• Title/Summary/Keyword: 제어 및 감시장치

Search Result 170, Processing Time 0.028 seconds

A Study to Develop a Multiple Container Transportation System (대용량 컨테이너 이송장치 기술개발 전략 연구)

  • Oh, Suk-Mun;Lee, Inmook
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.2
    • /
    • pp.638-645
    • /
    • 2014
  • This paper presents results of a study for development and application of container massive transportation system. The system is aimed to improve competing power of Korean container ports. This paper selects Double stack Multi-Trailer System (DMTS) under consideration of pros-con analysis between three systems alternatives as well as operation process of existing Korean container terminal companies. An analysis of turning radius is undertaken for applying the system. Key elementary technologies was derived by patent analysis. DMTS has no problems in utilization to existing Korean container ports. Further, the system is expected to highly potential to improve operational efficiency in the container ports thanks to its high unit transportation capacity.

The Development of Online Monitoring Module for The Battery of DAS (배전자동화용 축전지 온라인 감시모듈 개발)

  • Lee, Kuk-No;Song, Wan-Seok;Kim, Dong-Hyun;Lim, Han-Gyun
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.474-475
    • /
    • 2006
  • 배전자동화용 제어함 축전지 불량상태에서 외부전원 상실시 고장검출(FI) 및 원격조작 등의 자동화 운전이 불가능하여 광역정전 발생우려가 있으므로 이를 개선하기 위하여 축전지상태를 배전자동화 주장치에서 배전자동화 단말장치를 이용하여 온라인 상에서 종합적으로 계측 판단할 수 있는 축전지감시 모듈을 개발하였다.

  • PDF

The Development of Prototype Synchronized Phasor Measurement Device for Real-time Power System Monitoring (전력계통 실시간 감시를 위한 동기위상측정장치의 시작품 개발)

  • 김학만;전진홍;김종율;남기영
    • Journal of Energy Engineering
    • /
    • v.11 no.3
    • /
    • pp.230-236
    • /
    • 2002
  • In real-time power system control, it is essential to measure the power system variables which are voltage, current, real and reactive power, power factor, system frequency and etc. These variables can be estimated or calculated by the synchronized phasor informations of voltage and current. Therefore, the synchronized phasor measurement of voltage and current is very important to real-time power system control. So, we develop SPMD (Synchronized Phasor Measurement Device) for synchronized phasor measurement of voltage and current. In this paper, we present the design and implementation of SPMD for real-time phasor measurement and the test results of developed SPMD on 380 V 3 phase distribution line in laboratory with resistor load and RTDS (Real Time Digital Simulator).

A Study on Digital Voltage Relay (디지털 전압 계전기에 관한 연구)

  • Park, Chul-Won;Kang, Mool-Kyul;Kim, Ye-Ji;Hwan, Yun-Hui
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.756-757
    • /
    • 2011
  • 보호장치는 전력계통에 고장이 발생할 경우 신속 정확 하게 고장을 검출하여 고장부분을 계통으로부터 분리시킴으로써 각종 설비의 손상을 막고 정전구간을 최소화 하여 계통의 안정화를 향상시키는 장치이다. 현재 한전 및 발전사 뿐만아니라 수자원공사의 수도사업장에서도는 원격감시 제어를 통한 무인화와 함께 디지털보호계전기가 설치 운영되고 있다. 디지털 보호계전기는 기존의 기계식 보호계전기가 수행하는 보호기능보다 우수한 성능이 입증되었으며 최근 반도체 기술의 비약적 발전과 보호 알고리즘의 지속적인 개발로 보호계전기의 디지털화가 가속되고 있고 더욱 개선된 고성능, 다기능의 보호계전기 또는 IED가 산업현장에 적용되는 추세에 있다. 본 논문에서는 과전압 보호계전기와 부족전압 보호계전기의 기능 및 동작특성에 대하여 연구하였다.

  • PDF

Implementation and application of remote control system using LACC(Local Area Control Center) (LACC를 이용한 원격제어 시스템 구현 및 적용)

  • Park Tae-Jin;Jang Myung-Kee;Chung Seung-Ryul
    • Journal of the Institute of Electronics Engineers of Korea CI
    • /
    • v.43 no.4 s.310
    • /
    • pp.15-22
    • /
    • 2006
  • Nowadays, there is called energy saving, that it is accomplished with a lot study and application development as according to demand of all around world. It is using to network device of wire or wireless such as internet, lan, plc, and zigbee and that we should be accomplished to study about method that spending a little cost to fatal error in control system that be expected of frequent occurrence on network, and that have method to do construction a little bit tried out. Also, in that such a embedded system with network function case, there is important thing that it is remote management to network node and control methods to trust because firmware upgrade have the advantage of more than the other device. In this paper, we have verified through a result of experiment for efficient remote management and control method as previously stated in this paper, that it is area of the PLC for sensor node and doing management to relay, and implementation of the LACC which is core part of the ESS, and in order to get a result to trust from doing analysis of capacity and test.

A Study on Informative ATS (Automatic Train Stop) for Speed Improvement and Increment of Track Capacity on Existing Line (기존선 속도향상과 선로용량 증대를 위한 정보형 ATS 차상장치 개량)

  • Seo Jung-Wook;An Su-Kwan;Kim Bong-Taek
    • Proceedings of the KSR Conference
    • /
    • 2003.05a
    • /
    • pp.456-461
    • /
    • 2003
  • 기존선 속도 향상 및 병목현상 해소와 안전운행을 위해 국내 철도 현황의 주요 분야를 검토한 후, 국내 17년동안 사용으로 안전성이 검증된 신호기술을 바탕으로 국내 실정에 적합하며, 기존의 ATS 장치를 개선한 정보형 ATS(ATPS)를 개발하여 이를 제시하였다. 본 시스템은 운행 중인 열차의 제동특성을 고려하여 구간별 제한속도를 상향 조정하여 운행 효율을 증가 시킬 수 있다. 또, 안전성과 신뢰성 보장을 위해 Fail-Safe 및 이중계(redundancy)로 제작 하였고, 기존의 차상자와 발진기를 통합함으로써 Q factor를 개선하여 무응동 방지 및 기준 응동시간 비교방식을 통해 오동작을 개선하였다. 그리고, 정보기록 장치를 추가함으로써 이미 기록되어있는 차량정보데이터와 지상정보데이터를 연산하여 운전정보를 제공하고 기록한다. 또한, 이 운전정보는 정보 분석용 PC 및 프로그램에 의해 쉽게 분석, 관리가 가능하다. 무엇보다도 기존 ATS 구간과의 겸용사용으로 영업 운전시 안전한 연속 운행 보장 및 지상설비 개량 없이 안전을 확보할 수 있다. 다양한 종류의 동력차에 설치, 인터페이스 및 지상설비 개량이 용이하다. 향후 틸팅 시스템과 연계하여 틸팅 제어/감시 신호를 제공하는 기능을 갖는다.

  • PDF

Development of Neutron, Gamma ray, X-ray Radiation Measurement and Integrated Control System (중성자, 감마선, 엑스선 방사선 측정 및 통합 제어 시스템 개발)

  • Ko, Tae-Young;Lee, Joo-Hyun;Lee, Seung-Ho
    • Journal of IKEEE
    • /
    • v.21 no.4
    • /
    • pp.408-411
    • /
    • 2017
  • In this paper, we propose an integrated control system that measures neutrons, gamma ray, and x-ray. The proposed system is able to monitor and control the data measured and analyzed on the remote or network, and can monitor and control the status of each part of the system remotely without remote control. The proposed system consists of a gamma ray/x-ray sensor part, a neutron sensor part, a main control embedded system part, a dedicated display device and GUI part, and a remote UI part. The gamma ray/x-ray sensor part measures gamma ray and x-ray of low level by using NaI(Tl) scintillation detector. The neutron sensor part measures neutrons using Proportional Counter Detector(low-level neutron) and Ion Chamber Type Detector(high-level neutron). The main control embedded system part detects radiation, samples it in seconds, and converts it into radiation dose for accumulated pulse and current values. The dedicated display device and the GUI part output the radiation measurement result and the converted radiation amount and radiation amount measurement value and provide the user with the control condition setting and the calibration function for the detection part. The remote UI unit collects and stores the measured values and transmits them to the remote monitoring system. In order to evaluate the performance of the proposed system, the measurement uncertainty of the neutron detector was measured to less than ${\pm}8.2%$ and the gamma ray and x-ray detector had the uncertainty of less than 7.5%. It was confirmed that the normal operation was not less than ${\pm}15$ percent of the international standard.

A Study on Manufacturing Process Control and Monitoring System for Heat-Shrink-Tube Cutting Machine (열 수축 튜브 자동 절단 장치를 위한 공정제어 및 감시 시스템에 관한 연구)

  • Kim, Hyoung-Seok;Lee, Byung-Ryong;Yun, Ho-Young
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.32 no.12
    • /
    • pp.1140-1145
    • /
    • 2008
  • In conventional cutting system of Heat-Shrink-Tube, workers operate cutting system after considering about length and quantity of heat-shrink-tube. So, not only work time and production cost is increased but also material is wasted because the data that workers have to consider is so much. In this paper, an effective cutting system of heat-shrink-tube was developed to reduce production cost, work time and waste of material. The cutting system consists of a supervisory computer installed inside a control room, a on-site computer installed on the work area, and a PLC system. In the developed system, a supervisory computer send work order to the on-site computer using LAN and the on-site computer operates the cutting system of the heatshrink-tube after it makes an array production order. Also, the on-site computer reports information to the supervisory computer when an accident happened.

A study on the new high efficiency rectifier system (고효율 신형 정류시스템에 대한 고찰)

  • Kim, Gue-Hong;Jeong, Jae-Hoon;Cho, Man-Hyun;Ahn, Che-Hong
    • Proceedings of the KIEE Conference
    • /
    • 1999.07g
    • /
    • pp.3172-3174
    • /
    • 1999
  • 교환기나 전송장치 등 각종 통신설비에 전원을 공급하기 위해서 정류기, 축전지 및 발전기 등의 전원설비가 사용되고 있다. 이들 중에서도 정류기는 통신설비에 직류전원을 공급하기 때문에 다른 전원설비 보 다도 신뢰성 및 안정성이 확보된 장치로 인식되어 왔다. 그러나 현재 사내전화국에 설치 운용중인 정류기는 교환 기별로 종류가 다양하여 유지보수에 어려움이 내재하고 있을 뿐만 아니라 통신망의 광대역화, 대용량화에 대처가 곤란하며 정류기를 전력실 또는 통신실에 집중해서 설치 운용하는 집중공급방식으로는 축전지의 만충전이 곤란하다. 또한 현재의 이러한 급전방식은 통신장치의 광대역화, 고도화 등 통신망의 급격한 발전과 함께 다음과 같은 문제점이 대두되고 있다. 첫째, 전력실에서 총괄하여 교류전력을 직류48V로 변환해서 급전하기 때문에 급전전류가 크게되고, 또한 전력실에서 통신실까지의 급전손실이 크다 둘째, 통신설비의 증감에 따른 전원설비의 증감이 어렵기 때문에 설비 가동율이 나쁘다 셋째, 전원설비의 고장에 의한 전화국 전체설비에 심각한 영향을 미칠수 있다 이러한 문제점을 해소하기 위하여 집중 및 분산급전방식으로 운용이 가능하며, 또한 모든 전원설비를 감시/제어하는 전원 집중관리 시스템과의 인터페이스 등이 가능한 정류시스템을 1997년부터 개발하였다. 본고에서는 신형 정류기와 기존의 정류기와의 성능 및 특성에 대해 비교하였고, 특히 경제성측면과 설치상련에 대해 비교분석 하였다. 또한 집중급전방식과 분산급전방식의 특성에 대해서도 서술하였다.

  • PDF

A Study on the Reliability Verification of Real-time Railway Safety Integrated Monitoring and Control System (실시간 철도안전 통합 감시제어시스템 신뢰성 검증에 관한 연구)

  • Son, Sang-Hyun;Kim, Sang-Ahm;Kim, Young-Gon
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.21 no.6
    • /
    • pp.83-89
    • /
    • 2021
  • With the recent development of information and communication technology, there have been many attempts to apply various IT technologies in the railway field. Until now, the safety control system has been installed at the site and operated using actual data, but there is a problem that it is difficult to verify the function of the railway safety control system in that no accidents occur in real situations. In this study, accident data is generated randomly to verify that the safety control system is functioning properly, and to this end, simulation data is prepared according to the simulator, accident scenario and scenario. Real-time railway safety monitoring system collects and transmits data from interface devices to common protocol called DDS.