Lee, Sunghee;Yun, Bo Ram;Kim, Deok Yeop;Kim, Hwangsoo;Lee, Woo Jin
Journal of KIISE
/
v.44
no.6
/
pp.601-606
/
2017
Recently, we have frequently encountered flying drones with the growth of drone industry. However, it is difficult for a driver to stabilize the motor speed of drones, since the voltage of a Lithium polymer battery used in drones may suddenly drop or rise when its power is exhausted. The instability of the motor speed precludes the drone from maintaining a flight altitude, so that the fuselage of a drone performs ascending and descending repeatedly. For solving this problem, existing techniques either add a compensator considering voltage drop of battery or change the control model. Since these techniques use hardware-implemented modules or depend on motor type and experimental results, there is a problem that new suitable modules should be implemented in accordance with the used motor of the fuselage. For solving this problem, in this paper, we implement a motor speed controller in the firmware of drones by considering voltage drop of battery to enhance drone flight stability.
Recently, Interest in power the quality was increased because of increasing the use of sensitive load equipment into an electrical disturbance such as computer, Electricity, Electronics, Telecommunications and semiconductor device. In addition, To enhance power quality, the instantaneous voltage drop occurred in precision load equipment is a need for proper compensation. In order to solve the problem, The developed dynamic voltage restorer (DVR) using an electric double layer capacitor (EDLC) has been applied. In this paper, We will do study to apply hybrid capacitors that have high energy density to the same size compared to the EDLC to DVR. Also, As a emergency luminaires of emergency power supply that we can support more than 10 years of life was confirmed the applicability of hybrid capacitor.
Kim, Sang-Kon;Choi, In-Kyum;Kim, Tae-Kon;Seo, Sung-Kyu
Journal of IKEEE
/
v.16
no.2
/
pp.109-115
/
2012
We propose a control system consisted of TRIAC PWM module and sequential start control system attenuating voltage-dip and inrush current caused by starting of inductive load network. To minimize the high voltage-dip and inrush current induced from a large capacity inductive load, we developed a TRIAC PWM module. And we also developed a sequential start control system preventing simultaneous starting of the inductive loads within a same power network. According to the experimental results with the proposed control system, the voltage-dip and inrush current could be effectively attenuated such that they can meet the related international standards and resolve the issues associated with simultaneous starting of multiple inductive loads. By employing this system, power cost usually implemented by the estimation of peak power consumption can be reduced and the power quality of a power distribution system connected to the inductive load network can be stabilized efficiently.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.22
no.5
/
pp.13-20
/
2008
Power quality problems such as momentary interruptions and voltage sags do not great influence on loads at past. However, the interests in power quality problems increase as the use of sensitive loads with microprocessor like computers increases recently. Accordingly, power system reliability research focusing to sustained interruption and momentary interruption partially needs more accurate evaluation methods including momentary and instantaneous problems. That is, many sensitive loads being tripped by voltage sags result in interruption costs. In this paper, new reliability worth evaluation method is presented considering voltage sags. We calculated the magnitude of voltage sags using fault studies and the duration of voltage sags using the trip time of protective relays for each fault. Moreover, we includes the customer interruption cost resulted from sensitive load trip by voltage sags. Through case studies, we evaluate the effects of voltage sags for permanent faults.
본 논문에서는 산업용 전력시스템의 전기품질을 평가하기 위한 고조파 해석기법을 제시하였다. 먼저 수변전계통의 전압강하, 고조파, 고장전류 등을 PTW Tool을 이용해서 시뮬레이션 하였으며, 실제 계통에서의 운전중 고조파 현상을 실측치와 비교 분석함으로써 기존 시뮬레이션 기법의 정확성을 검증하였다.
In this paper, we proposed the novel IGBT with an additional n-type MOS structure to achieve the improved trade-off between turn-off and on-state voltage drop(Vce(sat)). These low on-resistance and the fast switching characteristics of the proposed IGBT are caused by an enhanced electron current injection efficiency which is caused by additional n-type MOS structure. In the simulation result, the proposed IGBT has the lower on state voltage of 2.65V and the shorter turn-off time of 4.5us than those of the conventional IGBT(3.33V, 5us).
In this paper, we proposed the novel TIGBT with an additional p-type MOS structure to achieve the improved trade-off between turn-off and on-state voltage drop(Vce(sat)). These low on-resistance and the fast switching characteristics of the proposed TIGBT are caused by an enhanced electron current injection efficiency which is caused by additional p-type MOS structure. In the simulation result, the proposed TIGBT has the lower on state voltage of 1.67V and the shorter turn-off time of 3.1us than those of the conventional TIGBT(2.25V, 3.4us).
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.17
no.3
/
pp.119-126
/
2003
The size of low voltage level conductor cables can be installed with a long length just like a aviation field, shall be determined for considering the ampacity of cable and the drop of voltage for the power system. Therefore, The size of the conductor cables may be larger one for considering the tolerable voltage drop comparatively, although the allowable ampacity of the conductor cables may have a margin in comparison with the rated full load current In this case, the conductor cables' allowable ampacity will be very larger than the rated full load current and the generated heat of the conductor will be relatively downed. The conductor cables' alternating current resistance corrected with the maximum allowable temperature of the conductors, has been applied on the general formula for the calculating the voltage drop in determinating the size of low voltage level conductor cables, and the resistance is larger than the resistance corrected with the actual temperature of the conductor cables. This paper was studied for the purpose of the conductor resistance corrected with the actual temperature rise of the conductor and address the economic design formula so that this studies shall minimize the errors which can be occurred in comparison with the general formula and which can be applied in design work for determining the size of low voltage level conductor cables.
Journal of the Korea Institute of Information and Communication Engineering
/
v.9
no.1
/
pp.146-151
/
2005
This paper describes a new voltage disturbance generator for the performance test of a 1-phase UPS(Uninterruptible Power Supply). The proposed scheme has the ability of voltage sag, swell, and outage generation. The structure of the proposed generator is simple and cost-effective. The voltage disturbance can be generated with easy control system. The circuit operation and characteristics of the proposed converter are described and the usefulness of the converter is verified through computer simulations and experimental results.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.