• Title/Summary/Keyword: 적정 설계순위

Search Result 22, Processing Time 0.024 seconds

An Experimental Analysis of a Probabilistic DDHV Estimation Model (확률적인 중방향 설계시간 교통량 산정 모형에 관한 실험적 해석)

  • Jo, Jun-Han;Kim, Seong-Ho;No, Jeong-Hyeon
    • Journal of Korean Society of Transportation
    • /
    • v.27 no.2
    • /
    • pp.23-34
    • /
    • 2009
  • This paper is described as an experimental analysis for the probabilistic directional design hour volume estimation. The main objective of this paper is to derive acceptable design rankings, PK factors, and PD factors. In order to determine an appropriate distribution for acceptable design rankings, 12 probability distribution functions were employed. The parameters were estimated based on the method of maximum likelihood. The goodness of fit test was performed with a Kolmogorov-Smirnov test. The Beta General distribution among the probability distributions was selected as an appropriate model for 2 lane roadways. On the other hand, the Weibull distribution is superior for 4 lanes. The method of the inverse cumulative distribution function came up with an acceptable design ranking of design for LOS D. An acceptable design ranking of 2 lanes is 190, while an acceptable design ranking for 4 lanes is 164. The PK factor and PD factor of 2 lanes was elicited for 0.119 (0.100-0.139) and 0.568 (0.545-0.590), respectively. On the other hand, the PK factor and PD factor for 4 lanes was elicited as 0.106 (0.097-0.114) and 0.571 (0.544-0.598), respectively.

정보통신연구개발사업의 우선순위 설정과 적정자원 배분 - 다기준의사결정(MCDA) 방법의 적용사례 -

  • 황용수;장진규
    • Proceedings of the Korea Technology Innovation Society Conference
    • /
    • 1999.05a
    • /
    • pp.539-563
    • /
    • 1999
  • 이 논문은 정보통신정책 목표와의 연관성 속에서 정보통신연구개발사업의 우선순위를 설정함과 아울러 비용효과성에 바탕을 둔 적정 자원배분 도출하는데 주안점을 두고 있다. 복합적인 목표를 가진 연구개발사업에 대해 사업부문별 그리고 기술분야별로 객관적이면서도 설득력있는 자원배분지침을 마련하기 위하여 본 연구는 다기준의사결정(MCDA: Multi-criteria Decision Analysis) 방법을 채택하고 있다. 이 방법론에서는 사업의 목표와 우선순위 판단기준 및 사업대안이 계층적으로 연계된 분석구조를 설계하여 사업대안의 우선순위를 먼저 설정하고, 여기에 정수계획법(Integer Programming)을 결합하여 사업의 목표와 연계된 비용-편익 관계(Cost-benefit relationship)를 최적화하는 바탕 위에서 사업대안별 자원배분 시나리오를 제시하게 된다. 이러한 절차로 사업부문별 및 기술분야별로 각각 도출된 8개의 자원배분 시나리오는 자원배분 경향치의 안정성(Stability) 분석과 자금지원의 과부족에 대한 현실적 적합성(Relevance) 분석을 거쳐 최종적으로 하나의 적정 자원배분방안으로 수렴되도록 하였다. 우선순위 설정에 기초가 되는 사업대안의 편익에 대한 자료는 전문가의 정성적 판단을 통해 수집되었는데, 이를 위해 정보통신기술 부문에서 활동 중인 중견 이상의 총 58명의 산학연 전문가를 대상으로 한 조사를 실시하였다. 먼저, 기초기반ㆍ전략기술개발사업, 연구ㆍ기술인력양성사업, 산업응용기술개발사업, 기술기반조성사업 등 4대 사업부문에 대해서는 (ⅰ) 정보통신 기술능력의 축적, (ⅱ) 정보통신산업의 경쟁력 강화, (ⅲ) 정보통신기반의 기술고도화, (ⅳ) 정보화를 위한 기술역량의 제고 등 주요 사업의 편익을 나타내는 4개 기준으로 우선 순위를 판단하였고, 정보통신망기술, 전파 및 RF 기술, 정보처리기술, 반도체 소자/설계 기술 등 13개 기술분야에 대해서는 (ⅰ) 공공정책적 임무에 대한 기여, (ⅱ) 기술자립기반의 확충, (ⅲ) 기술발전성과 기술적 파급효과, (ⅳ) 기술적 산물의 시장잠재력 등 기술분야 연구개발을 통한 편익을 나타내는 4개 기준으로 우선순위를 판단하였다. 우선순위는 사업대안에 대한 가중치로 표시되었고, 적정 자원배분방안은 추정된 총예산 규모에 따라 지원수준에 대한 일정한 제약조건 하에서 비용-편익 관계에 따른 자원의 최적 할당량으로 제시되었다. 본 연구는 총예산 규모의 가변성, 사업 및 기술분야 대안의 분류체계에 대한 공감대 부족, 사업목표의 상호연관성과 우선순위 판단기준의 부분적 중첩성 등 여러 제약요인이 있어 도출된 구체적인 수치보다는 방향성에 더 큰 의미를 부여하는 것이 바람직하다. 그러나, 이러한 연구의 한계에도 불구하고 도출된 우선순위와 적정 자원배분방안은 문제해결의 실행타당성을 감안하여 비교적 객관적이고 균형있는 결과로 판단된다.

  • PDF

Time series property of the 30th Design Hourly Factors in National Highways (일반국도 30번째 설계시간계수의 시계열적인 특성 분석에 관한 연구)

  • Oh, Ju-Sam;Im, Sung-Man
    • International Journal of Highway Engineering
    • /
    • v.9 no.4
    • /
    • pp.1-9
    • /
    • 2007
  • To decide the number of road lane is very important and related to the 30th design hourly factor in the design of transportation facilities. But, as the quantitative division of road types is difficult, most planner and designer for deciding the 30th design hourly factors have used the fixed values in our country. In this study, we have analyzed the time series property of the design hourly factors in national highways and developed the model capable of estimating the 30th design hourly factors using real data. The presented model is a simple regression model(DHV = K*AADT), which is applied to the division of road lanes(2 or 4 lanes) and the level of AADT(3 levels). As a results, the simple regression model have better performance than the existing method with respect to MAPE and $R^2$. Also, the variations of the 30th design hourly factors are small. The more traffic volume increase, the more the factors decrease. But, the limitation of this study is to use the exiting method estimating the values of the factors, it is subject to study hereafter.

  • PDF

The Selection of Optimal Probability Distribution and Estimation for Design Hourly Factor in National Highway Roads (일반국도 설계시간계수의 적정 확률분포 선정 및 추정)

  • Jo, Jun-Han;Han, Jong-Hyeon;Kim, Seong-Ho;Lee, Byeong-Saeng
    • Journal of Korean Society of Transportation
    • /
    • v.24 no.6 s.92
    • /
    • pp.33-43
    • /
    • 2006
  • This research is to the selection of optimal probability distribution as well as the estimation for design hourly factor in consideration of traffic characteristic, such as road function, lane number and AADT. To accomplish the objectives, we are applied to various probability distribution using traffic data that observed at permanent traffic count points in 2005. The parameters or the selected 14 probability distribution were estimated based on the method of maximum likelihood and the validity condition of the estimated parameter The goodness-of-fit test, such as chi-square test. was performed as well as the estimation of design hourly factor. As a result, An appropriate distributions of each case were selected : Pearson V for two lane of rural roads, LogLogistic for the four lane of rural roads, LogLogistic for the urban roads, Extreme value for recreation roads. And optimal K factor are as following : $0.1{\sim}0.2 $ for two lane of rural roads, $0.09{\sim}0.14$ for the four lane of rural roads. $0.07{\sim}0.13$ for the urban roads, $0.1{\sim}0.2$ for recreation roads.

Applications of Channel Auto-Design System to flood inundation and bed change simulations in a small stream (소하천 홍수범람 및 하상변동 분석에 Channel Auto-Design System의 적용)

  • Kim, JongChun;Park, Sangwoo;Jeong, Jongho
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2019.05a
    • /
    • pp.210-210
    • /
    • 2019
  • 소하천정비종합계획의 핵심은 설계홍수량보다 하천 단면의 통수량이 부족하여 홍수시 범람할 수 있는 구간에 적정 하도계획을 수립하는 것이다. 하도계획을 수립하기에 앞서 기존 하천을 대상으로 홍수범람을 분석하여 범람 양상을 먼저 파악해야 하며, 이때 산정되는 예상피해액은 추후 편익-비용비를 바탕으로 소하천의 정비 우선순위를 결정하는 기초 자료로도 활용된다. 한편, 장래하상변동을 모의하여 안정하도 여부를 확인하는 과정 역시 중요한데, 수립된 하도계획에서 과도한 하상변동이 발생하면 통수 능력의 변화, 급격한 수위 변화 등 문제가 생길 수 있으므로 안정하도를 유지할 수 있는 대책이 동반되어야 한다. 따라서, 기존 하천의 평형상태 여부를 확인하고 이를 하도계획에 반영해야 적절한 종단계획을 수립할 수 있다. 소하천정비종합계획의 경우 지자체별로 적게는 수십 개부터 많게는 수백 개의 소하천을 대상으로 과업이 진행되기 때문에 홍수범람 및 하상변동 분석을 소하천마다 반복해야 한다. 이러한 배경에서 설계 편의를 위해 개발된 Channel Auto-Design System(안)은 효율성 증진, 설계의 표준화 측면에서 활용도가 높고, 이미 지방하천 12개소, 소하천 267개소를 대상으로 강우분석, 설계홍수량 산정, 하도계획 수립 단계에 적용되어 타당성이 검증되었다. 본 연구에서는 소하천정비종합계획 수립 과정 중 홍수범람 분석을 아우른 예상피해액 산정과 하상변동 분석을 통한 안정하도 검토에 초점을 맞춰 Channel Auto-Design System의 적용성을 추가로 검증하였다.

  • PDF

A Study on the Application of Safety Design based on the Risk of Construction Process (건설공정 위험성 기반 설계안전성 활용 방안 연구)

  • Lee, Hyeon-Sung
    • Journal of the Society of Disaster Information
    • /
    • v.15 no.4
    • /
    • pp.493-501
    • /
    • 2019
  • Purpose: The purpose of this study is to prevent construction safety accidents, and the design safety systems were reviewed. This paper aims to establish as an effective system by looking at the implementation procedures and contents of the design safety review system. Method: We reviewed the purpose and content of the law, accident statistics, etc. for the study. In addition, we looked at the implementation plans for actual construction sites using the 'design safety' assessment process as defined by the Act. Results: We divided it into the data review phase, the risk factor elicitation and alternative setup phase, and the design safety assessment report preparation stage. Conclusion: it is necessary to derive risk factors that take into account the diversity of construction sites. However, the effectiveness of other reports is questioned as they are often copied and written. Therefore, it is necessary to strengthen external verification procedures attended by construction safety experts.

Evaluation of the design return period and risk assessment for local rivers in Chungcheongnam-do considering climate change (기후변화를 고려한 지방하천 설계빈도 및 위험도 평가 : 충청남도를 중심으로)

  • Ryu, Jae Hee;Lee, Jin-Young;Kim, Ji Eun;Kim, Tae-Woong
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.35-35
    • /
    • 2021
  • 최근 우리나라는 기후변화로 인한 이상기후 현상으로 호우 및 홍수 등에 의한 수재해를 예방하기 위한 설계빈도 적용방안 개발이 필요하다. 과거 지방하천의 일률적인 설계빈도의 적용 및 간접·주관적인 하천의 중요도와 지역특성에 대한 등급의 결정은 하천사업의 효율적 관리와 수행에 있어서 저해요소로 작용되어 왔다. 또한, 미래 기후변화 시나리오에 따라 하천의 중요도 및 계획 규모가 적절히 적용되어야 한다. 본 연구는 충청남도의 492개 지방하천에 대하여 유역특성(유역면적, 형상계수), 하천특성(하도경사, 수계 및 하천차수, 배수영향 구간), 이상강우 특성(이상강우 발생빈도, 시가화 침수면적)에 대한 현재 설계빈도에 대한 적절성을 평가하였다. 설계빈도에 대한 정량적 추정은 베이즈 이론을 활용하여 가중치를 산정한 후 최적분포형을 선정하였다. 최적분포형의 중앙값을 일반적인 지방하천의 설계빈도인 80년 빈도로 설정하고 상·하위 0.5%가 각각 100년, 50년 빈도로 가정하여 492개 지방하천을 평가하였다. 이상강우의 발생빈도와 시가화 침수면적에 따라 하천의 설계빈도가 높게 산정되는 것으로 분석되었다. 미래 기후변화 시나리오를 적용할 경우 현재 설계빈도(설계수명)에 대한 시나리오별 미래 재현기간을 산정하여 미래 설계빈도에 대한 위험도를 평가하였다. 13개 기후변화 시나리오의 대표농도경로 4.5와 8.5를 분석한 결과, 평균 3.2%, 12.8%의 위험도가 증가하는 것으로 분석되었다. 본 연구결과는 객관적인 지방하천의 적정 설계빈도 결정방안을 제시하였으며, 미래 계획홍수량 증가로 인하여 효율적인 토지이용이 제한될 것으로 예상됨에 따라 하천사업의 예산절감 및 우선순위 결정 등에 활용 가능할 것으로 판단된다.

  • PDF

Development of Forest Thinning Evaluation Factors using the Analytic Hierarchy Process (AHP를 이용한 숲가꾸기 사업종별 평가지표 중요도 산정)

  • Park, Joowon;Cho, Seungwan;Jung, Geonhwi;Kim, Bomi;Woo, Heesung;Lee, Yohan
    • Journal of Korean Society of Forest Science
    • /
    • v.109 no.3
    • /
    • pp.350-360
    • /
    • 2020
  • The purpose of this study was to identify and prioritize the key indicators and drivers of forest thinning. The research for this study was designed in two-phases: 1) sequential, exploratory, mixed methods research that was initiated with a qualitative phase (Delphi technique), and 2) the quantitative phase (Analytic Hierarchy Process technique). Results indicated that management and planning were the most important factors in the first level of criteria among the "management and planning," "directing and monitoring," "supervision," and "quality of thinning work." On the sub-criteria level, "the quality of forest management planning" was indicated as the most important factor among the ten sub-criteria. Our results have shown that the developed forest thinning evaluation factors were a well-represented characteristic for a variety of forest thinning work in Korea.

Analysis of Delay Factors Based on Importance of Construction Subject-classified in Apartment Finishing Works (공동주택 마감공사 공사주체별 작업지연 요인 분석)

  • Lee, Seung-Hoon;Kim, Yong-Man;Kim, Ju-Hyung;Kim, Jae-Junn
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.1
    • /
    • pp.73-81
    • /
    • 2011
  • The ultimate goal of construction is to complete the given work in the most economical and safest way within the required construction period while meeting the quality standards specified in the design drawing. There are a few characteristics of finish work. First, executed in subdivided processes, finish work involves a very diverse and complex structure. Second, there are no criteria for each segmented process with regard to the appropriate time of input. Third, it is not very necessary to set priorities for lead and lag works. This study intends to provide information on the completion of a project in accordance with the required duration by setting priorities in the delay of each detailed process of finish work to minimize delay in finish work. In this study, finish work is divided into wet work and other types of finish work, and the importance of each process is classified based on the given details of each process. In addition, the study employs a survey to analyze delay factors of a designer, a constructor, and a supplier. Using the survey results, the study sets priorities in delay of final work to provide information on the completion of an apartment project within the planned construction period.

A Study on the Application of Bus Route Sketch Methodology Based on Multiple Evaluation Indicators: Focusing on a Bus Line in Sejong (다중 평가지표 기반의 버스노선 스케치 방법론 적용 연구: 세종시 버스노선 사례를 중심으로)

  • Jun-Yong Jang;Sung Hoo Kim
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.23 no.2
    • /
    • pp.50-68
    • /
    • 2024
  • This study developed a bus route sketch (BRS) methodology for utilizing bus route design and operation steps in practice and evaluated the feasibility of the method. The BRS methodology consists of three steps: transportation zoning suitable for the provider and users of bus transit service; determining the bus operation route based on established transportation zones and path combination; optimizing the operation route based on the estimation of route alternatives in terms of the multi-performance measures from the standpoints of bus-transit service provider and user. The results of a case study showed that the estimation scores from the perspectives of provider and user were improved significantly from 8.83 and 7.13 to 9.50 and 9.89, respectively. Because the BRS method was designated and developed to be suitable for field application for route planning and operation, the method can be used instantly and directly to estimate and adjust the on-operation bus transit line and route design.