Quantitative Analysis of Work Type's Rework Cost in Construction Project (건설공사 공종별 재작업 비용의 정량적 분석)

  • Chi, Sung-Joon;Park, Jung-Eun;Cha, Yong-Woon;Han, Sangwon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.237-238
    • /
    • 2016
  • Rework is a major cause that adversely affects the performance of a construction project, such as schedule delay or cost overrun. In order to prevent rework, research has been mainly conducted to analyze the cause of rework, but limited to quantitatively measure cost of rework and analyze its impact on project performance. Therefore, this paper aims to analyze impact of rework cost using 369 rework items collected from 3 construction site. This research is expected to accurately determine control target of rework and to improve efficiency of business operations in construction project.

  • PDF

Reviews oil the Redesign Methodology of Access Network (효율적인 비용모형을 위한 가입자망 재설계방법론 고찰)

  • 권수천
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2000.05a
    • /
    • pp.72-76
    • /
    • 2000
  • 본고에서는 합리적인 접속료산정을 위해 개발되고 있는 통신망비용 산정모형중 미국의 BCPM을 중심으로 비용모형수립의 사전작업인 통신망 재설계방법에 대해 분석하고 있다. 현재 주어진 통신망을 전제로 하지 않고 보다 효율적인 비용을 산정한다는 취지하에 효율적인 통신망을 재설계한 후, 이를 토대로 통신망비용을 산정하고 있다. 따라서 통신재설계방법은 구체적인 비용산정에 중요한 영향을 미친다 우선 특정 알고리즘을 이용하여 가입자의 위치를 보다 정확히 파악하고 이를 토대로 기술적 제약조건과 이용가능한 통계자료를 토대로 효율적인 가입자망을 재설계하고 있다. 이러한 접근방법의 분석은 현재 논의가 되고 있는 우리나라의 통신망비용모형 설정방향을 수립하는데 많은 도움이 될 것이다.

  • PDF

포커스: 한솔제지, 보상 대폭 확대한 '클레임 Zero, 100% 보상제' 시행

  • Kim, Sang-Ho
    • 프린팅코리아
    • /
    • v.10 no.4
    • /
    • pp.90-91
    • /
    • 2011
  • 한솔제지(대표 권교택)는 기존 시행되던 고객보상제도를 더욱 확대하는 것을 내용으로 하는 '클레임 Zero, 100% 보상제'를 지난 3월부터 시행하고 있다고 밝혔다. 인쇄사에서 용지불량으로 인한 금전적인 손해가 발생할 경우에 제품 비용 외에 재작업 비용까지 100% 보상하게 되는 것을 주된 내용으로 하며 지역별 담당제로 운영하여 클레임이 접수될 경우, 당일에 신속하게 처리를 완료하도록 운용하고 있다고 밝혔다. 한솔제지가 이처럼 확대된 클레임 보상처리를 하는 것은 인쇄업계와의 상생을 위해 실질적인 노력과 결실을 거두겠다는 경영진의 의지가 큰 영향을 끼쳤다.

  • PDF

한국과 미국기업 경영혁신 작업의 핵심성공요인과 성공인식에 관한 비교 연구

  • 박문규;황현숙;김갑수
    • Proceedings of the Korea Association of Information Systems Conference
    • /
    • 1998.10a
    • /
    • pp.131-136
    • /
    • 1998
  • 경영혁신 작업에 대한 연구는 대부분 기술적인 측면과 전략적인 측면이 강조되어 왔고 혁신적인 업무처리 과정에 효율적으로 적응하기 위한 기업의 환경에 대해서는 종종 무 시되어 왔다. 본 연구에서는 경영혁신 작업에 영향을 주고 있는 조직·관리적인 요인을 바탕 으로 기존 연구된 한국 및 미국의 핵심 성공요인을 비교 기술한다. 또한, 한국 및 미국기업 경영혁신 작업의 성과를 비교한다. 분석에 사용한 성과 요인들은 업무처리 시간의 단축, 업 무처리 비용의 감소, 직원들이 기술력이나 업무처리 능력의 향상, 양질의 생산처리, 직원들 삶의 질 향상, 고객 만족도 향상 및 요구변화에 대한 적응력 등이다. T-test를 이용하여 분 석한 결과, 모든 작업성과에 대해 미국기업이 한국 기업보다 높게 나타났다. 이러한 결과는 한국 기업의 경영혁신 과정은 불필요한 업무들을 과감히 폐기한 후 창의적인 업무처리 과정 의 재설계가 필요하다고 판단된다.

  • PDF

Redeveloped Work Criteria and Cost Unit in Grassland Establishment (초지조성방법에 따른 작업항목의 재설정 및 초지조성단가 추정)

  • Yoon, Byung Ku;Kim, Ji Yung;Kim, Byong Wan;Sung, Kyung Il
    • Journal of The Korean Society of Grassland and Forage Science
    • /
    • v.42 no.1
    • /
    • pp.32-40
    • /
    • 2022
  • In this study, the appropriate unit cost in grassland establishment was redeveloped by the grassland establishment method and work criteria. The grassland establishment method was divided into tillage establishment (all logging) and no-tillage establishment (all logging and partial logging). The price for the work criteria by the establishment method was presented for each permission/authorization and establishment work. In permission/authorization for grassland establishment, the cost of each work criteria was of environmental impact (small scale environmental impact) assessment, disaster impact assessment, cadastral serving fee, forest survey, and connection fee for control of mountainous districts. In establishment was of logging, cleaning/gruffing, plowing/soil preparation, seeding, fertilization, livestock manure compost, seed, herbicide, labor cost (fertilizer, seed and herbicide), soil consolidation, cattle trail, and fence. The unit cost of grassland establishment was KRW 115,894,212 for the tillage establishment, and KRW 110,281,572 and KRW 106,680,122 for the all and partial logging of the no-tillage establishment, respectively. The current study redeveloped the establishment method, work criteria, and estimation of the unit cost of grassland establishment. It can be usefully used to carry out government projects to support related to establishment and maintenance of grassland.

Development of optimal process planning for Exit Burr minimization in milling operation (절삭가공 시 Exit Burr의 최소화를 위한 최적 가공계획 알고리즘의 개발)

  • Kim Young-Jin;Kim Ji-Hwan;Jung Hee-Chul
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2006.05a
    • /
    • pp.1596-1602
    • /
    • 2006
  • 대부분의 금형 제작에 있어서 face milling은 가공물의 표면을 매끄럽게 하는 가장 중요한 마무리 공정이다. 이 마무리 단계에서 burr의 형성은 가히 탐탁지 않은 현상중의 하나가 된다. 또한, burr는 가공물의 정밀도를 감소시키고 작업자의 안전에 영향을 미치기 때문에 이를 제거하기 위해 후처리(deburring)과정을 야기 시키며, 불필요한 비용의 발생과 작업의 병목현상을 불러오게 된다. 따라서, burr의 생성 원리를 이해하고 burr의 발생을 최소화 할 수 있는 연구가 필요하게 된다. 이를 바탕으로 deburring의 비용을 줄일 수 있는 최적의 가공계획을 수립해야만 제품의 정밀도를 높일 수 있고, 작업 능률과 생산성을 향상시킬 수 있다. 본 논문에서는 지금까지의 연구보다 좀더 현실적으로 접근하기 위하여 피삭재의 형상이 line, arc, circle, spline 등의 여러 가지 형상으로 복합적으로 이루어진 복합형상에 대하여 burr의 발생을 연구하였고 이에 다중가공 경로까지 고려하여 burr의 형성을 예측할 수 있는 알고리즘을 수립하였다. 더 나아가 본 연구의 궁극적 목적인 burr를 최소로 발생시키는 가공경로를 설계할 수 있는 시스템을 개발하고자 한다

  • PDF

Test Method to Evaluate the Fiber Material Properties of Filament Wound Composite Pressure Vessel (필라멘트 와인딩 복합재 압력용기의 섬유 방향 물성 평가 기법)

  • Hwang, Tae-Kyung;Park, Jae-Beom;Kim, Hyoung-Geun
    • Composites Research
    • /
    • v.23 no.3
    • /
    • pp.37-42
    • /
    • 2010
  • The fiber material properties, elastic constant and strength, are the most important factors among the various material properties for the design of composite pressure vessel, because of it's dominant influence on the performance of composite pressure vessel. That is, the deformation and burst pressure of pressure vessel highly affected by the fiber material properties. Therefore, the establishment of test method for exact fiber material properties is a priority item to design a composite pressure vessel. However, the fiber material properties in filament wound pressure vessel is very sensitive on various processing variables (equipment, operator and environmental condition etc..) and size effect, so that it isn't possible to measure exact fiber material properties from existing test methods. The hydro-burst test with full scale pressure vessel is a best method to obtain fiber material properties, but it requires a enormous cost. Thus, this paper suggests a newly developed test method, hoop ring test, that is capable of pressure testing with ring specimens extracted from real composite pressure vessel. The fiber material properties from hoop ring test method showed good agreement with the results of hydro-burst test with full scale composite pressure vessels.

조립 용이화를 위한 구조 설계

  • 목학수;정남수
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1990.04a
    • /
    • pp.209-219
    • /
    • 1990
  • 커피 포트는 60여개의 부품으로 조립되어 있는 제품으로써, 다품종 대량 생산되는 제품이다. 이러한 제품을 설계할 때에는 소비자의 기호에 맞게 모델을 다양화 하여야 하며, 제품과 품질, 성능등 제품측면과 서비스, 가격등 판매측면에서도 세심한 전략이 필요하다. 이는 제조 기업 대부분이 해결해야 할 과제이다. 그러므로, 작업자의 임금 상승, 경쟁 회사와의 가격 경쟁 등 기업 내외적 원가 상승 요인에 효과적으로 대처하여야 한다. 그 한 방법으로 제품을 구성하고 있는 부품을 분석, 검토하여 부품수를 줄이고 자동화 정도를 높이며, 조립의 용이성과 유연성을 갖는 제품의 구조적 재설계를 수행하여 조립 경비를 줄이는 것을 들 수 있다. 따라서, 본 연구에서는 커피포트를 대상으로 조립의 용이화를 위한 구조 설계를 할 때 고려되어야 할 여러가지 설계 단계와 영향 요소등을 체계적으로 고려하여 작업자, 공정, 조립기계, 재료등 조립 수행 측면에서의 비용을 절감할 수 있는 방향을 제시하고자 한다.

  • PDF

Alternative Evaluation Model for Tower Crane Operation Plan in Modular Construction - Focusing on Modular Unit Installation and Finishing works - (모듈러 건축 타워크레인 운용 계획의 대안 평가 모델 - 유닛 설치 및 마감공사를 중심으로 -)

  • Kim, Joo Ho;Park, Moonseo;Lee, Hyun-Soo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.50-60
    • /
    • 2018
  • Recently, modular construction method has been widely applied to projects with repetitive processes including dormitory, the residential facility, and the hotel construction due to reduced labor input and shortened construction schedule. Generally, about 40% of total on-site construction cost excluding unit installation cost, is put on exterior finishing work, and thus management of finishing work is deemed important in maintaining the targeted schedule and cost. Since limited equipment is shared so that subsequent activities are not affected while carrying out on-site installation and finishing work, lifting plan becomes more important for modular projects with greater portion of finishing work load. In this regard, tower crane operation plan may take the form of a single cycle or multiple cycles in which equipment efficiency can be affected. However, difficulties exist in evaluating alternatives to tower crane operation plans supporting unit installation and finishing work. Therefore, this study aims to evaluate the alternative of tower crane operation method according to the cyclic period setting in modular building site to determine the effect on T/C uptime and process by parameterizing lifting time for unit and exterior finishing material, lift cycle for unit and exterior finishing material and time required for finishing work. Accordingly, this study develops a simulation model that can increase the tower crane efficiency by controlling the work speed. An academic contribution of this study is to suggest a resource leveling method applying the concept of lifting cycle, and further is expected to be managerially used as a basis for an alternative evaluation of equipment plan.

Overlapping Design-Build-Test Cycles in Vehicle Development Process : System Dynamics Approach (시스템 다이나믹스를 이용한 자동차 개발 단계에서 Design-Build-Test Cycle의 중복에 대한 연구)

  • Lee, Sang-Don;Lim, Ik-Sung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.29 no.3
    • /
    • pp.25-32
    • /
    • 2006
  • 자동차 개발 단계는, 본질적으로, 수차례의 개발 단계를 거치면서 설계 그룹들 간의 정보 전달과 교환이 여러 차례 반복적으로 발생하게 된다. 이러한 복잡한 상호 정보 교환 과정을 정확하게 이해하여 업무가 수행되지 못하면 불필요한 재작업을 야기시킬 수 있으며, 이는 비용 낭비 및 계획에 차질이 발생할 수 있다. 이 연구에서는 시스템 다이나믹 모델을 개발하여 빈번한 design-built-test 싸이클이 자동차 개발 단계에 미치는 영향 및 이점들을 고찰하였다.