1 |
Krishnan,V., Eppinger, S. D., and Whitney, D. E.; 'Accelerating product development by the exchange of preliminary product design information,' J Mechanical Design, 117 : 491-497, 1995
DOI
|
2 |
Paul,M.; 'Moving from blame to accountability,' The System Thinker, 8(1), 1997
|
3 |
Robers,E. B.; The dynamics of research and development,New York : Harper & Row,1964
|
4 |
Smith, P. R. and Eppinger, S. D.; 'Identifying controlling features of engineering design iteration,' Management Science, 43(3) : 276-293, 1997
DOI
ScienceOn
|
5 |
Smith,P. R. and Eppinger,S. D.,'A predictive model of sequential iteration in engineering design,' Managemenl Science,43(8) : 1104-1120,1997
DOI
ScienceOn
|
6 |
Eppinger, S. D.; 'Model-based approaches to managing concurrent engineerin g,' Journal of Engineering Design, 2(4), 1991
|
7 |
Cooper,K. G.; 'Benchmarks for the project manager,' Project Management Journal, 1993
|
8 |
Cooper, K. G.; 'Naval ship production: a claim settled and a framework built,' Interfaces, 10(6) : 20-36, 1980
DOI
|
9 |
Steward,D. V.; 'The design structure system: a method for managing the design of complex systems,' IEEE Transactions on Engineering Management, 28(3) : 71-74, 1981
|
10 |
Cooper, K. G.; 'The rework cycle: why projects are mismanaged,' PMNETwork, 1993
|
11 |
Richardson, G. P. and Pugh, A. L.; Introduction to system dynamics modeling with Dynamo,MIT Press, Cambridge, MA, 1981
|
12 |
Clark, K. B. and Fujimoto, T.; Product development performance: strategy, organization, and management in world auto industry, Harvard Business School Press, Cambridge, MA., 1991
|
13 |
Rodrigues A. and Bowers, J.; 'System dynamics in project management: a comparative analysis with traditional methods,' System Dynamics Review, 12(2) : 121-139, 1996
DOI
|
14 |
Clark, D. W.; 'Bugs are good: a problem-oriented approach to the management of design engineering,' Research Technology Management, pp. 23-27, May-Jun. 1990
|
15 |
Cooper, K. G.; 'How it really works and reworks,' PMNETwork, 1993
|
16 |
Krishnan,V.; 'Managing the simultaneous execution of coupled phases in concurrent product development,' IEEE Transactions on Engineering Management, 43(2), 1996
|
17 |
Robers, E. B.; 'A simple model of R&D project dynamics, R&D Management, 5(1), 1974
|
18 |
Blackburn, J. D.; New product development: the new time wars, In : Time-based competition,Business One Irwin, Homewood, IL., 1991
|
19 |
Kusiak, A. and Wang, J.; 'Efficient organizing of design activities,' International Journal of Production Research, 31(4) : 753-769, 1993
DOI
ScienceOn
|
20 |
Ford,D. N.; The dynamics of project management, Ph.D. thesis, MIT, 1995
|
21 |
Cooper, K. G.; 'The $2,000 hour: how managers influence project performance through the rework cycle,' Project Management Journal, 15(1) 11-24, 1994
|
22 |
Ha,A. Y. and Porteus,E. L.; 'Optimal timing of reviews in concurrent design for manufacturability,' Management Science, 41(9) : 1431-1447, 1995
DOI
ScienceOn
|