• Title/Summary/Keyword: 적정공사비

Search Result 140, Processing Time 0.03 seconds

Study on Improvement of Cost Calculation Method in Construction less than One Day Workload (1일 작업량 미만 공사의 공사비 산정 방식의 개선방안에 관한 연구)

  • Shin, Dae-Woong;Lee, Young-Do;Shin, Yoonseok;Kim, Gwang-Hee;Yoo, Sangrok;Park, Wonjun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.5
    • /
    • pp.477-485
    • /
    • 2014
  • Standard production unit system and historical cost data are the most typical data base for calculating budget price in construction. However, these construction cost estimation methods are difficult to calculate proper construction cost because definition, additional allowance or modification criteria is not clear in construction within one day. Therefore, this study identifies problems for standard production unit system and historical cost data and suggests the improvements for them. For the objectives, this study analyzes frequency after implementing survey for 44 specialty contractors in placing at kyeonggi-province. As the results of the study, labor costs in standard production unit system and equipment costs in historical cost data and in construction of pavement and maintenance by project type was exceeded at most high rate against construction cost estimation methods. Based on this result, standard production unit system and historical cost data need to be modified by three improvements such as classification by project scale. These will be baseline data for improvement of construction cost estimation methods for less than one day workload.

A Study on the Analysis of Cost Adjustment Scenarios by Bidding Method through Analysis of the Total Project Cost Management Process (총사업비 관리 프로세스 분석을 통한 입·낙찰 방식별 공사비 조정 시나리오 분석 연구)

  • Kim, Kyeongbaek;Lee, Gayeoun;Kim, Sangbum
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.2
    • /
    • pp.30-38
    • /
    • 2020
  • Inadequate cost management has widely been recognized as one of the most problematic areas in the Korean construction industry as many believes that public cost references are not reasonably reflecting the market conditions. 'Total Project Cost Management Guideline' developed by Ministry of Economy and Finance(MOEF) to govern public budget control has been identified as one of the main reasons for this problem. This study attempts to thoroughly review 'Total Project Cost Management Guideline' itself and quantitatively analyze the impact of it on project cost during procurement process. Different procurement methods are considered including turnkey & alternative, private contract, qualification examination, and lowest price bidding system in this quantitative impact analysis of 'Total Project Cost Management Guideline'. Analysis results shows that this governmental process works mainly as a constant cost-cutting tool throughout the procurement process.

The Study on the System to Estimate the Cost by Using Regression in the Early Stage of the Project (공사 초기단계에서의 회귀분석을 이용한 최종공사비(EAC) 추정 방법)

  • Lee, Youn-Mi;Lee, Man-Hee;Lee, Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.274-277
    • /
    • 2006
  • The EAC(Estimate at Completion) among existing methods, which estimate cost and time effectively, help managers anticipate changeable several results at the point of $15{\sim}30%$ in the project progress. However, this method may cause such some problems as not to consider the periodically changing circumstances caused by construction risks or uncertainties which can affect the cost and time in the project, and to regard collected and accumulated data only as a single value when predicting the results on the progress. Accordingly, it is very difficult to accept the even small range of variability based on the anticipation of EAC. Consequently, the study focuses on the possibility methodology to anticipate time and cost accurately on the way to utilize EVMS(Earned Value Management System), and also suggest the way to perform the right estimation of EAC as considering various risks and uncertainties in construction projects.

  • PDF

Development of an Approximate Cost Estimating Framework for River Facility Construction at Planning Stage (하천시설물 공사의 기획단계 개략공사비 산정체계 개발)

  • Shin, Jung Min;Woo, Sungkwon;Lee, Si Wook;Kim, Ok Ki
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.371-381
    • /
    • 2008
  • The systematic methodology for estimating construction cost approximately at planning and pre-design phase of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. This research suggests a 4-level cost information structure and identifies critical factors affecting construction cost as a result of thorough analysis of accumulated historical cost data of river facility construction projects. Also, this research presents the framework of the approximate cost estimating methodology for river facility construction project a planning stage.

A Study on the Analysis of Actual costs and Maintenance costs for Elemental Classification hierarchy (부위별 분류 체계를 통한 공사비 및 유지관리비 분석 - 교육 시설물을 중심으로 -)

  • Kang, Hyun-Wook;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.1
    • /
    • pp.142-150
    • /
    • 2010
  • The purpose of this study is to analyze maintenance costs and estimation of elemental costs for educational buildings. The adapted research method selected four school buildings in seoul region as BTL projects. On the basis of the selected case, the study suggested a model to establish a system for each parts and estimate analyzed construction costs and maintenance costs according to that system. According to the analysis, the study proposed a partial construction costs analysis table and maintenance costs table and analyzed proper construction costs and maintenances costs. The results of this study are as follows 1) The average ratio followed by calculation of partial construction costs of the four school buildings are as followings. The total construction costs is analysed 6,666million won and each part of average rations is structure 47.15%, exterior of building 8.34%, interior of building 23.37%, electricity & fire fighting facility 5.74%, water supply & healthy facility 4.27%, heating & water supply facility 5.25%, landscape 1.36%, civil engineering works 4.51%. 2)The average ratio followed by analysis of partial maintenance costs of the four school buildings are as followings. The total maintenance costs is analysed 4,309 million won and each part of average ratio is exterior of building 11.02%, interior of building 41.81%, electricity & fire fighting facility 14.81%, water supply & healthy facility 11.22%, heating & water supply facility 12.76%, landscape 5.75%, civil engineering works 2.63%.

A Study on the Estimation of the Proper Rate of safety Management Expenses under the Construction Technology Promotion Act (건설기술진흥법상 안전관리비의 적정요율 산정에 관한 연구)

  • Na, Sang-Gon
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2022.10a
    • /
    • pp.181-182
    • /
    • 2022
  • 건설재난을 줄이기 위한 정부의 노력에도 불구하고 건설기술진흥법의 안전관리비가 실제 현장을 반영하지 못한다는 지적이 제기돼 왔다. 따라서 건설사고 예방을 위한 가장 근본적인 대책으로 삼을 수 있는 안전관리비의 적절한 가이드라인을 연구할 필요가 있다. 또한 합리적인 안전 관리 비용을 확보하기 위해서는 적절한 비율을 계산하는 것이 중요하다. 따라서 본 연구에서는 안전관리비 실행계획에 따른 공사비 및 유형별로 적정 안전관리비율을 제시하였으며, 그 비율은 산업안전보건관리비의 10분의 1로 분석된다. 본 연구결과는 적정 공정등급제 개선 및 시범사업 추진에 대한 지침이 될 것이다.

  • PDF

초고층 건물의 층고저감을 위한 공조시스템

  • 신현준;김보철
    • The Magazine of the Society of Air-Conditioning and Refrigerating Engineers of Korea
    • /
    • v.31 no.1
    • /
    • pp.9-14
    • /
    • 2002
  • 산업의 발전에 따른 도시화의 영향으로 대도시에서는 가용공간을 확보하기 위하여 건물의 고층화와 지하공간의 개발이 활발하게 이루어지고 있다. 최근 증가추세에 있는 초고층주상복합건물, 초고층아파트는 건물의 높이가 증가함으로 인하여 건축공사비의 증가는 물론 설비적인 측면에서는 저층부의 수압이 상승 하여 높은 수압과 수격작용(water hammer)에 대한 배관 및 기기의 내압강도와 안전대책이 요구된다. 또한 건물의 초고층화로 인하여 열원에서 공조기까지, 공조기에서 실내기기까지의 수직거리 (vertical distance)가 길어지게 되어 연장된 공조덕트 및 배관 의 길이로 인해 반송동력비의 상승에도 큰 영향을 미치게된다. 이러한 문제점을 해결하기 위하여 기기 및 재료의 선정시 내압을 고려하거나 기기의 적정배치와 조닝(zoning)을 통해 상기의 문제점을 해결하는 방법을 적극 채용하고 있다. 하지만 보다 근본적인 문제해결 방법으로 건물의 층고저감에 의한 건축공사비 및 연 간운전비의 절감을 통한 건물에서의 소비에너지량 감소로 부존자원이 부족한 우리나라의 에너지수급정책에 기여하여야 할 것이다. 본 고에서는 건축물의 층고저감 효과를 얻을 수 있는 공조시스템에 대해 전반적으로 기술하고자 한다.

  • PDF

A Study on Economical Ways to Design Underground Distribution Line (경제적 지중배전선로 구성에 관한 설계방안연구)

  • Lee, Hu-Young;Wong, Yoon-Chan
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.373-374
    • /
    • 2007
  • 지중배전관로공사 설계시 고려할 사항은 지중배전관로 공수산정, 적정관로 선정, 매설위치 및 매설깊이, 관재의 선정, 관로의 경간, 관로배열 등이 고려되어야 한다. 관로공사비는 굴착깊이와 굴착폭에 의해 산정되고 이는 관로배열, 굴착지반의 토질에 따른 굴착구배, 용수여부, 도로관리기관의 조례, 다짐정도, 작업환경, 작업시간 등에 의해 변화하게 된다. 이런 현장조건 들은 설계자가 바꿀 수 없는 요소이지만 관로배열을 어떤 형태로 하여 매설할지는 설계자가 정하여야 한다. 본 연구에서는 경제적인 관로배열을 선정하기 위해 관로공수별, 관로유형별 공사비를 산출하여 비교 검토하였고 현장에서의 공사시공성, 케이블의 허용전류 등을 종합적으로 고려하여 최적의 관로배열을 제시하였다.

  • PDF

A Neural Network Model for Selecting a Piling Method of Building Construction (건축공사 말뚝공법 선정을 위한 신경망 모델 개발)

  • Cheon Bong-Ho;Koo Choong-Wan;Um Ik-Joon;Koo Kyo-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.317-322
    • /
    • 2004
  • As a construction project in urban area tends to be high-rise and huge, the importance of the project's underground work, in terms of the cost and the schedule, is gradually increasing. It's extremely significant to choose a proper filing method, at the stage of underground work. However, in piling work many change orders have been occurred since a piling method is experientially selected based on uncertain information and many earth factors to consider. It has effects on the cost and the schedule of the project. In this study, we have suggested a decision model for piling method that can be used to determine and verify the suitable piling method in design and pre-construction phase of a project. Based on historical data, a neural network model has already proven to be efficient. The tests of the model for selecting a suitable piling method have progressed exactly with the data of 150 piling works which were done room 2000 to 2004 in Korea. The optimization or the developed neural network model has progressed with the data for teaming. The validity of the neural network model has been verified.

  • PDF

Presumption Method for Optimum Correction Rate of Total Construction Cost Using the Median based on Historical Data Analysis in Public Office Buildings (공공건축물 실적자료 분석에 따른 중위수를 활용한 총공사비의 적정보정율 추정방법)

  • Yim, Jin-Ho;Park, Jun-Mo;Kim, Ok-Kyue
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.5
    • /
    • pp.415-422
    • /
    • 2014
  • There is growing difference between a planned value and an actual cost for increasing as an risk of construction cost. A construction cost index is an alternative to redeem a problem, but it is still very difficult to reduce an actual differential as a price fluctuation. Furthermore an existing theory of a construction cost index is overly complex, and is unsuitable for using in working-level. This study suggests an optimum correction rate in respect of a total construction cost. It is analyzing the actual cost of 53 public buildings that the Public Procurement Service ordered. The objects are main processes that include architectural works, mechanical works, electrical works, telecommunication works, and service facilities. It is compared a total construction cost based on absolute error rate using the median from frequentist principle. For this, it is selected the suitable regression model and set a correction rate.