • /
    • pp.183-194
    • /
    • 2021
  • In this study, the conversion factor for 2020 is estimated based on an outpatient and inpatient conversion factor separation model developed from SGR and AR by using actual medical expense data. In addition, a policy plan is proposed to calculate the values of single and multiple conversion factors for each type of medical expense, and to effectively use the conversion factor separation model as one of the means to establish a medical delivery system. The major results are as follows. First, at r=0.1, the rate of adjustment in the hospital single conversion index in 2020 was 2.0%, and the outpatient and hospitalization conversion rates for hospitals were 2.2% and 2.3%, respectively. In addition, a combination of outpatient and inpatient conversion factors can be used for the adjustment. Second, as a measure to establish a medical delivery system, instead of adjusting the addition rate, a method of interlocking the addition rate and the conversion factor is proposed. Third, it is necessary to develop a model that enables target management of volumes, in addition to the outpatient conversion factor, the inpatient conversion factor, and the adjustment coefficient.

Improvement contract sum adjustment method caused by price fluctuation (물가변동에 의한 계약금액 조정방안 개선 기초연구)

  • Cho Hun-Hee;Seo Jang-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • v.y2004m10
    • /
    • pp.83-86
    • /
    • 2004
  • Index adjusted ration method has been widely utilized in public construction secter for contract sum adjustment by price fluctuation. In this method. the Production Price Index are used for calculating the base ratio. but the PPI can't reflect the property of construction project in respect of the selected item and weight structure. In this research we prove the problem of using the index adjusted ration method in contract sum adjustment by price fluctuation. and improve it by using the construction cost index. which has the property of construction project. And the result. we figure out the difference between the PPI and CCI by $6.7\%$ in maximum value.

  • PDF

GDP and MEI Influence on the Rates of Fee Change when Implementing SGR System in Korea (SGR제도 도입시 GDP와 MEI 변화가 환산지수에 미치는 영향)

  • 오동일
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.4 no.2
    • /
    • pp.57-62
    • /
    • 2003
  • In order to implement SGR in Korea, it is necessary to analyse the factors affecting the increase of Korea Medical Insurance Cost. GDP and MEI may substitute the diverse factors affecting the Medical Cost Uprise. In this article, the GDP and MEI influence on the rates of fee schedule is measured when we implement SGR System in Korea. The various cases are made to analyse the rates of fee change. In Korea, if we implement the SGR system successfully. we should make a considerate formula using GDP and MEI because the rate of change in GDP and MEI is much more bigger than that of U.S.

  • PDF

Regularized Modified Newton-Raphson Algorithm for Electrical Impedance Tomography Based on the Exponentially Weighted Least Square Criterion (전기 임피던스 단층촬영을 위한 지수적으로 가중된 최소자승법을 이용한 수정된 조정 Newton-Raphson 알고리즘)

  • Kim, Kyung-Youn;Kim, Bong-Seok
    • Journal of IKEEE
    • /
    • v.4 no.2 s.7
    • /
    • pp.249-256
    • /
    • 2000
  • In EIT(electrical impedance tomography), the internal resistivity(or conductivity) distribution of the unknown object is estimated using the boundary voltage data induced by different current patterns using various reconstruction algorithms. In this paper, we present a regularized modified Newton-Raphson(mNR) scheme which employs additional a priori information in the cost functional as soft constraint and the weighting matrices in the cost functional are selected based on the exponentially weighted least square criterion. The computer simulation for the 32 channels synthetic data shows that the reconstruction performance of the proposed scheme is improved compared to that of the conventional regularized mNR at the expense of slightly increased computational burden.

  • PDF

Improved Escalation Method for the Cost Estimation System using Previous Bid Price in Public Construction Projects (공공 건설공사에서의 실적공사비 적용에 따른 물가변동률 산정기준 개선방안)

  • Baek, Seung-Ho;Kang, Tai-Kyung;Lee, Yoo-Sub
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.1
    • /
    • pp.108-114
    • /
    • 2012
  • Escalation method examining the changes in price index has been widely utilized in public construction projects. The previous escalation method determined estimated changes in price based on the average unit price of contract items over a period of time. In relation to this method, the issue has been raised that the fluctuation rates of previous method show different trends compared with other related price indices, as the influence of the small group of contract items with large unit prices overwhelms the others. This research suggested an improved escalation method which estimates the fluctuation rate by examining the changes in CCI (construction cost index) and applies it to the total amount or the partial amount deducted for labor cost in price escalation for previous bid price method. To verify the improvement, a case study is conducted on an educational facility, and the fluctuation rate was estimated in two different base periods (short term, long term). The results over the long term showed similar tendencies to those of related price indices, as well as significant differences in fluctuation rates compared to those of the previous method.

단위노동비용(單位勞動費用)과 물가(物價)

  • Park, U-Gyu
    • KDI Journal of Economic Policy
    • /
    • v.11 no.4
    • /
    • pp.23-38
    • /
    • 1989
  • 본고(本稿)에서는 원화표시수입물가지수(貨表示輸入物價指數) 및 단위노동비용(單位勞動費用) 등의 비용요인(費用要因)과 GNP디플레이터로 표시한 물가(物價)와의 관계를 공적분검증방법(共積分檢證方法)으로 살펴보았는데 단위노동비용(單位勞動費用)과 물가간(物價間)에는 유의한 장기적(長期的) 균형관계(均衡關係)가 존재하나 이 관계식(關係式)에 수입물가지수(輸入物價指數)를 추가하기는 곤란한 것으로 나타났으며 수입물가지수(輸入物價指數)와 물가간(物價間)에도 유의한 장기적(長期的) 균형관계(均衡關係)를 발견하지 못하였다. 이에 따라 공적분(共積分)과 오차수정모형(誤差修正模型)을 사용하여 단위노동비용(單位勞動費用)만으로 인플레식(式)을 추정(推定)한 결과 그 적합도가 뛰어난 것으로 나타났다. 추정결과(推定結果)에 의하면 단위노동비용상승(單位勞動費用上昇)의 물가(物價)에 대한 영향은 영구적이며 최조 2년반 동안에 최대로 나타날 뿐 아니라 과도조정(過度調整)(overshooting)현상(現象)이 있는 것으로 나타났다. 이에 따라 비록 90년도의 임금인상(賃金引上)이 상당폭 둔화(鈍化)된다 하더라도 87년 하반기부터 시작된 단위노동비용급증(單位勞動費用急增)의 누적적 효과로 인하여 90년의 상당히 높은 인플레율은 불가피할 것으로 전망되었다. 마지막으로 이와 같은 물가상승압력(物價上昇壓力)을 완화하기 위해서 정책입안자(政策立案者)의 입장에서 본고(本稿)의 연구결과(硏究結果)에 대해 어떠한 해석이 가능한가를 논의하였는데, 정부(政府)의 정책입안자(政策立案者), 기업가(企業家) 및 근로자(勤勞者) 등 각(各) 경제주체(經濟主體)의 단합된 공동노력(共同努力)이 요구되는 것으로 지적되었다.

  • PDF

Kinetic Energy Rate of the Rain Drops Based on the Impact Signal Analysis (충격 신호 분석에 기반한 우적의 운동 에너지율)

  • Moraes, Macia C. da S.;Tenorio, Ricardo S.;Sampaio, Elsa;Barbosa, Humberto A.;dos Santos, Carlos A.C.;Yoon, Hong-Joo;Kwon, Byung-Hyuk
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.14 no.4
    • /
    • pp.743-754
    • /
    • 2019
  • The erosive potential of precipitation can be evaluated by the kinetic energy transferred to the soil by the impact of the rain drop. A kinetic energy rate of the rain drops was estimated by the disdrometer classifying impact signals. This equation in the form of power presented an adjustment measure between the rain rate and rainfall quantity of 97% and 95% for continental and maritime rains, respectively. The exponent of the power equation, initially, shows no dependence on the type of rainfall. However, the multiplicative factor presented variation, which can be adjusted according to rainfall events. This equation was validated by the coefficient of determination, the average absolute error and the confidence error. The kinetic energy of precipitation, associated to certain types of soil, will allow the determination of the potential of the erosion caused by the rains.