• Title/Summary/Keyword: 조달청

Search Result 130, Processing Time 0.023 seconds

A Study of the Improvement for the Contract Types and Contract Category of the Weapon Systems (무기체계류 계약형태 및 계약종류 개선방안 연구)

  • Kim, Ki-Taek;Park, Hong-Rae;Cho, Yong-Gun
    • Journal of the military operations research society of Korea
    • /
    • v.34 no.3
    • /
    • pp.13-29
    • /
    • 2008
  • The purpose of this study is to propose a model of the contract type and contract category in the process of programs in each stage which is the procurement by defence improvement program of a large long term programs. When requiring the contract, contractor confirms the contract type and contract category of the review the contract in bulk, separate contract by repeatedly. For the study of improvement method we used previous research paper, reports of DAP A and KIDA, laws of contract and other several materials. and we also applied the rational contract type and contract category for the general mass production program weapon system based on the analysis of contract states concluded with DAPA and old-DAPA, and collect the public opinions of the defense industry.

BIM Geometry Cache Structure for Data Streaming with Large Volume (대용량 BIM 형상 데이터 스트리밍을 위한 캐쉬 구조)

  • Kang, Tae-Wook
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.9
    • /
    • pp.1-8
    • /
    • 2017
  • The purpose of this study is to propose a cache structure for processing large-volume building information modeling (BIM) geometry data,whereit is difficult to allocate physical memory. As the number of BIM orders has increased in the public sector, it is becoming more common to visualize and calculate large-volume BIM geometry data. Design and review collaboration can require a lot of time to download large-volume BIM data through the network. If the BIM data exceeds the physical free-memory limit, visualization and geometry computation cannot be possible. In order to utilize large amounts of BIM data on insufficient physical memory or a low-bandwidth network, it is advantageous to cache only the data necessary for BIM geometry rendering and calculation time. Thisstudy proposes acache structure for efficiently rendering and calculating large-volume BIM geometry data where it is difficult to allocate enough physical memory.

Deduction or Importance Analysis for Pre-dispute Factors in the Constructions (건설공사 사전분쟁요인 도출 및 중요도 분석)

  • Park, Sung-Yong;Ko, Dae-Jun;Ha, Bong-Gyun;Yang, Jin-Kook;Lee, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.505-508
    • /
    • 2008
  • It's hard to express a lot of information within the drawings and the specifications as construction projects have gradually become large-size and complex. So, disputes are caused by that and reason that the usual practice(culture) of contract of the constructions in Korea is based on unfair rather than the fair principle between clients and contractors. However, the contractors don't try to solve this kind of things because they are worried about at their disadvantage situation. Therefore, this paper deduced the factors in the pre-dispute phase by analysing the cases of the civic counseling in the office of supply and the pre-dispute factors, and conduct analysis on the factors' importance by using AHP. The results will be used for a check-list to prevent the disputes.

  • PDF

A Feasibility Study to Adopt BIM-based Infrastructure Management System (BIM기반 사회기반 시설물 유지관리 도입을 위한 경제적 타당성 분석)

  • Kim, Jeonghwan;Ji, Seung-Gu;Jeong, Taehyung;Seo, Jongwon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.1
    • /
    • pp.285-292
    • /
    • 2014
  • BIM (Building Information Modeling) is a new paradigm that includes construction life-cycle, and BIM has become mandatory regulation according to the Public Procurement Service since 2016, which accelerates its application. BIM is now expand from architectural field to infrastructure industry. Through pilot projects, BIM has been challenged with verification process. This trend has affected to maintenance and operation (M&O) phase of construction life-cycle. Advanced country has already published their research and result with feasibility study and guidelines. In this paper, we conduct the feasibility study to adopt BIM-based infrastructure management system. Bridges and tunnels were selected as application target, and benefit/cost ratio were used. The result shows that BIM-based infrastructure management system is feasible when the level of detail is more than "Medium" in bridge, and "High" in tunnel.

A Study for Architectural Planning Direction to the Future School Facilities (미래 학교시설의 건축계획방향에 관한 연구)

  • Kim, Jae-Young;Lee, Jong-Kuk
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.16 no.3
    • /
    • pp.1-8
    • /
    • 2017
  • The study is a precursor to the final goal of organizing a future school building plan to prepare for the new paradigm. Planning direction presentation through planning elements and principles is key purpose. Based on the results of the study, it is meaningful that the school facilities will be able to fulfil the educational role of the school facilities, including science, technology, and environment. Based on the theoretical concepts of prospective school facilities and research data, the school plans to construct architectural plan elements and construct the architectural plan based on the guidelines of the school plan based on the evaluation criteria of the school building and the evaluation criteria based on the evaluation criteria of the school building and the calculation of the plan through the procurement criteria of the school and the Future Schools.

BSC Based Measurement of Satisfaction Degree For Based BIM Construction Projets (BSC를 기반으로 한 BIM프로젝트의 만족도 측정에 관한 연구)

  • Song, Mi-Rim;Yoon, Su-Won;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.4
    • /
    • pp.117-129
    • /
    • 2011
  • Building Information Modeling technology (BIM) is one of the most effective solutions to deal with the trend that buildings are getting more and more complicated, large-scaled, and multiple-purposed. BIM in the construction industry is increasingly adopted since the Korea Public Procurement Service announced that BIM would be obligated in a construction project whose total cost is over 50 billion won from 2012. This fact has boosted BIM related research projects as well. However, the majority of the studies have been focusing on the solutions with technological points of view and there has been lack of research on how much degree project stakeholders are satisfied with the BIM adoption in their projects. Therefore, the objective of this study is to investigate the current status and satisfaction degree of stakeholders in a synthesized point of view in BIM-based projects in order to identify critical factors and weak points in the BIM adoption process. The results of this study would greatly help to improve the strategies and processes in BIM-based projects as well as to increase the satisfaction degree of BIM utilization in a project.

On the Korea defense industry and defense procurement Liquidated Damages set upper limit research (국내 방산 및 군수조달분야의 지체상금 상한제 설정 방안 연구)

  • Min, Wonbae
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.17 no.4
    • /
    • pp.1034-1041
    • /
    • 2013
  • Liquidated Damages is damages that have to be paid when a debtor could usually work off that which they owe, but didn't due to causes imputable. However, currently the Defense Acquisition Program Administration contracts with domestic businesses in case of delay of implementation occurs; they have to pay damages of deferment unlimitedly as a penalty concept, not in compensation about delay. With this in account, conflicts between the two continuesly happen. DAPA wastes administration and counter business costs increasingly burdening their budget. Defense and military procurement need to revise the compensation of deferment system. This paper analyzes the problems about that system, which is applied to domestic business, and also compares it with that of industrialized countries and suggests measures of set price caps in compensation of the deferment system.

A Basic Study for Accumulation of IFC-based Schedule Information (IFC 기반의 공정정보 축적을 위한 기초연구)

  • Song, Jong-Kwan;Choi, Won-Sik;Won, Ji-Sun;Kim, Nam-Gon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.11
    • /
    • pp.5890-5896
    • /
    • 2013
  • This Study aimed at suggesting the plan for accumulating and utilizing schedule information of IFC file in BIM-based delivery system. For this Propose, First, literature review is conducted for analyzing utilization plan of schedule information and the IFC standard. Second, Schedule Planning process is analyzed to draw Schedule elements, and schedule information items is derived by analyzing schedule process and commercial software. Also, schedule elements in the IFC schema is derived by analyzing IFC schema through drawn schedule information. Finally, this study suggests a concept model accumulating and utilizing Schedule information included in IFC schema, and a conceptual delivery process of BIM model by analyzing BIM Application Guideline for Facility Project by PPS (Public Procurement Service) for accumulating IFC delivery files This study will expects to contribute to accumulate information of BIM model at the point of nationally introducing BIM.

A Study on Development Direction of MRO Industry for SMB (소모성자재산업 발전방향 연구)

  • Kim, Kyung-Ihl
    • Journal of Convergence Society for SMB
    • /
    • v.3 no.1
    • /
    • pp.49-55
    • /
    • 2013
  • This study is for preparation a solution develop small suppliers. For this goal survey for the buyers, agents, supplier's situation and difficulties, policy and support systems. And After benchmark the other's countries, develop government policy, suppoet systems. As a results, the support must be made for public organization, small suppliers. The Response direction must be made for agents and private buyers. At the point of support systems, public organizations must implement the purchase systems and provide the verified informations of suppliers. And it's necessary to educate marketing and sales solutions. At the point of Response directions, it's necessary to make a standard for supply replaced MRO. And the beginning positioning directions of MRO-mall is needed to stress the differentials with private suppliers.

  • PDF

Presumption Method for Optimum Correction Rate of Total Construction Cost Using the Median based on Historical Data Analysis in Public Office Buildings (공공건축물 실적자료 분석에 따른 중위수를 활용한 총공사비의 적정보정율 추정방법)

  • Yim, Jin-Ho;Park, Jun-Mo;Kim, Ok-Kyue
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.5
    • /
    • pp.415-422
    • /
    • 2014
  • There is growing difference between a planned value and an actual cost for increasing as an risk of construction cost. A construction cost index is an alternative to redeem a problem, but it is still very difficult to reduce an actual differential as a price fluctuation. Furthermore an existing theory of a construction cost index is overly complex, and is unsuitable for using in working-level. This study suggests an optimum correction rate in respect of a total construction cost. It is analyzing the actual cost of 53 public buildings that the Public Procurement Service ordered. The objects are main processes that include architectural works, mechanical works, electrical works, telecommunication works, and service facilities. It is compared a total construction cost based on absolute error rate using the median from frequentist principle. For this, it is selected the suitable regression model and set a correction rate.