1 |
Kim, K. A. and Hong, S. H., 1998, “A Case Study on the Implementation and Performance Evaluation of Profibus Network in Automation Systems,” Trans. of Control∙Automation∙System Engineering, Vol. 4, No. 1, pp. 113-122
과학기술학회마을
|
2 |
Jung, T. S., Yang, M. Y. and Byun, C. W., 2003, “The Development of Distributed Tool Management System tailored for Injection Mold Production,” Trans. of the KSPE, Vol. 20, No. 4, pp. 118-127
과학기술학회마을
|
3 |
Piementel, J., 1990, “Communication Networks for Manufacturing”, Prentice Hall
|
4 |
Ko, D. K. and Lee, S. G., 2000, “Remote Monitoring and Control of PLC using TCP/IP Communication,” Conf. of KSPE, pp. 140-143
|
5 |
Kim, H. M., 2003, “A Study on Fuzzy Temperature Control for the Barrels of Injection Molding Machine using PC based PLC,” Trans. of Control∙Automation∙ System Engineering, Vol. 9, No. 10, pp. 768-773
과학기술학회마을
DOI
|
6 |
Kim, J. W., 1990, “PLC and Factory Automation,” Trans. of Mechanical Science and Technology, Vol. 30, No. 1, pp. 17-21
|
7 |
Zhang H., and et al., 1996, “On-line PLC Monitoring and Network Administering System for Steel Tube Mill,” Proc. of IEEE on Industrial Technology
DOI
|